You are on page 1of 9

WEIGHT BASED ON DRAWING PRODUCED BY

NO ITEM/DESCRIPTION

Volume Unit BARATA

1 MAIN GANTRY
Portal 6820 kg x
Front leg 2467 kg x
Rear leg 3020 kg x
Sill beams and rocker beams 20459 kg x
Upper and Lower slewing ring frame
Portal walkways 9397 kg x
Slewing ring with driving unit
Boom supporting structure 3925 kg x
Boom hinge

2 TRAVELLING
Traveling bogies with wheels, gearboxes and motors
Storm braking device and rail clamps

3 BOOM
Boom frame 23437 kg x
Access ladders, stairs and walkways (Included in boom frame) x
Counterweight 120040 kg x
Conveyor frame 4735 kg x
Boom conveyor with:
- Idler and return rollers
- Towing pulley with gearbox and motor
- Snub pulley
- Idle pulley
- Take-up unit
Belt conveyor covering 1302 kg x
Belt scraper
Rubber belt
Connection hopper 1000 kg x
Lifting pistons with pins and hydraulic unit
Supporting structure for operator’s cabin 1925 kg x
Walkways and ladders for operator’s cabin 2020 kg x

4 BOOM REST TOWER


FRAME 5874 kg x
WALKWAYS 2450 kg x

5 PORTAL CONVEYOR
Access ladders, stairs and walkways 3015 kg x
Conveyor frame 1645 kg x
Conveyor with:
- Idler and return rollers
- Towing pulley with gearbox and mot
- Snub pulley
- Idle pulley
- Take-up unit
Belt conveyor covering 7263 kg x
Belt scraper
Rubber belt
Receiving hopper 535 kg x
Unloading hopper 1341 kg x
Supporting structure and tie rod 27525 kg x

6 TELESCOPIC LOADING CHUTE


Telescopic loading chute
Winch for unloading chute
Trimming spoon

7 TRIPPER
Idlers rollers for tripper
Belt idle drums
Belt scraper
Tripper structure 8707 kg
Access ladder and stairs 3217 kg
Discharging chute 1995 kg
Tripper bogies
Belt anti-lifting system

8 LUBRICATION
Grease lubricating system

9 CABIN AND ELECTRICAL PARTS


Main cabin with air cond. And lighting
Operator Cabin with air cond. And lighting
Electrical board for power and control with PLC
Limit switch and sensor
Cable chain and cable
MV Transformers
Safety device such as rope switch etc.
DUST COLLECTOR
Dust Collector System

= Bedeschi Part
= Barata Part
WEEKLY PROGR
PRODUCED BY VENDOR FABRICATION LOCATION

LAST PERIOD
BEDESCHI OTHERS

BARATA BARATA WORKSHOP - GRESIK 12%


BARATA BARATA WORKSHOP - GRESIK 8%
BARATA BARATA WORKSHOP - GRESIK 5%
BARATA BARATA WORKSHOP - GRESIK 4%

BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK


BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK


BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK


BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK


BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK

BARATA BARATA WORKSHOP - GRESIK


BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK
BARATA BARATA WORKSHOP - GRESIK
WEEKLY PROGRESS FINISH TARGET
REMARK
UP TO THIS
THIS PERIOD WORKSHOP FOB ETA Surabaya On Site
PERIOD

4% 16% ### 14-Jun-19


3% 11% ### 15-Jun-19
2% 7% ### 17-Jun-19
1% 5% Friday, June 28, 2019 30-Jun-19

Friday, July 12, 2019 14-Jul-19

### 6-Jul-19

### 19-Jul-19
### 19-Jul-19
### 15-Jul-19
### 12-Aug-19
### 22-Jul-19

### 26-Aug-19

### 28-Aug-19
### 29-Aug-19

Friday, July 12, 2019 14-Jul-19


Friday, July 12, 2019 14-Jul-19

### 7-Sep-19
### 8-Sep-19

### 5-Sep-19

### 7-Sep-19
### 8-Sep-19
### 30-Aug-19
### 19-Jul-19
### 22-Jul-19
### 22-Jul-19

You might also like