You are on page 1of 1

Republic of the

Philippines
Province of Oriental Negros

OFFICE OF THE
BUILDING OFFICIAL

MUNICIPAL / CITY
LOT DESCRIPTION

N
ENGINEERING OFFICE

W
TO
THE SITE

IA
C
LINES BEARING DISTANCE CITY / MUNICIPALITY OF:

N
LE
VA
1-2 N. 18° 10' W 40.13 M.
MUN. OF VALENCIA
2-3 N. 40° 44' W 39.06 M.
Plans Meets NBC Requirements:
3-4 N. 80° 48' E 35.62 M.

4-5 S 27° 45' E 5.20 M.

5-6 N. 79° 16' W 22.19 M. BUILDING OFFICIAL


6-7 S. 08° 11' E 69.78 M. DATE:
7-8 S. 35 41' W 14.59 M.

8-9 SHT.
S. 69° 14' W 2.96 M.
NO. CONTENTS LANDUSE @ ZONING
9-10 N. 75° 52' W 14.05 M.
APPROVED BY:
10-1 N. 48° 57' W 8.51 M. VICINITY PLAN

CAMP LOOK OUT A-1


SITE DEVELOPMENT PLAN
BEARING
PLACE PERSPECTIVE
HEAD
GROUND FLOOR PLANS
A-2
SECOND FLOOR PLANS DATE:
HIGHLAND COFFE
FRONT ELEVATION
LEFT ELEVATION
A-3
RIGHT ELEVATION
LINE AND GRADE
3 VICINITY MAP REAR ELEVATION

FIVE SECTIONS APPROVED BY:


A-1 A-4
1 : 75 SPOT DETIAL

GROUND & SECOND CEILING PLANS


STAIR DETAIL

A-5 KITCHEN PLAN & SECTION DETAIL HEAD


CLOSET PLAN & SECTION DETAIL
DATE:
PLANT BOX DETAIL

A-6 DOOR & WINDOW SCHEDULE

GROUND & SECOND FLOOR LIGHTING LAYOUT


GROUND & SECOND FLOOR POWER LAYOUT ARCHITECTURAL
PB SCHEDULE OF LOADS
E-1
SINGLE DIAGRAM APPROVED BY:
ELECTRICAL NOTES & SPECIFICATION
ELECTRICAL SYMBOL

P-1 PLUMBING STANDARD DETAIL


HEAD
GROUND FLOOR WASTE PLUMBING LAYOUT
SECOND FLOOR WASTE PLUMBING LAYOUT DATE:
GREASE TRAP DETAIL
P-2
CATCH BASIN DETAIL

7
9

LOCATION
SEPTIC TANK DETAIL

GROUND FLOOR WATER PLUMBING LAYOUT


STRUCTURAL
SECOND FLOOR WATER PLUMBING LAYOUT
NORTHEAST MONSOON APPROVED BY:
10

P-3 PLUMBING NOTES & SPECIFICATION


PLUMBING SYMBOL
PLUMBING ISOMETRIC

GROUND FLOOR BEAM PLAN HEAD


S-1 SECOND FLOOR BEAM PLAN
ROOF BEAM PLAN DATE:

ROOF FRAMING PLAN


S-2 TRUSSES ISOMETRIC PLAN
M.

SCHEDULE OF TRUSSES
ELECTRICAL
.
SQ
1.4 T
,15 LO
78

ONE WAY SLAB DETAIL


=3 AL

TWO WAY SLAB DETAIL APPROVED BY:


EA TOT

ROAD LOT.

S-3 TYPICAL BEAM SCHEDULE


EAVES DETAIL
STRUCTURAL STAIR DETAIL
AR

HEAD
SUNSET SUNRISE S-4 STRUCTURAL STANDARD DETAIL
(6
1

DATE:
METERS WI

SANITARY
DE)

APPROVED BY:

HEAD

DATE:
.
FO UILD SQM
PR G
INT
OT IN
20
=2
EA

REVIEWED BY: MECHANICAL


B
AR

10.00
APPROVED BY: APPROVED BY:
6
15.00

SOUTHWEST MONSOON
2

HEAD HEAD

DATE: DATE:
3

5
4

PROCESSED BY: FIRE DEPARTMENT


APPROVED BY: APPROVED BY:

1 SITE DEVELOPMENT

D:\engineering\2-Storey Residential.rvt
A-3 A-1 HEAD HEAD
1 : 500
PERSPECTIVE DATE: DATE:

FROM THE OFFICE OF : SIGN & SEAL: PROJECT OWNER: SHEET CONTENT SHT. NO.
Ubnited Architect of the Philippines
ARCHITECT
PROJECT: PROPOSED 2-STOREY RESIDENTIAL ENGR. CARMEL HUBERT BANUA
PRC REG. NO. :

VALID UNTIL :
PTR NO.

ISSUED ON:
:

BUILDING DEJARISCO ARCHITECTURAL A-1


Owner
TIN : ISSUED AT:

DESIGN BY: PREPARED BY: CASTRO C.P.J. LOCATION: BONG BONG VALENCIA, NEG. OR. address: BAGACAY DUMAGUETE CITY 1-14

GSPublisherVersion 0.80.100.100

You might also like