You are on page 1of 150

PT Sejahtera Bersama

Perusahaan Dagang Mainan

Talenta.co
DATA :
SUBYEK :
PERIODE :

NO ID NAMA JABATAN STS GAJI POKOK TUNJANGAN

1 CN-001 DONO Staff Accounting K/1 4,500,000.00 -


2 CN-002 KASINO Staff Finance K/0 4,500,000.00 -
3 CN-003 INDRO Manager F&A K/3 9,000,000.00 500,000.00
4 CN-004 EIKICHI ONIZUKA SPV F&A TK/0 6,000,000.00 -
5 CN-005 DADAN DANIRA Staff HRD K/3 4,000,000.00 -
6 CN-006 HATAKE KAKASHI Staff HRD TK/0 4,000,000.00 -
7 CN-007 NOBI NOBITA Manager HRD K/2 9,000,000.00 500,000.00
8 CN-008 DINAR AMALA Sales TK/0 3,750,000.00 -
9 CN-009 GODA TAKESHI Sales TK/0 3,750,000.00 -
10 CN-010 NILA SADANI SPV Sales K/1 4,000,000.00 -

TOTAL 52,500,000 1,000,000


ID : CN-001 Libur
Tanggal Hari
Nama : DONO Nasional
Jabatan : Staff Accounting 1-Jul-18 Sunday
Status : K/1 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 4,500,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 26,012 = 1,085,983.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 5,585,983.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 279,299.00 10-Jul-18 Tuesday
BPJS - KS : 45,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 90,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 45,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 45,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 504,299.00 17-Jul-18 Tuesday
GAJI NETTO 5,081,684.00 18-Jul-18 Wednesday
PPH 21 - 19-Jul-18 Thursday Ya
THP 5,081,684.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 60,980,208.00 22-Jul-18 Sunday
PTKP : 63,000,000.00 23-Jul-18 Monday
PKP : - 24-Jul-18 Tuesday
PAJAK 1 TAHUN : - 25-Jul-18 Wednesday
PAJAK 1 BULAN : - 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

DONO Jumlah

ID : CN-002 Libur
Tanggal Hari
Nama : KASINO Nasional
Jabatan : Staff Finance 1-Jul-18 Sunday
Status : K/0 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 4,500,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 26,012 = 1,085,983.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 5,585,983.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 279,299.00 10-Jul-18 Tuesday
BPJS - KS : 45,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 90,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 45,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 45,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 504,299.00 17-Jul-18 Tuesday
GAJI NETTO 5,081,684.00 18-Jul-18 Wednesday
PPH 21 10,334.00 19-Jul-18 Thursday Ya
THP 5,071,350.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 60,980,208.00 22-Jul-18 Sunday
PTKP : 58,500,000.00 23-Jul-18 Monday
PKP : 2,480,208.00 24-Jul-18 Tuesday
PAJAK 1 TAHUN : 124,010.40 25-Jul-18 Wednesday
PAJAK 1 BULAN : 10,334.00 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

KASINO Jumlah

ID : CN-003 Libur
Tanggal Hari
Nama : INDRO Nasional
Jabatan : Manager F&A 1-Jul-18 Sunday
Status : K/3 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 9,000,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 52,023 = 2,171,965.00 5-Jul-18 Thursday
Tunjangan : 500,000.00 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 11,671,965.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 500,000.00 10-Jul-18 Tuesday
BPJS - KS : 80,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 180,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 90,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 90,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 940,000.00 17-Jul-18 Tuesday
GAJI NETTO 10,731,965.00 18-Jul-18 Wednesday
PPH 21 293,128.00 19-Jul-18 Thursday Ya
THP 10,438,837.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 128,783,580.00 22-Jul-18 Sunday
PTKP : 72,000,000.00 23-Jul-18 Monday
PKP : 56,783,580.00 24-Jul-18 Tuesday
PAJAK 1 TAHUN : 3,517,537.00 25-Jul-18 Wednesday
PAJAK 1 BULAN : 293,128.00 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

INDRO Jumlah

ID : CN-004 Libur
Tanggal Hari
Nama : EIKICHI ONIZUKA Nasional
Jabatan : SPV F&A 1-Jul-18 Sunday
Status : TK/0 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 6,000,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 34,682 = 1,447,977.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 7,447,977.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 372,399.00 10-Jul-18 Tuesday
BPJS - KS : 60,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 120,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 60,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 60,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 672,399.00 17-Jul-18 Tuesday
GAJI NETTO 6,775,578.00 18-Jul-18 Wednesday
PPH 21 113,779.00 19-Jul-18 Thursday Ya
THP 6,661,799.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 81,306,936.00 22-Jul-18 Sunday
PTKP : 54,000,000.00 23-Jul-18 Monday
PKP : 27,306,936.00 24-Jul-18 Tuesday
PAJAK 1 TAHUN : 1,365,346.80 25-Jul-18 Wednesday
PAJAK 1 BULAN : 113,779.00 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

EIKICHI ONIZUKA Jumlah

ID : CN-005 Libur
Tanggal Hari
Nama : DADAN DANIRA Nasional
Jabatan : Staff HRD 1-Jul-18 Sunday
Status : K/3 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 4,000,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 23,121 = 965,318.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 4,965,318.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 248,266.00 10-Jul-18 Tuesday
BPJS - KS : 40,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 80,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 40,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 40,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 448,266.00 17-Jul-18 Tuesday
GAJI NETTO 4,517,052.00 18-Jul-18 Wednesday
PPH 21 - 19-Jul-18 Thursday Ya
THP 4,517,052.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 54,204,624.00 22-Jul-18 Sunday
PTKP : 72,000,000.00 23-Jul-18 Monday
PKP : - 24-Jul-18 Tuesday
PAJAK 1 TAHUN : - 25-Jul-18 Wednesday
PAJAK 1 BULAN : - 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

DADAN DANIRA Jumlah

ID : CN-006 Libur
Tanggal Hari
Nama : HATAKE KAKASHI Nasional
Jabatan : Staff HRD 1-Jul-18 Sunday
Status : TK/0 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 4,000,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 23,121 = 965,318.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 4,965,318.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 248,266.00 10-Jul-18 Tuesday
BPJS - KS : 40,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 80,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 40,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 40,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 448,266.00 17-Jul-18 Tuesday
GAJI NETTO 4,517,052.00 18-Jul-18 Wednesday
PPH 21 853.00 19-Jul-18 Thursday Ya
THP 4,516,199.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 54,204,624.00 22-Jul-18 Sunday
PTKP : 54,000,000.00 23-Jul-18 Monday
PKP : 204,624.00 24-Jul-18 Tuesday
PAJAK 1 TAHUN : 10,231.20 25-Jul-18 Wednesday
PAJAK 1 BULAN : 853.00 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

HATAKE KAKASHI Jumlah

ID : CN-007 Libur
Tanggal Hari
Nama : NOBI NOBITA Nasional
Jabatan : Manager HRD 1-Jul-18 Sunday
Status : K/2 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 9,000,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 52,023 = 2,171,965.00 5-Jul-18 Thursday
Tunjangan : 500,000.00 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 11,671,965.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 500,000.00 10-Jul-18 Tuesday
BPJS - KS : 80,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 180,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 90,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 90,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 940,000.00 17-Jul-18 Tuesday
GAJI NETTO 10,731,965.00 18-Jul-18 Wednesday
PPH 21 349,378.00 19-Jul-18 Thursday Ya
THP 10,382,587.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 128,783,580.00 22-Jul-18 Sunday
PTKP : 67,500,000.00 23-Jul-18 Monday
PKP : 61,283,580.00 24-Jul-18 Tuesday
PAJAK 1 TAHUN : 4,192,537.00 25-Jul-18 Wednesday
PAJAK 1 BULAN : 349,378.00 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

NOBI NOBITA Jumlah

ID : CN-008 Libur
Tanggal Hari
Nama : DINAR AMALA Nasional
Jabatan : Sales 1-Jul-18 Sunday
Status : TK/0 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 3,750,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 21,676 = 904,986.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 4,654,986.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 232,749.00 10-Jul-18 Tuesday
BPJS - KS : 37,500.00 11-Jul-18 Wednesday
BPJS TK - JHT : 75,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 37,500.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 37,500.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 420,249.00 17-Jul-18 Tuesday
GAJI NETTO 4,234,737.00 18-Jul-18 Wednesday
PPH 21 - 19-Jul-18 Thursday Ya
THP 4,234,737.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 50,816,844.00 22-Jul-18 Sunday
PTKP : 54,000,000.00 23-Jul-18 Monday
PKP : - 24-Jul-18 Tuesday
PAJAK 1 TAHUN : - 25-Jul-18 Wednesday
PAJAK 1 BULAN : - 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

DINAR AMALA Jumlah

ID : CN-009 Libur
Tanggal Hari
Nama : GODA TAKESHI Nasional
Jabatan : Sales 1-Jul-18 Sunday
Status : TK/0 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 3,750,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 21,676 = 904,986.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 4,654,986.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 232,749.00 10-Jul-18 Tuesday
BPJS - KS : 37,500.00 11-Jul-18 Wednesday
BPJS TK - JHT : 75,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 37,500.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 37,500.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 420,249.00 17-Jul-18 Tuesday
GAJI NETTO 4,234,737.00 18-Jul-18 Wednesday
PPH 21 - 19-Jul-18 Thursday Ya
THP 4,234,737.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 50,816,844.00 22-Jul-18 Sunday
PTKP : 54,000,000.00 23-Jul-18 Monday
PKP : - 24-Jul-18 Tuesday
PAJAK 1 TAHUN : - 25-Jul-18 Wednesday
PAJAK 1 BULAN : - 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

GODA TAKESHI Jumlah

ID : CN-010 Libur
Tanggal Hari
Nama : NILA SADANI Nasional
Jabatan : SPV Sales 1-Jul-18 Sunday
Status : K/1 2-Jul-18 Monday Ya
3-Jul-18 Tuesday
Gaji Pokok : 4,000,000.00 4-Jul-18 Wednesday
Lembur : 41.75 x 23,121 = 965,318.00 5-Jul-18 Thursday
Tunjangan : - 6-Jul-18 Friday
7-Jul-18 Saturday
TOTAL GAJI BRUTO 4,965,318.00 8-Jul-18 Sunday
9-Jul-18 Monday
Tun. Jabatan : 248,266.00 10-Jul-18 Tuesday
BPJS - KS : 40,000.00 11-Jul-18 Wednesday
BPJS TK - JHT : 80,000.00 12-Jul-18 Thursday
BPJS TK - JKK : 40,000.00 13-Jul-18 Friday Ya
BPJS TK - JKM : - 14-Jul-18 Saturday
BPJS TK - JPN : 40,000.00 15-Jul-18 Sunday
16-Jul-18 Monday
TOTAL POTONGAN 448,266.00 17-Jul-18 Tuesday
GAJI NETTO 4,517,052.00 18-Jul-18 Wednesday
PPH 21 - 19-Jul-18 Thursday Ya
THP 4,517,052.00 20-Jul-18 Friday
21-Jul-18 Saturday
NETTO : 54,204,624.00 22-Jul-18 Sunday
PTKP : 63,000,000.00 23-Jul-18 Monday
PKP : - 24-Jul-18 Tuesday
PAJAK 1 TAHUN : - 25-Jul-18 Wednesday
PAJAK 1 BULAN : - 26-Jul-18 Thursday
27-Jul-18 Friday
28-Jul-18 Saturday
Diterima Oleh Payroll 29-Jul-18 Sunday
30-Jul-18 Monday
31-Jul-18 Tuesday

NILA SADANI Jumlah


Jam Kerja Total Jam Jam Lembur Total Jam
In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75

Jam Kerja Total Jam Jam Lembur Total Jam


In Out Kerja Lembur 1.5 2 3 4 Lembur
- - - - - - -
8:00 13:00 5.00 4.00 - 4.00 - - 8.00
8:00 19:00 11.00 2.00 1.00 1.00 - - 3.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 22:00 14.00 5.00 1.00 4.00 - - 9.50
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 11:00 3.00 3.00 - 3.00 - - 6.00
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 16:00 8.00 7.00 - 7.00 - - 14.00
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:30 9.50 0.50 0.50 - - - 0.75
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -
- - - - - - -
8:00 17:00 9.00 - - - - - -
8:00 17:00 9.00 - - - - - -

Jumlah 2.50 19.00 - - 41.75


Period: 1 May 2012 - 31 May 2012

1 Name ADE ID UI-001 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 191.0 = IDR 1,374,052 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x - = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 2 11.0 20:00 5:00 8.0 3.0 - 3.0 - - 3.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,816,612 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Absence = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (66,881) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (140,831) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 31,891,332 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 16,051,332 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (66,881) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,724,840 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 25 12 - 20.0 58.0 3.0 9.0 191.0
Period: 1 May 2012 - 31 May 2012

MANDIRI 38 90.0

2 Name ADE ID UI-002 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 117.0 = IDR 841,697 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 4.0 = IDR 16,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 20.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,246,257 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Absence = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (39,789) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (112,313) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 25,389,276 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 9,549,276 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (39,789) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,181,577 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
Period: 1 May 2012 - 31 May 2012

36 TOTAL Shift 1 Shift 2 OT


ADE _______________ 37 28.0 24 4 20 - 14.0 33.0 2.0 6.0 117.0
MANDIRI 38 55.0

3 Name ADE ID UI-003 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 165.0 = IDR 1,187,008 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 1 10.0 8:00 17:00 8.0 2.0 - 2.0 - - 2.0
Adjustment = = IDR - 17 1-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
TOTAL = IDR 2,633,568 19 3-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Absence = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (58,186) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (131,678) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 29,804,628 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 13,964,628 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (58,186) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,550,491 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0


35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 25 13 12 - 20.0 52.5 2.0 6.0 165.0
MANDIRI 38 80.5

4 Name ADE ID UI-004 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 14.0 = IDR 100,716 11 25-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Meal Shift 2 = 4,000 x 4.0 = IDR 16,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 4.0 = IDR - 14 28-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,409,276 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Absence = = IDR (59,265) 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR (32) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. Jab 5% (70,464) 26 10-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Gross Rp 15,847,692 27 11-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PKP 7,692 28 12-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PPH 21 (32) - 29 13-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,325,088 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
34 18-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
35 19-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 12.0 8 4 4 - 4.0 4.0 - - 14.0
MANDIRI 38 8.0

5 Name ADE ID UI-006 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 127.0 = IDR 913,637 11 25-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 9.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,362,197 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Absence = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (45,296) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (118,110) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 26,710,992 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 10,870,992 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (45,296) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -


THP = IDR 2,292,010 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 24 15 9 - 14.0 38.0 2.0 6.0 127.0
MANDIRI 38 60.0

6 Name ADE ID UI-009 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 115.0 = IDR 827,309 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 18.0 = IDR 108,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 3.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,239,869 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Absence = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (39,485) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (111,993) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 25,316,460 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

PKP 9,476,460 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (39,485) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,175,492 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 33.0 18 15 3 - 16.0 38.0 1.0 3.0 115.0
MANDIRI 38 58.0

7 Name ADE ID UI-010 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 163.5 = IDR 1,176,217 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 2 11.0 20:00 5:00 8.0 3.0 - 3.0 - - 3.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,616,777 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (57,388) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

B. Jab 5% (130,839) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 29,613,216 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 13,773,216 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (57,388) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,475,233 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 24 13 11 - 19.0 52.5 2.0 6.0 163.5
MANDIRI 38 79.5

8 Name ADE ID UI-012 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 83.5 = IDR 600,698 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 21.0 = IDR 126,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 5.0 = IDR 20,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 16.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,991,258 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (27,676) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Period: 1 May 2012 - 31 May 2012

PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -


JHT Rp 6,721 25 9-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (99,563) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 22,482,300 27 11-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PKP 6,642,300 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (27,676) - 29 13-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,938,691 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 26.0 21 5 16 - 13.0 24.5 1.0 3.0 83.5
MANDIRI 38 41.5

9 Name ADE ID UI-013 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
8 22-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 45.0 = IDR 323,729 11 25-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
= IDR - 15 29-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
TOTAL = IDR 1,700,289 19 3-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period: 1 May 2012 - 31 May 2012

Deduction = = IDR - 22 6-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Tax = = IDR (13,855) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (85,014) 26 10-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 19,165,248 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 3,325,248 28 12-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PPH 21 (13,855) - 29 13-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,661,543 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 22.0 6.0 - - 45.0
MANDIRI 38 28.0

10 Name ADE ID UI-014 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 213.0 = IDR 1,532,320 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 26.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,932,880 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (72,403) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 L1 6.0 0:00 0:00 0.0 6.0 - 6.0 - - 6.0
JHT Rp 6,721 25 9-Jul-12 1 9.5 8:00 17:00 8.0 1.5 1.0 0.5 - - 1.5
B. Jab 5% (146,644) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 33,216,780 27 11-Jul-12 1 15.0 8:00 17:00 8.0 7.0 1.0 6.0 - - 7.0
PKP 17,376,780 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (72,403) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,835,585 31 15-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 26.0 26 0 26 - 20.0 75.5 4.0 5.0 213.0
MANDIRI 38 104.5

11 Name ADE ID UI-015 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
9 23-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 128.0 = IDR 920,831 11 25-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,309,391 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (42,788) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.5 8:00 17:00 8.0 1.5 1.0 0.5 - - 1.5
B. Jab 5% (115,470) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 26,109,000 27 11-Jul-12 1 15.0 8:00 17:00 8.0 7.0 1.0 6.0 - - 7.0
PKP 10,269,000 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (42,788) - 29 13-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,241,712 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 22.0 44.5 2.0 - 128.0
MANDIRI 38 68.5

12 Name ADE ID UI-016 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 201.0 = IDR 1,445,992 11 25-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -


Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,892,552 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (70,488) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (144,628) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 32,757,048 27 11-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 16,917,048 28 12-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (70,488) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,797,173 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 25 13 12 - 18.0 57.0 4.0 12.0 201.0
MANDIRI 38 91.0

13 Name ADE ID UI-017 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 148.5 = IDR 1,068,307 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -


= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,512,867 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (52,453) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (125,643) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 28,428,636 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 12,588,636 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (52,453) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,435,523 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 24 14 10 - 17.0 46.5 2.0 6.0 148.5
MANDIRI 38 71.5

14 Name ADE ID UI-018 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 216.5 = IDR 1,557,498 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,012,058 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (76,164) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (150,603) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 34,119,420 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 18,279,420 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (76,164) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,911,003 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 25 15 10 - 21.0 68.5 4.0 9.0 216.5
MANDIRI 38 102.5

15 Name ADE ID UI-019 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 175.5 = IDR 1,262,545 11 25-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Transport = 6,000 x 27.0 = IDR 162,000 12 26-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,725,105 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (62,534) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (136,255) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 30,848,148 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 15,008,148 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (62,534) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,637,680 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 41.0 27 14 13 - 13.0 52.5 5.0 9.0 175.5
MANDIRI 38 79.5

16 Name ADE ID UI-020 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -


9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 101.5 = IDR 730,190 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,164,750 19 3-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (35,917) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (108,237) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 24,460,104 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 8,620,104 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (35,917) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,103,942 31 15-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
32 16-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 36.0 23 13 10 - 13.0 32.0 2.0 3.0 101.5
MANDIRI 38 50.0

17 Name ADE ID UI-021 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 247.5 = IDR 1,780,512 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,227,072 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (86,377) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (161,354) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 36,570,576 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 20,730,576 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (86,377) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 3,115,804 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 25 13 12 - 19.0 72.0 5.0 15.0 247.5
MANDIRI 38 111.0

18 Name ADE ID UI-022 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Period: 1 May 2012 - 31 May 2012

Date Shift TTL OT Total OT


Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 177.0 = IDR 1,273,336 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,723,896 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (62,477) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (136,195) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 30,834,372 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 14,994,372 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (62,477) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,636,528 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 25 14 11 - 20.0 57.0 3.0 6.0 177.0
MANDIRI 38 86.0

19 Name ADE ID UI-023 1 ADE


Period: 1 May 2012 - 31 May 2012

Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 155.5 = IDR 1,118,665 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,579,225 19 3-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (55,605) 23 7-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (128,961) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 29,185,116 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 13,345,116 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (55,605) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,498,729 31 15-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
32 16-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 41.0 26 15 11 - 21.0 50.0 4.0 3.0 155.5
MANDIRI 38 78.0
Period: 1 May 2012 - 31 May 2012

20 Name ADE ID UI-024 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 212.0 = IDR 1,525,126 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,985,686 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (74,912) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (149,284) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 33,818,772 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 17,978,772 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (74,912) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,885,883 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
Period: 1 May 2012 - 31 May 2012

ADE _______________ 37 41.0 26 15 11 - 20.0 67.0 4.0 9.0 212.0


MANDIRI 38 100.0

21 Name ADE ID UI-025 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 181.5 = IDR 1,305,709 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 1 11.0 8:00 17:00 8.0 3.0 - 3.0 - - 3.0
Adjustment = = IDR - 17 1-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,766,269 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (64,489) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (138,313) 26 10-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 31,317,420 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 15,477,420 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (64,489) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,676,888 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 41.0 26 15 11 - 17.0 55.5 3.0 9.0 181.5
MANDIRI 38 84.5

22 Name ADE ID UI-026 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 108.5 = IDR 780,548 11 25-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 11.0 = IDR 44,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,207,108 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (37,929) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (110,355) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 24,942,984 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 9,102,984 28 12-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (37,929) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,144,287 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 34.0 23 11 12 - 17.0 34.0 1.0 3.0 108.5
MANDIRI 38 55.0

23 Name ADE ID UI-028 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
8 22-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 213.5 = IDR 1,535,917 11 25-Jun-12 M 0:00 0:00 0.0 - - - - - -
Transport = 6,000 x 27.0 = IDR 162,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 10.0 = IDR 40,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 17.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,982,477 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (74,759) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (149,124) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 33,782,184 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 17,942,184 28 12-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (74,759) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Period: 1 May 2012 - 31 May 2012

THP = IDR 2,882,826 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -


32 16-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 27 10 17 - 19.0 67.0 5.0 9.0 213.5
MANDIRI 38 100.0

24 Name ADE ID UI-029 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
9 23-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 172.0 = IDR 1,237,366 11 25-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Transport = 6,000 x 27.0 = IDR 162,000 12 26-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 16 30-Jun-12 2 11.0 20:00 5:00 8.0 3.0 - 3.0 - - 3.0
Adjustment = = IDR - 17 1-Jul-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,695,926 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (61,148) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
JHT Rp 6,721 25 9-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
B. Jab 5% (134,796) 26 10-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 30,515,508 27 11-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 14,675,508 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

PPH 21 (61,148) - 29 13-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
THP = IDR 2,609,887 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 27 13 14 - 18.0 61.0 5.0 2.0 172.0
MANDIRI 38 86.0

25 Name ADE ID UI-030 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 123.0 = IDR 884,861 11 25-Jun-12 M 0:00 0:00 0.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,273,421 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (41,079) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (113,671) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

Gross Rp 25,698,948 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 9,858,948 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (41,079) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,207,450 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.5 8:00 17:00 8.0 1.5 1.0 0.5 - - 1.5
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 16.0 40.5 2.0 3.0 123.0
MANDIRI 38 61.5

26 Name ADE ID UI-031 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 186.0 = IDR 1,338,082 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,788,642 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (65,552) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (139,432) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 31,572,468 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 15,732,468 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (65,552) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,698,199 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 25 14 11 - 20.0 57.5 3.0 8.0 186.0
MANDIRI 38 88.5

27 Name ADE ID UI-032 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 220.0 = IDR 1,582,677 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,039,237 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Tax = = IDR (77,455) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (151,962) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 34,429,260 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 18,589,260 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (77,455) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 2 11.0 20:00 5:00 8.0 3.0 - 3.0 - - 3.0
THP = IDR 2,936,891 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35 #N/A #N/A #N/A
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 26 14 12 - 20.0 65.0 4.0 12.0 220.0
MANDIRI 38 101.0

28 Name ADE ID UI-033 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 147.5 = IDR 1,061,113 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,505,673 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Tax = = IDR (52,111) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (125,284) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 28,346,628 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 12,506,628 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (52,111) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,428,671 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 24 14 10 - 15.0 46.0 3.0 6.0 147.5
MANDIRI 38 70.0

29 Name ADE ID UI-034 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 5.0 0:00 0:00 0.0 5.0 - 5.0 - - 5.0
Overtime = 7,194 x 161.0 = IDR 1,158,232 11 25-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 11.0 = IDR 44,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 15.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 1 11.0 8:00 17:00 8.0 3.0 - 3.0 - - 3.0
Adjustment = = IDR - 17 1-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

TOTAL = IDR 2,602,792 19 3-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (56,724) 23 7-Jul-12 L2 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.5 8:00 17:00 8.0 1.5 1.0 0.5 - - 1.5
B. Jab 5% (130,140) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 29,453,784 27 11-Jul-12 1 15.0 8:00 17:00 8.0 7.0 1.0 6.0 - - 7.0
PKP 13,613,784 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (56,724) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,521,177 31 15-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 26 11 15 - 18.0 60.5 3.0 1.0 161.0
MANDIRI 38 82.5

30 Name ADE ID UI-035 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 175.0 = IDR 1,258,948 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -


= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,701,508 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (61,413) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (135,075) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 30,579,144 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 14,739,144 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PPH 21 (61,413) - 29 13-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,615,204 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 25 12 13 - 16.0 53.0 3.0 9.0 175.0
MANDIRI 38 81.0

31 Name ADE ID UI-036 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 222.0 = IDR 1,597,065 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,053,625 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (78,139) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (152,681) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 34,593,288 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 18,753,288 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (78,139) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,950,596 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 26 14 12 - 22.0 70.5 4.0 9.0 222.0
132-00-1175356-4 MANDIRI 38 105.5

32 Name ADE ID UI-037 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 241.5 = IDR 1,737,348 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,193,908 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (84,802) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (159,695) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 36,192,504 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 20,352,504 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (84,802) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 3,084,215 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 26 14 12 - 19.0 69.0 5.0 15.0 241.5
MANDIRI 38 108.0

33 Name ADE ID UI-038 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Overtime = 7,194 x 149.5 = IDR 1,075,501 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Puasa = x 9.0 = IDR - 14 28-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,524,061 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (52,984) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (126,203) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 28,556,256 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 12,716,256 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (52,984) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,446,186 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 24 15 9 - 17.0 47.0 2.0 6.0 149.5
MANDIRI 38 72.0

34 Name ADE ID UI-040 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -


Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 215.5 = IDR 1,550,305 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,000,865 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (75,633) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (150,043) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 33,991,812 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 18,151,812 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (75,633) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,900,341 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 25 14 11 - 21.0 68.0 4.0 9.0 215.5
MANDIRI 38 102.0

35 Name ADE ID UI-041 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -


8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 120.5 = IDR 866,876 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 5.0 = IDR 20,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 19.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,275,436 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (41,175) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
B. Jab 5% (113,772) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 25,721,916 27 11-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PKP 9,881,916 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PPH 21 (41,175) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,209,370 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 29.0 24 5 19 - 15.0 40.0 2.0 3.0 120.5
MANDIRI 38 60.0

36 Name ADE ID UI-042 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Period: 1 May 2012 - 31 May 2012

Cost Center 5 19-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 105.0 = IDR 755,369 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
= IDR - 18 2-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
TOTAL = IDR 2,209,929 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (38,063) 23 7-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (110,496) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 24,975,144 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 9,135,144 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (38,063) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,146,974 31 15-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
32 16-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 25 15 10 - 8.0 30.0 3.0 6.0 105.0
MANDIRI 38 47.0

37 Name ADE ID UI-043 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Period: 1 May 2012 - 31 May 2012

Status TK 3 WH Over Time


Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 178.0 = IDR 1,280,530 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 15.0 = IDR 60,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,723,090 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (62,438) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (136,154) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 30,825,180 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 14,985,180 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (62,438) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,635,760 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 23 15 8 - 18.0 53.0 3.0 9.0 178.0
MANDIRI 38 83.0
Period: 1 May 2012 - 31 May 2012

38 Name ADE ID UI-044 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 108.5 = IDR 780,548 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,221,108 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (38,594) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (111,055) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 25,102,584 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 9,262,584 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (38,594) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,157,622 31 15-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 24 13 11 - 15.0 40.0 2.0 - 108.5
Period: 1 May 2012 - 31 May 2012

MANDIRI 38 57.0

39 Name ADE ID UI-045 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 59.5 = IDR 428,042 11 25-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Transport = 6,000 x 10.0 = IDR 60,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 6.0 = IDR 24,000 13 27-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 4.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,756,602 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR (16,530) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. Jab 5% (87,830) 26 10-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Gross Rp 19,807,224 27 11-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PKP 3,967,224 28 12-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PPH 21 (16,530) - 29 13-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,715,181 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
34 18-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
35 19-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

36 TOTAL Shift 1 Shift 2 OT


ADE _______________ 37 16.0 10 6 4 - 7.0 17.0 1.0 3.0 59.5
MANDIRI 38 28.0

40 Name ADE ID UI-046 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 71.5 = IDR 514,370 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
TOTAL = IDR 1,944,930 19 3-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Tax = = IDR (25,476) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (97,247) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 21,954,156 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 6,114,156 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (25,476) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,894,563 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -


35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 23 12 11 - 5.0 17.0 2.0 6.0 71.5
MANDIRI 38 30.0

41 Name ADE ID UI-047 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 219.5 = IDR 1,579,080 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x 7.0 = IDR 28,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 18.0 = IDR - 14 28-Jun-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 3,001,640 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (75,669) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (150,082) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 34,000,656 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 18,160,656 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (75,669) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,901,080 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0


Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 32.0 25 7 18 - 21.0 64.0 4.0 12.0 219.5
MANDIRI 38 101.0

42 Name ADE ID UI-048 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 139.5 = IDR 1,003,561 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,392,121 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (46,717) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (119,606) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 27,052,140 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,212,140 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (46,717) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -


THP = IDR 2,320,513 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 17.0 42.0 2.0 6.0 139.5
MANDIRI 38 67.0

43 Name ADE ID UI-049 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 187.0 = IDR 1,345,276 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
Adjustment = = IDR - 17 1-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,795,836 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (65,894) 23 7-Jul-12 L2 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (139,792) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 31,654,476 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

PKP 15,814,476 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (65,894) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,705,051 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 25 14 11 - 22.0 60.5 3.0 6.0 187.0
MANDIRI 38 91.5

44 Name ADE ID UI-050 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Overtime = 7,194 x 224.5 = IDR 1,615,050 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.5 8:00 17:00 8.0 3.5 1.0 2.5 - - 3.5
TOTAL = IDR 3,071,610 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (78,993) 23 7-Jul-12 M 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 L2 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

B. Jab 5% (153,581) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 34,798,308 27 11-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 18,958,308 28 12-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (78,993) - 29 13-Jul-12 2 11.5 20:00 5:00 8.0 3.5 1.0 2.5 - - 3.5
30 14-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
THP = IDR 2,967,726 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 26 14 12 - 21.0 77.0 5.0 6.0 224.5
132-00-1191115-4 MANDIRI 38 109.0

45 Name ADE ID UI-051 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 146.5 = IDR 1,053,919 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 15.0 = IDR 90,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 7.0 = IDR 28,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,416,479 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (47,874) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Period: 1 May 2012 - 31 May 2012

PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (120,824) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 27,329,820 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,489,820 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (47,874) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,343,714 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 15 7 8 - 11.0 42.5 3.0 9.0 146.5
MANDIRI 38 65.5

46 Name ADE ID UI-052 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 140.0 = IDR 1,007,158 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 7.0 = IDR 28,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 15.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 2,411,718 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Deduction = = IDR (59,265) 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (47,648) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (120,586) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 27,275,544 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,435,544 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (47,648) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,279,914 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 29.0 22 7 15 - 12.0 38.5 3.0 9.0 140.0
MANDIRI 38 62.5

47 Name ADE ID UI-053 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 99.0 = IDR 712,205 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,094,765 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0


JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (32,593) 23 7-Jul-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (104,738) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 23,662,272 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 7,822,272 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (32,593) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,037,281 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 16.0 32.0 1.0 2.0 99.0
MANDIRI 38 51.0

48 Name ADE ID UI-054 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 7.0 0:00 0:00 0.0 7.0 - 7.0 - - 7.0
Overtime = 7,194 x 191.5 = IDR 1,377,649 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 1 10.0 8:00 17:00 8.0 2.0 - 2.0 - - 2.0
Adjustment = = IDR - 17 1-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Period: 1 May 2012 - 31 May 2012

= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 2,830,209 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (67,526) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 L1 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (141,510) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 32,046,336 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 16,206,336 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (67,526) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,678,526 31 15-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 26 13 13 - 21.0 69.5 3.0 3.0 191.5
MANDIRI 38 96.5

49 Name ADE ID UI-055 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 197.0 = IDR 1,417,216 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

= IDR - 16 30-Jun-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
Adjustment = = IDR - 17 1-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,867,776 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction = = IDR (59,265) 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (69,311) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (143,389) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 32,474,592 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 16,634,592 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (69,311) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,714,309 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 25 14 11 - 16.0 58.5 4.0 11.0 197.0
MANDIRI 38 89.5

50 Name ADE ID UI-056 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 214.0 = IDR 1,539,514 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,982,074 19 3-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (74,740) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (149,104) 26 10-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Gross Rp 33,777,588 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 17,937,588 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (74,740) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,823,178 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 25 12 13 - 20.0 62.0 4.0 12.0 214.0
MANDIRI 38 98.0

51 Name ADE ID UI-057 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 L1 5.5 0:00 0:00 0.0 5.5 - 5.5 - - 5.5
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 25.0 = IDR 179,850 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,562,410 19 3-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Deduction = = IDR - 22 6-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Tax = = IDR (7,306) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (78,120) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 17,593,428 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 1,753,428 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (7,306) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,530,213 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35 19-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 8.0 6.5 - - 25.0
MANDIRI 38 14.5

52 Name ADE ID UI-058 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -


Overtime = 7,194 x 89.5 = IDR 643,862 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,088,422 19 3-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (32,292) 23 7-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (104,421) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 23,589,960 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 7,749,960 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (32,292) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,031,239 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 24 14 10 - 9.0 27.0 2.0 4.0 89.5
MANDIRI 38 42.0

53 Name ADE ID UI-059 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -


9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 67.0 = IDR 481,997 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,858,557 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (21,373) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (92,928) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 20,969,508 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 5,129,508 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (21,373) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,753,028 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 12.0 23.0 1.0 - 67.0
MANDIRI 38 36.0

54 Name ADE ID UI-060 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0


Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 188.5 = IDR 1,356,067 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,808,627 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (66,501) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
B. Jab 5% (140,431) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 31,800,300 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 15,960,300 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (66,501) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,717,234 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 26 13 13 - 15.0 53.0 4.0 12.0 188.5
MANDIRI 38 84.0

55 Name ADE ID UI-061 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Period: 1 May 2012 - 31 May 2012

Date Shift TTL OT Total OT


Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 93.5 = IDR 672,638 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,103,198 19 3-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (32,993) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (105,160) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 23,758,404 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 7,918,404 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (32,993) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,045,313 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 23 12 11 - 15.0 34.0 1.0 - 93.5
MANDIRI 38 50.0

56 Name ADE ID UI-062 1 ADE


Period: 1 May 2012 - 31 May 2012

Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Overtime = 7,194 x 204.0 = IDR 1,467,574 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 10.0 = IDR 40,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 15.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,902,134 19 3-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (70,943) 23 7-Jul-12 M 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (145,107) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 32,866,272 27 11-Jul-12 1 15.0 8:00 17:00 8.0 7.0 1.0 6.0 - - 7.0
PKP 17,026,272 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (70,943) - 29 13-Jul-12 1 13.0 8:00 17:00 8.0 5.0 1.0 4.0 - - 5.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,806,300 31 15-Jul-12 L2 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 25 10 15 - 18.0 71.0 5.0 5.0 204.0
MANDIRI 38 99.0
Period: 1 May 2012 - 31 May 2012

57 Name ADE ID UI-063 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 185.5 = IDR 1,334,485 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,711,045 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (61,866) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 5.0 0:00 0:00 0.0 5.0 - 5.0 - - 5.0
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (135,552) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 30,687,864 27 11-Jul-12 1 15.0 8:00 17:00 8.0 7.0 1.0 6.0 - - 7.0
PKP 14,847,864 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (61,866) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,624,288 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
User:
34 18-Jul-12 #N/A
kosong
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
35
36 TOTAL Shift 1 Shift 2 OT
User:
Period: 1 May 2012 - 31 May 2012 kosong

ADE _______________ 37 22.0 22 0 22 - 19.0 64.0 3.0 5.0 185.5


MANDIRI 38 91.0

58 Name ADE ID UI-064 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 138.5 = IDR 996,367 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 5.0 = IDR 20,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 19.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,404,927 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (47,326) 23 7-Jul-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (120,246) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 27,198,120 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,358,120 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (47,326) - 29 13-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,332,711 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

35 19-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 29.0 24 5 19 - 19.0 42.0 2.0 5.0 138.5
MANDIRI 38 68.0

59 Name ADE ID UI-065 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 251.0 = IDR 1,805,691 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 27.0 = IDR 162,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 8.0 = IDR 32,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 19.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 11.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 3,244,251 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (87,193) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (162,213) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 36,766,416 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 20,926,416 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (87,193) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 3,132,166 31 15-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -


34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 27 8 19 - 18.0 79.5 7.0 11.0 251.0
MANDIRI 38 115.5

60 Name ADE ID UI-066 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Overtime = 7,194 x 157.5 = IDR 1,133,053 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 21.0 = IDR 126,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 10.0 = IDR 40,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 2 11.0 20:00 5:00 8.0 3.0 - 3.0 - - 3.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,543,613 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (237,059) 22 6-Jul-12 1 8:00 17:00 8.0 (8.0) - - - - (8.0)
Tax = = IDR (53,913) 23 7-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. Jab 5% (127,181) 26 10-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Gross Rp 28,779,144 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 12,939,144 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (53,913) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Period: 1 May 2012 - 31 May 2012

THP = IDR 2,227,750 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -


32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 31.0 21 10 11 - 15.0 53.0 3.0 5.0 157.5
MANDIRI 38 76.0

61 Name ADE ID UI-067 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 131.5 = IDR 946,009 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,334,569 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (43,984) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (116,728) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 26,396,040 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 10,556,040 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

PPH 21 (43,984) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,265,695 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 17.0 46.0 2.0 2.0 131.5
MANDIRI 38 67.0

62 Name ADE ID UI-068 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 121.0 = IDR 870,473 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
TOTAL = IDR 2,253,033 19 3-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (40,111) 23 7-Jul-12 L1 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (112,652) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

Gross Rp 25,466,520 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 9,626,520 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (40,111) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,188,031 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 16.0 41.5 2.0 2.0 121.0
MANDIRI 38 61.5

63 Name ADE ID UI-069 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 145.5 = IDR 1,046,725 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,435,285 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 8:00 17:00 8.0 (8.0) - - - - (8.0)
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (48,768) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (121,764) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 27,544,200 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,704,200 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (48,768) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,302,362 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 17.0 45.0 2.0 6.0 145.5
MANDIRI 38 70.0

64 Name ADE ID UI-070 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 140.0 = IDR 1,007,158 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
TOTAL = IDR 2,389,718 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

Tax = = IDR (46,603) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (119,486) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 27,024,744 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,184,744 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (46,603) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,318,224 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 20.0 46.0 2.0 3.0 140.0
MANDIRI 38 71.0

65 Name ADE ID UI-071 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 8.0 0:00 0:00 0.0 8.0 1.0 7.0 - - 8.0
Dept 6 20-Jun-12 9.0 0:00 #N/A #N/A 9.0 1.0 7.0 1.0 - 9.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 8.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 216.0 = IDR 1,553,902 11 25-Jun-12 8.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 13.0 = IDR 78,000 12 26-Jun-12 8.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 11.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 11.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 11.0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 6.0 0:00 0:00 0.0 6.0 - 6.0 - - 6.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,876,462 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (69,723) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (143,823) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 32,573,616 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 16,733,616 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (69,723) - 29 13-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,781,847 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 13.0 13 0 13 - 20.0 75.0 4.0 6.0 216.0
MANDIRI 38 105.0

66 Name ADE ID UI-072 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 25.0 = IDR 179,850 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

TOTAL = IDR 1,556,410 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (7,021) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (77,820) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 17,525,028 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 1,685,028 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (7,021) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,524,498 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 10.0 5.0 - - 25.0
MANDIRI 38 15.0

67 Name ADE ID UI-073 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 210.0 = IDR 1,510,738 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Period: 1 May 2012 - 31 May 2012

Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -


= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,967,298 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (74,038) 23 7-Jul-12 L2 10.0 0:00 0:00 0.0 10.0 - 7.0 1.0 2.0 10.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (148,365) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 33,609,144 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 17,769,144 28 12-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (74,038) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,868,368 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 40.0 26 14 12 - 18.0 63.5 4.0 11.0 210.0
MANDIRI 38 96.5

68 Name ADE ID UI-076 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 113.5 = IDR 816,518 11 25-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 10.0 = IDR 40,000 13 27-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Period: 1 May 2012 - 31 May 2012

= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -


= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,233,078 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (39,163) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (111,654) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 25,239,036 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 9,399,036 28 12-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (39,163) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
THP = IDR 2,169,024 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 32.0 22 10 12 - 19.0 41.0 1.0 - 113.5
MANDIRI 38 61.0

69 Name ADE ID UI-077 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 39.5 = IDR 284,163 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 20.0 = IDR 120,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
TOTAL = IDR 1,696,723 19 3-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR (118,530) 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (13,686) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. Jab 5% (84,836) 26 10-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Gross Rp 19,124,592 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 3,284,592 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (13,686) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,539,616 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 32.0 20 12 8 - 9.0 13.0 - - 39.5
MANDIRI 38 22.0

70 Name ADE ID UI-078 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Overtime = 7,194 x 83.0 = IDR 597,101 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 8.0 = IDR 32,000 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,005,661 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (28,360) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (100,283) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 22,646,484 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 6,806,484 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (28,360) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,952,409 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 30.0 22 8 14 - 18.0 28.0 - - 83.0
MANDIRI 38 46.0

71 Name ADE ID UI-079 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -


Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 128.5 = IDR 924,428 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,312,988 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (42,958) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (115,649) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 26,150,016 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 10,310,016 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (42,958) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,245,138 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 19.0 47.0 2.0 - 128.5
MANDIRI 38 68.0

72 Name ADE ID UI-080 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period: 1 May 2012 - 31 May 2012

Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -


8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 59.5 = IDR 428,042 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 1,810,602 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (19,095) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (90,530) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 20,422,824 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 4,582,824 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (19,095) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,766,616 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 11.0 20.0 1.0 - 59.5
MANDIRI 38 32.0

73 Name ADE ID UI-081 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Period: 1 May 2012 - 31 May 2012

Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 118.5 = IDR 852,488 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,235,048 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (39,256) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (111,752) 26 10-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
Gross Rp 25,261,500 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 9,421,500 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (39,256) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,170,900 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 19.0 43.5 1.0 - 118.5
MANDIRI 38 63.5

74 Name ADE ID UI-082 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Period: 1 May 2012 - 31 May 2012

Status TK 3 WH Over Time


Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 129.0 = IDR 928,025 11 25-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 25.0 = IDR - 14 28-Jun-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 12.0 0:00 0:00 0.0 12.0 - 7.0 1.0 4.0 12.0
Adjustment = = IDR - 17 1-Jul-12 L1 4.5 0:00 0:00 0.0 4.5 - 4.5 - - 4.5
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,322,585 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (43,414) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (116,129) 26 10-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 26,259,420 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 10,419,420 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (43,414) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,254,279 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 25.0 25 0 25 - 18.0 40.0 2.0 4.0 129.0
MANDIRI 38 64.0
Period: 1 May 2012 - 31 May 2012

75 Name ADE ID UI-083 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Overtime = 7,194 x 151.5 = IDR 1,089,889 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 27.0 = IDR 162,000 12 26-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 27.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,496,449 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
Deduction = = IDR - 22 6-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
Tax = = IDR (51,673) 23 7-Jul-12 L1 8.5 0:00 0:00 0.0 8.5 - 7.0 1.0 0.5 8.5
PTKP (1,320,000) 24 8-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
JHT Rp 6,721 25 9-Jul-12 1 9.5 8:00 17:00 8.0 1.5 1.0 0.5 - - 1.5
B. Jab 5% (124,822) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 28,241,472 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 12,401,472 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (51,673) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,419,885 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
34 18-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 27.0 27 0 27 - 15.0 56.0 5.0 0.5 151.5
Period: 1 May 2012 - 31 May 2012

MANDIRI 38 76.5

76 Name ADE ID UI-084 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 125.5 = IDR 902,846 11 25-Jun-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 12.5 0:00 0:00 0.0 12.5 - 7.0 1.0 4.5 12.5
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
TOTAL = IDR 2,291,406 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (41,933) 23 7-Jul-12 L1 9.0 0:00 0:00 0.0 9.0 - 7.0 1.0 1.0 9.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (114,570) 26 10-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 25,903,980 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 10,063,980 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (41,933) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,224,581 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
Diterima oleh, Payroll, 33 17-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
34 18-Jul-12 1 10.5 8:00 17:00 8.0 2.5 1.0 1.5 - - 2.5
35
Period: 1 May 2012 - 31 May 2012

36 TOTAL Shift 1 Shift 2 OT


ADE _______________ 37 24.0 24 0 24 - 17.0 36.0 2.0 5.5 125.5
MANDIRI 38 60.5

77 Name ADE ID UI-085 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 116.5 = IDR 838,100 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,278,660 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (41,328) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (113,933) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 25,758,672 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 9,918,672 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (41,328) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,212,441 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0


35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 24 13 11 - 15.0 38.0 2.0 3.0 116.5
MANDIRI 38 58.0

78 Name ADE ID UI-086 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Overtime = 7,194 x 55.0 = IDR 395,669 11 25-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 11.0 = IDR 44,000 13 27-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 1,828,229 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (19,932) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
B. Jab 5% (91,411) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 20,623,764 27 11-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PKP 4,783,764 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PPH 21 (19,932) - 29 13-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,783,406 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 24 11 13 - 6.0 20.0 2.0 - 55.0
MANDIRI 38 28.0

79 Name ADE ID UI-087 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 135.0 = IDR 971,188 11 25-Jun-12 2 8.0 20:00 5:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,407,748 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR (59,265) 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (47,460) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 9.0 20:00 5:00 8.0 1.0 1.0 0.0 - - 1.0
B. Jab 5% (120,387) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 27,230,280 27 11-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PKP 11,390,280 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PPH 21 (47,460) - 29 13-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,276,133 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 36.0 24 12 12 - 12.0 42.0 3.0 6.0 135.0
MANDIRI 38 63.0

80 Name ADE ID UI-088 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 120.0 = IDR 863,279 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,287,839 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (41,764) 23 7-Jul-12 M 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (114,392) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 25,863,312 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period: 1 May 2012 - 31 May 2012

PKP 10,023,312 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


PPH 21 (41,764) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,221,184 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 34.0 22 12 10 - 18.0 39.0 1.0 3.0 120.0
MANDIRI 38 61.0

81 Name ADE ID UI-089 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 147.5 = IDR 1,061,113 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,505,673 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (52,111) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

B. Jab 5% (125,284) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


Gross Rp 28,346,628 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 12,506,628 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (52,111) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,428,671 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 24 14 10 - 17.0 46.0 2.0 6.0 147.5
MANDIRI 38 71.0

82 Name ADE ID UI-090 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 136.5 = IDR 981,979 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,358,539 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (45,122) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Period: 1 May 2012 - 31 May 2012

PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -


JHT Rp 6,721 25 9-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. Jab 5% (117,927) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 26,669,304 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 10,829,304 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (45,122) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,229,261 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 19.0 51.0 2.0 - 136.5
MANDIRI 38 72.0

83 Name ADE ID UI-091 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 12.0 8:00 17:00 8.0 4.0 1.0 3.0 - - 4.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 125.5 = IDR 902,846 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,291,406 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (41,933) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (114,570) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 25,903,980 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 10,063,980 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (41,933) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,224,581 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 17.0 47.0 2.0 - 125.5
MANDIRI 38 66.0

84 Name ADE ID UI-092 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
8 22-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 162.0 = IDR 1,165,426 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 14.0 = IDR 56,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,615,986 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (57,351) 23 7-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (130,799) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 29,604,192 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 13,764,192 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (57,351) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,533,744 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 25 14 11 - 20.0 55.5 3.0 3.0 162.0
MANDIRI 38 81.5

85 Name ADE ID UI-093 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 146.5 = IDR 1,053,919 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,442,479 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (49,109) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (122,124) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 27,626,220 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 11,786,220 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (49,109) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,368,479 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 19.0 50.0 2.0 3.0 146.5
MANDIRI 38 74.0

86 Name ADE ID UI-094 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 112.5 = IDR 809,324 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,191,884 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (37,206) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (109,594) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 24,769,428 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 8,929,428 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (37,206) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,129,787 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 15.0 42.0 2.0 - 112.5
MANDIRI 38 59.0

87 Name ADE ID UI-095 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 127.0 = IDR 913,637 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -


= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,302,197 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (42,446) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (115,110) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 26,026,992 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 10,186,992 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (42,446) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,234,860 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 24 0 24 - 18.0 47.0 2.0 - 127.0
MANDIRI 38 67.0

88 Name ADE ID UI-096 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 87.0 = IDR 625,877 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 6.5 0:00 0:00 0.0 6.5 - 6.5 - - 6.5
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 2,008,437 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (28,492) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (100,422) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 22,678,140 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 6,838,140 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (28,492) - 29 13-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,955,054 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 14.0 31.5 1.0 - 87.0
MANDIRI 38 46.5

89 Name ADE ID UI-097 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Overtime = 7,194 x 229.5 = IDR 1,651,020 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 12.0 = IDR 48,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,099,580 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (80,322) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (154,979) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 35,117,172 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 19,277,172 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (80,322) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,994,368 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 38.0 26 12 14 - 21.0 69.0 4.0 12.0 229.5
MANDIRI 38 106.0

90 Name ADE ID UI-098 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
Period: 1 May 2012 - 31 May 2012

8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0


9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 159.0 = IDR 1,143,844 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 11.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,584,404 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (55,851) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (129,220) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 29,244,156 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 13,404,156 28 12-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PPH 21 (55,851) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,503,662 31 15-Jul-12 L2 6.0 0:00 0:00 0.0 6.0 - 6.0 - - 6.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 37.0 24 13 11 - 22.0 55.5 1.0 3.0 159.0
MANDIRI 38 81.5

91 Name ADE ID UI-100 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 227.5 = IDR 1,636,632 11 25-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 26.0 = IDR 156,000 12 26-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 13.0 = IDR 52,000 13 27-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 3,089,192 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (79,828) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (154,460) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 34,998,744 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 19,158,744 28 12-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (79,828) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,984,473 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 39.0 26 13 13 - 21.0 68.0 4.0 12.0 227.5
MANDIRI 38 105.0

92 Name ADE ID UI-101 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Period: 1 May 2012 - 31 May 2012

Date Shift TTL OT Total OT


Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 81.0 = IDR 582,713 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 15.0 = IDR 90,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 6.0 = IDR 24,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 9.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,941,273 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR (118,530) 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (25,302) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (97,064) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 21,912,468 27 11-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 6,072,468 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (25,302) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,772,550 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 21.0 15 6 9 - 10.0 25.5 1.0 3.0 81.0
MANDIRI 38 39.5

93 Name ADE ID UI-102 1 ADE


Period: 1 May 2012 - 31 May 2012

Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
8 22-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 162.5 = IDR 1,169,023 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 25.0 = IDR 150,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x 10.0 = IDR 40,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 15.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,603,583 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (56,762) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (130,179) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 29,462,796 27 11-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PKP 13,622,796 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PPH 21 (56,762) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,521,930 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 25 10 15 - 17.0 52.0 3.0 6.0 162.5
MANDIRI 38 78.0
Period: 1 May 2012 - 31 May 2012

94 Name ADE ID UI-103 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 129.0 = IDR 928,025 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 24.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,316,585 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (43,129) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (115,829) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 26,191,020 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 10,351,020 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (43,129) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,248,564 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
Period: 1 May 2012 - 31 May 2012

ADE _______________ 37 24.0 24 0 24 - 18.0 48.0 2.0 - 129.0


MANDIRI 38 68.0

95 Name ADE ID UI-104 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 106.5 = IDR 766,160 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,142,720 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (34,871) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (107,136) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 24,208,956 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 8,368,956 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (34,871) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,082,958 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period: 1 May 2012 - 31 May 2012

35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 15.0 39.0 2.0 - 106.5
MANDIRI 38 56.0

96 Name ADE ID UI-105 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 33.0 = IDR 237,402 11 25-Jun-12 1 7.5 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 23.0 = IDR 138,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 23.0 = IDR - 14 28-Jun-12 1 7.5 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,619,962 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (10,040) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (80,998) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 18,249,516 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 2,409,516 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (10,040) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,585,031 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 23.0 23 0 23 - 8.0 9.0 1.0 - 33.0
MANDIRI 38 18.0

97 Name ADE ID UI-106 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 73.5 = IDR 528,758 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L1 6.5 0:00 0:00 0.0 6.5 - 6.5 - - 6.5
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 1,905,318 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (59,265) 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (23,594) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B. Jab 5% (95,266) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 21,502,584 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 5,662,584 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (23,594) - 29 13-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

THP = IDR 1,797,568 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -


32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 15.0 25.5 - - 73.5
MANDIRI 38 40.5

98 Name ADE ID UI-107 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 97.5 = IDR 701,414 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 21.0 = IDR 126,000 12 26-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Meal Shift 2 = 4,000 x 3.0 = IDR 12,000 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 18.0 = IDR - 14 28-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,083,974 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (118,530) 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (32,080) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (104,199) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 23,539,260 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 7,699,260 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

PPH 21 (32,080) - 29 13-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,908,473 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 24.0 21 3 18 - 9.0 27.0 2.0 6.0 97.5
MANDIRI 38 44.0

99 Name ADE ID UI-108 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 74.0 = IDR 532,355 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 22.0 = IDR 132,000 12 26-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 22.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 1,908,915 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (23,765) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (95,446) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Period: 1 May 2012 - 31 May 2012

Gross Rp 21,543,588 27 11-Jul-12 1 13.0 8:00 17:00 8.0 5.0 1.0 4.0 - - 5.0
PKP 5,703,588 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (23,765) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,860,259 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 22.0 22 0 22 - 16.0 25.0 - - 74.0
MANDIRI 38 41.0

100 Name ADE ID UI-109 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Dept 6 20-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 157.0 = IDR 1,129,456 11 25-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Transport = 6,000 x 24.0 = IDR 144,000 12 26-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Shift 2 = 4,000 x 11.0 = IDR 44,000 13 27-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
= IDR - 15 29-Jun-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,562,016 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (54,787) 23 7-Jul-12 M 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Period: 1 May 2012 - 31 May 2012

JHT Rp 6,721 25 9-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (128,101) 26 10-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 28,988,940 27 11-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 13,148,940 28 12-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (54,787) - 29 13-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,482,338 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 35.0 24 11 13 - 20.0 53.0 3.0 3.0 157.0
MANDIRI 38 79.0

101 Name ADE ID UI-110 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Dept 6 20-Jun-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
8 22-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 58.0 = IDR 417,251 11 25-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
Transport = 6,000 x 20.0 = IDR 120,000 12 26-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Meal Puasa = x 20.0 = IDR - 14 28-Jun-12 1 8.0 8:00 17:00 8.0 - - - - - -
= IDR - 15 29-Jun-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 1,781,811 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR (118,530) 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Tax = = IDR (17,728) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -


PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (89,091) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 20,094,600 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 4,254,600 28 12-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PPH 21 (17,728) - 29 13-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,620,663 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 20.0 20 0 20 - 12.0 20.0 - - 58.0
MANDIRI 38 32.0

102 Name ADE ID UI-111 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 111.0 = IDR 798,533 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 15.0 = IDR 90,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 10.0 = IDR 40,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 5.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 2,173,093 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -


Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (36,313) 23 7-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (108,655) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 24,555,216 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 8,715,216 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (36,313) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,111,888 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 25.0 15 10 5 - 10.0 33.0 2.0 6.0 111.0
MANDIRI 38 51.0

103 Name ADE ID UI-112 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 128.5 = IDR 924,428 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 15.0 = IDR 90,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 6.0 = IDR 24,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 9.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Period: 1 May 2012 - 31 May 2012

TOTAL = IDR 2,282,988 19 3-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (41,533) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (114,149) 26 10-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Gross Rp 25,808,016 27 11-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 9,968,016 28 12-Jul-12 2 10.5 20:00 5:00 8.0 2.5 1.0 1.5 - - 2.5
PPH 21 (41,533) - 29 13-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
THP = IDR 2,216,563 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 21.0 15 6 9 - 13.0 39.5 2.0 6.0 128.5
MANDIRI 38 60.5

104 Name ADE ID UI-113 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 52.0 = IDR 374,087 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 14.0 = IDR 84,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 1,702,647 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (13,967) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (85,132) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 19,192,128 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 3,352,128 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (13,967) - 29 13-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,663,789 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 14.0 14 0 14 - 10.0 17.0 1.0 - 52.0
MANDIRI 38 28.0

105 Name ADE ID UI-114 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 38.5 = IDR 276,969 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 13.0 = IDR 78,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 8.0 = IDR 32,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 5.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 1,631,529 19 3-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction : 20 4-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Tax = = IDR (10,589) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (81,576) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 18,381,384 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP 2,541,384 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (10,589) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,596,048 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 21.0 13 8 5 - 7.0 14.0 - - 38.5
MANDIRI 38 21.0

106 Name ADE ID UI-115 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 77.0 = IDR 553,937 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 14.0 = IDR 84,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
TOTAL = IDR 1,882,497 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (22,510) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (94,125) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 21,242,424 27 11-Jul-12 1 13.0 8:00 17:00 8.0 5.0 1.0 4.0 - - 5.0
PKP 5,402,424 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (22,510) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,835,096 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 14.0 14 0 14 - 12.0 28.0 1.0 - 77.0
MANDIRI 38 41.0

107 Name ADE ID UI-116 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Overtime = 7,194 x 15.5 = IDR 111,507 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 13.0 = IDR 78,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,434,067 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (1,210) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (71,703) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 16,130,316 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 290,316 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (1,210) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,407,966 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 13.0 13 0 13 - 5.0 4.0 - - 15.5
MANDIRI 38 9.0

108 Name ADE ID UI-117 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 36.0 = IDR 258,984 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 12.0 = IDR 72,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 1,575,544 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (118,530) 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (7,930) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (78,777) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 17,743,152 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 1,903,152 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (7,930) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,424,193 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 12.0 12 0 12 - 6.0 12.0 1.0 - 36.0
MANDIRI 38 19.0

109 Name ADE ID UI-118 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period: 1 May 2012 - 31 May 2012

Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 32.5 = IDR 233,805 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 14.0 = IDR 84,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,562,365 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (7,304) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (78,118) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 17,592,912 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 1,752,912 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (7,304) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,530,170 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 14.0 14 0 14 - 5.0 11.0 1.0 - 32.5
MANDIRI 38 17.0

110 Name ADE ID UI-119 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Period: 1 May 2012 - 31 May 2012

Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -


Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 124.5 = IDR 895,652 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 16.0 = IDR 96,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 4.0 = IDR 16,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 12.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 2,252,212 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (40,072) 23 7-Jul-12 L1 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
PTKP (1,320,000) 24 8-Jul-12 L1 10.5 0:00 0:00 0.0 10.5 - 7.0 1.0 2.5 10.5
JHT Rp 6,721 25 9-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
B. Jab 5% (112,611) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 25,457,160 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 9,617,160 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (40,072) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 2,187,249 31 15-Jul-12 L2 11.0 0:00 0:00 0.0 11.0 - 7.0 1.0 3.0 11.0
32 16-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 20.0 16 4 12 - 9.0 34.0 3.0 8.5 124.5
MANDIRI 38 54.5

111 Name ADE ID UI-120 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Period: 1 May 2012 - 31 May 2012

Status TK 3 WH Over Time


Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 33.5 = IDR 240,999 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 13.0 = IDR 78,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 3.0 = IDR 12,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,575,559 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (118,530) 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (7,931) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (78,778) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 17,743,320 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 1,903,320 28 12-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PPH 21 (7,931) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,424,207 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 16.0 13 3 10 - 9.0 10.0 - - 33.5
MANDIRI 38 19.0
Period: 1 May 2012 - 31 May 2012

112 Name ADE ID UI-121 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 58.0 = IDR 417,251 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 13.0 = IDR 78,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 13.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 1,739,811 19 3-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Tax = = IDR (15,733) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
B. Jab 5% (86,991) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 19,615,800 27 11-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
PKP 3,775,800 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (15,733) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,699,188 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 13.0 13 0 13 - 12.0 20.0 - - 58.0
Period: 1 May 2012 - 31 May 2012

MANDIRI 38 32.0

113 Name ADE ID UI-122 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 35.0 = IDR 251,790 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 14.0 = IDR 84,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 5.0 = IDR 20,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 9.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,600,350 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Tax = = IDR (9,108) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
B. Jab 5% (80,017) 26 10-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Gross Rp 18,025,944 27 11-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PKP 2,185,944 28 12-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
PPH 21 (9,108) - 29 13-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,566,350 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
35
Period: 1 May 2012 - 31 May 2012

36 TOTAL Shift 1 Shift 2 OT


ADE _______________ 37 19.0 14 5 9 - 4.0 13.0 1.0 - 35.0
MANDIRI 38 18.0

114 Name ADE ID UI-123 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 34.0 = IDR 244,596 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 14.0 = IDR 84,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 14.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
TOTAL = IDR 1,573,156 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (7,816) 23 7-Jul-12 L1 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (78,658) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 17,715,924 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 1,875,924 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (7,816) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,540,448 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0


35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 14.0 14 0 14 - 6.0 11.0 1.0 - 34.0
MANDIRI 38 18.0

115 Name ADE ID UI-124 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 58.0 = IDR 417,251 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 14.0 = IDR 84,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 4.0 = IDR 16,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,761,811 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR - 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (16,778) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (88,091) 26 10-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Gross Rp 19,866,600 27 11-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
PKP 4,026,600 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (16,778) - 29 13-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,720,143 31 15-Jul-12 L2 8.0 0:00 0:00 0.0 8.0 - 7.0 1.0 - 8.0
Period: 1 May 2012 - 31 May 2012

32 16-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0


Diterima oleh, Payroll, 33 17-Jul-12 2 10.0 20:00 5:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 2 11.0 20:00 5:00 8.0 3.0 1.0 2.0 - - 3.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 18.0 14 4 10 - 10.0 20.0 1.0 - 58.0
MANDIRI 38 31.0

116 Name ADE ID UI-125 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 19.0 = IDR 136,686 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 10.0 = IDR 60,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 10.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
TOTAL = IDR 1,441,246 19 3-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Deduction : 20 4-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Deduction = = IDR (177,794) 22 6-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Tax = = IDR (1,551) 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
B. Jab 5% (72,062) 26 10-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Gross Rp 16,212,156 27 11-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
PKP 372,156 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 (1,551) - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -


THP = IDR 1,237,010 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Diterima oleh, Payroll, 33 17-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 10.0 10 0 10 - 6.0 5.0 - - 19.0
MANDIRI 38 11.0

117 Name ADE ID UI-125 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 12.5 = IDR 89,925 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,382,485 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (69,124) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 15,542,280 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

PKP (297,720) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,357,594 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
Diterima oleh, Payroll, 33 17-Jul-12 1 11.0 8:00 17:00 8.0 3.0 1.0 2.0 - - 3.0
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 3.0 4.0 - - 12.5
MANDIRI 38 7.0

118 Name ADE ID UI-127 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 1.5 = IDR 10,791 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,303,351 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

B. Jab 5% (65,168) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -


Gross Rp 14,640,156 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,199,844) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,278,460 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 1.0 - - - 1.5
MANDIRI 38 1.0

119 Name ADE ID UI-128 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 1.5 = IDR 10,791 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,303,351 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (65,168) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 14,640,156 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,199,844) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,278,460 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 1.0 - - - 1.5
MANDIRI 38 1.0

120 Name ADE ID UI-129 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 10.5 = IDR 75,537 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,368,097 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (68,405) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 15,378,252 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (461,748) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,343,206 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 3.0 3.0 - - 10.5
MANDIRI 38 6.0

121 Name ADE ID UI-130 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 10.5 = IDR 75,537 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,368,097 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (68,405) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 15,378,252 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (461,748) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,343,206 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
Diterima oleh, Payroll, 33 17-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
34 18-Jul-12 1 10.0 8:00 17:00 8.0 2.0 1.0 1.0 - - 2.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 3.0 3.0 - - 10.5
MANDIRI 38 6.0

122 Name ADE ID UI-131 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 1.5 = IDR 10,791 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,303,351 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (65,168) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 14,640,156 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,199,844) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,278,460 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 1.0 - - - 1.5
MANDIRI 38 1.0

123 Name ADE ID UI-132 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 1.5 = IDR 10,791 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,303,351 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (65,168) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 14,640,156 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,199,844) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,278,460 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 1.0 - - - 1.5
MANDIRI 38 1.0

124 Name ADE ID UI-133 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Overtime = 7,194 x 1.5 = IDR 10,791 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Adjustment = = IDR - 17 1-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,303,351 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR - 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PTKP (1,320,000) 24 8-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (65,168) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 14,640,156 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,199,844) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 1,278,460 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 1.0 - - - 1.5
MANDIRI 38 1.0

125 Name ADE ID UI-134 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -
Overtime = 7,194 x 1.5 = IDR 10,791 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Period: 1 May 2012 - 31 May 2012

Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x - = IDR - 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 8.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,303,351 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR (829,707) 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (65,168) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 14,640,156 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,199,844) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 448,753 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
34 18-Jul-12 1 9.0 8:00 17:00 8.0 1.0 1.0 - - - 1.0
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 8.0 8 0 8 - 1.0 - - - 1.5
MANDIRI 38 1.0

126 Name ADE ID UI-135 1 ADE


Position Operator 2 TIME SHEET REPORT Period: 1 May 2012 - 31 May 2012
Status TK 3 WH Over Time
Date Shift TTL OT Total OT
Code 4 In Out TTL HRS 1.5 2.0 3.0 4.0
Cost Center 5 19-Jun-12 0:00 0:00 0.0 - - - - - -
Dept 6 20-Jun-12 0:00 #N/A #N/A - - - - - -
Period Contract 8-Mar-10 7-Mar-13 7 21-Jun-12 0:00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8 22-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
9 23-Jun-12 M 0:00 0:00 0.0 - - - - - -
Period: 1 May 2012 - 31 May 2012

Basic Salary = 1,244,560 = IDR 1,244,560 10 24-Jun-12 M 0:00 0:00 0.0 - - - - - -


Overtime = 7,194 x - = IDR - 11 25-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Transport = 6,000 x 8.0 = IDR 48,000 12 26-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Shift 2 = 4,000 x 3.0 = IDR 12,000 13 27-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Meal Puasa = x 5.0 = IDR - 14 28-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 15 29-Jun-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
= IDR - 16 30-Jun-12 M 0:00 0:00 0.0 - - - - - -
Adjustment = = IDR - 17 1-Jul-12 M 0:00 0:00 0.0 - - - - - -
= IDR - 18 2-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TOTAL = IDR 1,304,560 19 3-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction : 20 4-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
JHT = (1,244,560) x 2% = IDR (24,891) 21 5-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Deduction = = IDR (829,707) 22 6-Jul-12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Tax = = IDR - 23 7-Jul-12 M 0:00 0:00 0.0 - - - - - -
PTKP (1,320,000) 24 8-Jul-12 M 0:00 0:00 0.0 - - - - - -
JHT Rp 6,721 25 9-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
B. Jab 5% (65,228) 26 10-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
Gross Rp 14,653,932 27 11-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PKP (1,186,068) 28 12-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
PPH 21 - - 29 13-Jul-12 1 8.0 8:00 17:00 8.0 - - - - - -
30 14-Jul-12 M 0:00 0:00 0.0 - - - - - -
THP = IDR 449,962 31 15-Jul-12 M 0:00 0:00 0.0 - - - - - -
32 16-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
Diterima oleh, Payroll, 33 17-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
34 18-Jul-12 2 8.0 20:00 5:00 8.0 - - - - - -
35
36 TOTAL Shift 1 Shift 2 OT
ADE _______________ 37 11.0 8 3 5 - - - - - -
MANDIRI 38 -
PT. Sejahtera Bersama
Perusahaan Dagang Mainan

talenta.co
DATA : LAPORAN GAJI KARYAWAN
SUBYEK : BIAYA TENAGA KERJA
PERIODE : JULI 2018

LEMBUR POTONGAN TOTAL


NO ID NAMA JABATAN STS GAJI POKOK TUNJANGAN TOTAL GAJI POTONGAN THP
JAM RATE JUMLAH T. JABATAN BPJS JHT JKK JPN PPH 21

1 CN-001 DONO Staff Accounting K/1 4,500,000.00 - 41.75 26,011.56 1,085,983.00 5,585,983.00 (279,299.00) (45,000.00) (90,000.00) (45,000.00) (45,000.00) - (504,299.00) 5,081,684.00
2 CN-002 KASINO Staff Finance K/0 4,500,000.00 - 41.75 26,011.56 1,085,983.00 5,585,983.00 (279,299.00) (45,000.00) (90,000.00) (45,000.00) (45,000.00) (10,334.00) (514,633.00) 5,071,350.00
3 CN-003 INDRO Manager F&A K/3 9,000,000.00 500,000.00 41.75 52,023.12 2,171,965.00 11,671,965.00 (500,000.00) (80,000.00) (180,000.00) (90,000.00) (90,000.00) (293,128.00) (1,233,128.00) 10,438,837.00
4 CN-004 EIKICHI ONIZUKA SPV F&A TK/0 6,000,000.00 - 41.75 34,682.08 1,447,977.00 7,447,977.00 (372,399.00) (60,000.00) (120,000.00) (60,000.00) (60,000.00) (113,779.00) (786,178.00) 6,661,799.00
5 CN-005 DADAN DANIRA Staff HRD K/3 4,000,000.00 - 41.75 23,121.39 965,318.00 4,965,318.00 (248,266.00) (40,000.00) (80,000.00) (40,000.00) (40,000.00) - (448,266.00) 4,517,052.00
6 CN-006 HATAKE KAKASHI Staff HRD TK/0 4,000,000.00 - 41.75 23,121.39 965,318.00 4,965,318.00 (248,266.00) (40,000.00) (80,000.00) (40,000.00) (40,000.00) (853.00) (449,119.00) 4,516,199.00
7 CN-007 NOBI NOBITA Manager HRD K/2 9,000,000.00 500,000.00 41.75 52,023.12 2,171,965.00 11,671,965.00 (500,000.00) (80,000.00) (180,000.00) (90,000.00) (90,000.00) (349,378.00) (1,289,378.00) 10,382,587.00
8 CN-008 DINAR AMALA Sales TK/0 3,750,000.00 - 41.75 21,676.30 904,986.00 4,654,986.00 (232,749.00) (37,500.00) (75,000.00) (37,500.00) (37,500.00) - (420,249.00) 4,234,737.00
9 CN-009 GODA TAKESHI Sales TK/0 3,750,000.00 - 41.75 21,676.30 904,986.00 4,654,986.00 (232,749.00) (37,500.00) (75,000.00) (37,500.00) (37,500.00) - (420,249.00) 4,234,737.00
10 CN-010 NILA SADANI SPV Sales K/1 4,000,000.00 - 41.75 23,121.39 965,318.00 4,965,318.00 (248,266.00) (40,000.00) (80,000.00) (40,000.00) (40,000.00) - (448,266.00) 4,517,052.00

TOTAL 52,500,000.00 1,000,000.00 417.50 12,669,799.00 66,169,799.00 (3,141,293.00) (505,000.00) (1,050,000.00) (525,000.00) (525,000.00) (767,472.00) (6,513,765) 59,656,034.00

Prepared Checked

……………………… ………………………
Payroll Manager
PT. Sejahtera Bersama
Perusahaan Dagang Mainan
Talenta.co

CONTOH SLIP GAJI


ID : CN-007
NAMA : NOBI NOBITA
JABATAN : Manager HRD
STS : K/2

PENERIMAAN POTONGAN
Gaji Pokok : 9,000,000.00 Tunj. Jabatan : 500,000.00
Tunjangan : 500,000.00 BPJS : 80,000.00
Lembur : 2,171,965.00 JHT : 180,000.00
Transport : - JKK : 90,000.00
Uang Makan : - JPN : 90,000.00
Bonus : - PPH 21 : 349,378.00

TOTAL PENERIMAAN 11,671,965.00 TOTAL POTONGAN 1,289,378.00

THP 10,382,587.00

Payroll Diterima Oleh,

_______________ NOBI NOBITA

You might also like