This document outlines the components and chapters of a pre-feasibility study for a regional water supply system and management (SPAM) project. It includes chapters that will cover: the introduction and background; a general description of the study area; an assessment of the existing water supply system; an analysis of available raw water sources; water demand projections; development planning and alternatives for the water supply system; and a financial analysis of the investment's feasibility. The chapters will evaluate topics such as administrative area, population, infrastructure, water allocation, treatment facilities, distribution networks, investment needs, financial assumptions, and economic analysis.
This document outlines the components and chapters of a pre-feasibility study for a regional water supply system and management (SPAM) project. It includes chapters that will cover: the introduction and background; a general description of the study area; an assessment of the existing water supply system; an analysis of available raw water sources; water demand projections; development planning and alternatives for the water supply system; and a financial analysis of the investment's feasibility. The chapters will evaluate topics such as administrative area, population, infrastructure, water allocation, treatment facilities, distribution networks, investment needs, financial assumptions, and economic analysis.
This document outlines the components and chapters of a pre-feasibility study for a regional water supply system and management (SPAM) project. It includes chapters that will cover: the introduction and background; a general description of the study area; an assessment of the existing water supply system; an analysis of available raw water sources; water demand projections; development planning and alternatives for the water supply system; and a financial analysis of the investment's feasibility. The chapters will evaluate topics such as administrative area, population, infrastructure, water allocation, treatment facilities, distribution networks, investment needs, financial assumptions, and economic analysis.
KOMPONEN PRA FEASIBILY STUDY SISTEM PENYEDIAAN AIR MINUM
(COMPONENTS PRE-FEASIBILITY STUDY OF WATER SUPPLY SYSTEM AND MANAGEMENT)
BAB 1 PENDAHULUAN CHAPTER 1 INTRODUCTION
1. 1. Latar Belakang 1.1 Background 1. 2. Maksud dan Tujuan 1.2 Purpose and Objective 1. 3. Sasaran 1.3 Target 1. 4. Lokasi Kegiatan 1.4 Location of Study 1. 5. Lingkup Kegiatan 1.5 Scope of work 1. 6. Keluaran 1.6 Output 1. 7. Metodologi 1.7 Methodology 1. 8. Sistematika Konsep Laporan Akhir 1.8 Outline of the final report
BAB 2 GAMBARAN UMUM WILAYAH CHAPTER 2 GENERAL DESCRIPTION
OF AREA 1. 1. Wilayah Administrasi 2.1 Administrative Area 1. 9. Kondisi Geografis 2.2 Geographical Conditions 1. 10. Fisik Dasar 2.3 Physical Conditions 1. 11. Penduduk 2.4 Existing Population 1. 12. Kondisi Perekonomian 2.5 Economic Conditions 1. 13. Rencana Pengembangan dan Tata Ruang Wilayah 2.6 Regional Spatial Planning
BAB 3 KONDISI EKSISTING SPAM PDAM CHAPTER 3 EXISTING CONDITIONS
OF WATER SUPPLY SYSTEM AND MANAGEMENT 1. 1. Gambaran Baku 3.1 General Description 1. 14. Unit Air Baku 3.2 Raw Water Unit 1. 15. Unit Produksi 3.3 Production Unit 1. 16. Unit Distribusi 3.4 Distribution Unit 1. 17. Unit Pelayanan 3.5 Service Unit 1. 18. Unit Pengelolaan 3.6 Management Unit
BAB 4 KETERSEDIAAN AIR BAKU CHAPTER 4 AVAILABILITY OF RAW
WATER 1. 1. Profil dan Gambaran Umum 4.1 Profile and Overview 1. 19. Alokasi Air Baku 4.2 Water Allocation 1. 20. Alternatif Lokasi Intake 4.3 Alternative for Intake Location 1. 21. Jalur Transmisi Air Baku 4.4 Transmission systems 1. 22. Usulan Rencana Lokasi IPA 4.5 Proposed Location for WTP BAB 5 PROYEKSI KEBUTUHAN AIR CHAPTER 5 WATER DEMAND PROJECTION 1. 1. Premis dan Asumsi 5.1 Water Demand Projection scenario 1. 23. Proyeksi Penduduk 5.2 Population Projections 1. 24. Proyeksi Kebutuhan Air 5.3 Water Demand Projection
BAB 6 RENCANA PENGEMBANGAN SPAM CHAPTER 5 SPAM DEVELOPMENT
PLANNING (Alternative dan kelayakan teknis) (Alternative and Technical Feasibility 1. 25. Rencana Umum 5.1 General planning for Regional SPAM Pengembangan SPAM Regional Development 1. 26. Perencanaan Sistem Hulu 5.2 Upstream System Planning 1. 1. 1. Bangunan Pengambilan Air Baku/Intake 5.2.1 Intake 1. 1. 2. Pipa Transmisi Air Baku 5.2.2 Transmission system 1. 1. 3. Instalasi Pengolahan Air (IPA) 5.2.3 Water Treatment Plant (WTP) 1. 1. 4. Pipa Transmisi Air Minum (Curah) 5.2.4 Water Distribution System 1. 1. 5. Perkiraan Investasi Sistem SPAM Hulu 5.2.5 Estimated Investment of Upstream (Unit Air Baku dan Unit Produksi) System 1. 27. Perencanan Sistem Hilir 5.3 Downstream System Planning 1. 1. 6. Rencana Daerah Pelayanan 5.3.1 Service Area 1. 1. 7. Rencana Reservoir Offtake (Penerima) 5.3.2 Reservoir Area 1. 1. 8. Rencana Jaringan Distribusi Utama 5.3.3 Water Distribution Network 1. 1. 9. Perkiraan Investasi Sistem Hilir 5.3.4 Estimated Investment of Downstream 1. 28. Indikasi Skema Investasi 5.4 Alternative Investment Scheme
BAB 6 ANALISIS KELAYAKAN INVESTASI CHAPTER 6 SPAM INVESTMENT
SPAM REGIONAL ANALYSIS 1. 29. Pola Investasi dan Alternatif Pendanaan 6.1 Alternative of Investment 1. 30. Kebutuhan Investasi dan Sumber Dana 6.2 Funding and Investment Needs 1. 31. Dasar Penentuan Asumsi Keuangan 6.3 Basic Financial Assumption 1. 1. 10.Asumsi CAPEX 6.3.1 Capital Expenditure Cost 1. 1. 11.Asumsi OPEX 6.3.2 Operational Expenditure Cost 1. 1. 12.Penjualan Air 6.3.3 Water sales income 1. 1. 13.Harga Dasar Satuan Harga 6.3.4 Basic Price Unit 1. 1. 14.Tingkat Bunga/ Faktor Diskonto 6.3.5 Interest Rate 1. 32. Analisis Kelayakan Keuangan 6.4 Financial Feasibility Analysis