You are on page 1of 2

General Contractor – Supplier

Alamat : Jln. Jermal XV Gg. Harapan No. 7 A Medan


Office : Jln. Jawa No. 110 Medan, Telp. 061-42566890

Medan, 29th April 2021


FULL CORPORATE OFFER (FCO)
029/FCO/MBP-CP/Dir/IV/21

To : CHINA POWER Co., Ltd.


Attn : - Mr. Mark, Cheung Tin Yau

Dear Sir,
We, PT. Multikarya Bisnis Perkasa seller with full legal and corporate responsibilities confirm that we are ready,
willing and able to offer for the sale the following commodity in accordance with term and conditions set out
as follows:

Origin : MULTY MINE INDONESIA STEAM COOL


Calorie (ARB) : Gar 6,300 – 6,100
Capacity : +/- 70,000 MT (ETA 45 Days)
Schedule Supply /Laycan : April - May 2021 onward
Loading Point : PT. ENERGI BUMI TAPIN
Anchorage : Muara Tabaneo, South Kalimantan, Indonesia
Price : ICI MINUS U$D 3
Payment Terms : Letter of Credeit (L/C) At Sight MT 700 Non Performance Bond
(PB)
Surveyor : Independent
Validity : 7 (seven) working days
Specification :

MINE Technical Parameters : PT. BUMI ENERGITypical TAPIN Rejection


Total Moisture (ar) 8 – 12%
+/- 70.000 MT/Month >12%
Inherent Moisture (ad) : 503/4-IUP-OP4/DTMPTSP/IV/XI/2019
IUP OP Nomor 5% -
Ash Content (ad) ISSUING DATE : 10 – 12 % >12%
Total Sulphur (ad) LOCATION : 0.5 – 1% >1%
Volatile Matter (ad) SIZE OF COAL MINE : 0.50
42% -
HOULING DISTANCE : 10 KM
Fixed Carbon (ad) 42% -
Gross Calorific Value (ar) 6,300 – 6,100 kcal/kg <6,100
HGI (points) 38 - 40 -
Size (0-50mm) 90% -
JETTY : TALENTA KM71
CAPACITY TO ACCEPT BARGE SIZE : 300ft
LOADING RATE :
FROM JETTY TO LOAD PORT :

To proceed with the above subject matter as per plan and scheduling:
1. Buyer shall approve the FCO, signing and endorse.
2. Buyer shall submit Draft Contract to our company within 3 (days) days after signing and approve
the FCO. (If the buyer chooses, the seller can send their draft contract too)
3. Seller review draft of contract.
4. Seller & Buyer signing Electronic draft contract.
5. Buyer make site visit (Mine/stockpile/Jetty) if required.
6. Satisfied with the visit and coal quality, Buyer and seller sign Hard copy Contract based on
electronic contract agreed.

We hear by good news from you, thanks for your kind attention and co-operations.

PT. MULTIKARYA BISNIS PERKASA

Cori Siska
President Director

You might also like