1. Introduction to PPMCP
1.1 Executive Summary
1.2 Background
1.3 Objective of the Project
1.4 Bihar’s Artistic Heritage
1.5 City Overview
2. Project Description
2.1 Site Description
2.2 Proposed Structure
2.3 Construction Methodology
2.4 Standards
3. Master Plan
3.1 Site Description
3.2 Existing Structures
3.3 Proposed Structures
3.4 Service Road
3.5 Vehicular Circulation Plan
3.6 Parking
4. Interior of the Museum
4.1.
5. Environmental Aspects
3.1 Environmental Scoping
3.2 Land Environment
3.3 Geography, Geology & Soils
3.4 Seismicity
3.5 Soil Quality
3.6 Water Environment
3.7 Water Resources
3.8 Hydrogeology & Ground Water
3.9 Water Quality
3.10 Meteorology
3.11 Air Environment
3.12 Noise Environment
3.13 Trees
3.14 Socio Economic Conditions
3.15 Environmental Categorization & Clearances
3.16 Environmental Impact Assessment
3.17 Environmental Management Plan
6. Impacts Due to Project Construction
4.1 Air Pollution & Dust Generation
4.2 Water Pollution
4.3 Increased Water Demand
4.4 Excavation & Dumping of Soil
4.5 Noise Due to Demolition
4.6 Construction Waste Generation
4.7 Increase in Traffic
7. Environmental Monitoring Plan
7.1. Pre-Construction Phase
7.2. Construction Phase
7.3. Water Quality
7.4. Air Quality
7.5. Workers Health & Safety
7.6. Operation Phase
7.7. Establishment of an Environmental Division
8. Impact Due to Project Operation
8.1. Museum Refuse
8.2. Traffic Congestion around The Museum
8.3. Museum as Knowledge Hub
8.4. Museum as a source of Entertainment
9. Cost Estimates
9.1. Summary of Costs
9.2. Conclusion