July 2, 2010 – Pit 4, Zone 3

July 3, 2010 – Pit 4, Zone 3


July 8, 2010 – Pit 4, Zone 3
July 9, 2010 – Zone 2 & 3 Enbankment
July 15, 2010 – Dyke Pipe Installation
July 17, 2010 – Dyke Pipe Installation
July 18, 2010 – Dyke Pipe Installation
July 19, 2010 – Dyke Pipe Installation
July 20, 2010 – Dyke Pipe Installation
July 21, 2010 – Pit 4
July 23, 2010 – Pit 4
July 23, 2010 – Preparation of Zone 3 Pit for the next cut
July 25, 2010 – Zone 1 Central Pit Progress Looking North
July 28, 2010 – Excavation of East Ponds
July 29, 2010 – Placing Z1 Material on the East Dyke
July 30, 2010 – Placing Z1 Material in the East Dyke
July 30, 2010 – Install Instruments In The East Dyke