You are on page 1of 13

INTSOK - PETROBRAS

Workshop on Safety Design


and Equipment

October 24, 2007


Rio de Janeiro – Brazil

E&P/ENGP/IPMI

TECHNICAL SAFETY
MANAGEMENT IN
PETROBRAS OFFSHORE
PROJECTS

E&P/ENGP/IPMI

1
PETROBRAS HSE POLICY

¾ Educate, train and commit the workforce to


HSE issues, including suppliers, communities,
regulatory authorities, workers representative
organizations and other stakeholders;
¾ Encourage reporting HSE events and consider
HSE performance in the compensation system;
¾ Promote health and environmental protection
by risk identification, control and monitoring to
ensure process safety correspond to best
international practices and be prepared for
emergencies;
E&P/ENGP/IPMI

PETROBRAS HSE POLICY

¾ Ensure the lifecycle sustainability of projects


and products, considering economical,
environmental and social impacts and benefits;
¾ Consider operations and products’ eco-
efficiency, minimizing adverse impacts inherent
to the industry’s activities.

E&P/ENGP/IPMI

2
HSE CORPORATE GUIDELINES

1. Leadership and Accountability


2. Regulatory Compliance
3. Risk Evaluation and Management
4. New Projects
5. Operation and Maintenance
6. Management of Change
7. Acquisition of Goods and Services
8. Training, education and Awareness
9. Information management
10. Communication
11. Contingency
12. Community Relations
13. Accident and Incident Analysis
14. Product Stewardship
15. Assessment and Continuous Improvement
E&P/ENGP/IPMI

HSE MANAGEMENT SYSTEM PILLARS

Leadership Visible Commitment


Line Responsibility
Management of Deviations
Continuous Learning
Focus on Human Behavior

Corporate Standards and Practices


E&P/ENGP/IPMI

3
PETROBRAS HSE GOVERNANCE
BOARD OF
DIRECTORS

EXECUTIVE
BOARD
BUSINESS
CORPORATE COMMITTEE
HSE
HSE
BUSINESS AREAS/ MANAGEMENT
SERVICES/ COMMITTEE
CONTROLLED COMPANIES

HSE OF BUSINESS AREAS/ HSE COMMITTEES


SERVICES/ OF BUSINESS AREAS/
CONTROLLED COMPANIES SERVICES/
CONTROLLED COMPANIES

BUSINESS
UNITS

HSE OF HSE COMMITTEES


BUSINESS UNITS OF BUSINESS UNITS

E&P/ENGP/IPMI

RELATIONSHIP BETWEEN GUIDELINES


Beyond ISO 14.001 and
OHSAS 18.001 Requirements
AND MANAGEMENT

HSE Guideline 3 Guideline 4 Guideline 5 Guideline 6


Guidelines Risk Evaluation New Projects Operation & Management
and Maintenance of Change
Management

HSE
Industrial SGM
Process
SMSnet SMSnet
Management
System
Cost, Schedule, Quality

HSE
PRODEP PRODEP
Project
Management
System
Cost, Schedule, Quality Requirement
Tool

Management
Guidelines ISO14.001 – OHSAS 18.001 - ISM Code – TQC - Corporate
Requirements

SGM – Management of Change System


SMSnet – Hazards Identification Tool E&P/ENGP/IPMI
PRODEP – E&P Production Development Program

4
NEW PROJECTS GUIDELINE FLOW

Gate 1
Identification
& Evaluation
of Opportunity Gate 2
Conceptual
Design
Gate 3
FEL 1 Basic
Design Gate 4
FEL 2 Executive
Design &
Construction Gate 5
FEL 3 Pre &
Assisted
E&P HEAD OFFICE Phase 4 Operation Gate 6
Operation

RESEARCH CENTER - CENPES Phase 5


De
Phase 6 commisioning
ENGINEERING DEPARTMENT

E&P BUSINESS UNIT


Phase 7

E&P/ENGP/IPMI

E&P DESIGN GUIDELINES

There are a total of 35 Technical


Specifications that set criteria
relative to the several issues that
rule the design of a Production
Installation; one of them is
E&P Safety Philosophy.

E&P/ENGP/IPMI

5
E&P SAFETY DESIGN PHILOSOPHY

ƒ Safety Requirements for Facility


ƒ Process Safety
ƒ Hazard Assessment
ƒ Fire and Gas Detection Systems
ƒ Emergency Shutdown Systems
ƒ Fire and Explosion Protection Systems
ƒ Passive Fire Protection
ƒ Active Fire Protection
ƒ Safety Requirements for Electrical Systems
ƒ Life Saving Appliances
E&P/ENGP/IPMI

MANAGEMENT OF TECHNICAL SAFETY


IN E&P PROJECTS

Fire detection,
Barrier Philosophy Gas ESD
Active fire
protection
Process detection,
control Isolation Area
ESD
(automatic of ignition separation
High quality sources, firewalls Escape,
and manual)
containment ventilation Fire protection evacuation

Accident
path

Abnormal Ignition and development of


Normal operation Accidental release
operation fire and/or explosion

Lack of Loss of Target exposed to Energy flow


control control energy flow ceases

E&P/ENGP/IPMI

6
RELEVANT E&P GUIDELINES

Risk Analysis/Assessment

Petrobras Safety Philosophy defines the risk analysis


techniques to be applied in each project phase.

Petrobras defines requirements to be followed during the


execution of the safety studies.

Petrobras Safety Philosophy requires the use of CFD on


Gas Dispersion and Explosion Studies.

E&P/ENGP/IPMI

RELEVANT E&P GUIDELINES

Fire and Gas Detection Systems

Petrobras uses several detection technologies, the choice depending on


the environment. The detectors normally used are as follow:

‰ FIRE DETECTORS
Flame (UV+IR or UV Types)
Smoke, Temperature Rate of Rise
Fusible Plugs
Fixed Temperature

Multi-Spectrum (IR3): Not implemented yet

‰ GAS DETECTORS
Methane: Point and Open Path IR detector types
H2S: Electro-Chemical detector type
E&P/ENGP/IPMI

7
RELEVANT E&P GUIDELINES

Fire and Explosion Protection Systems


- Passive Fire Protection (PFP)-

Petrobras uses PFP for bulkhead and decks in compliance


with IMO Codes and Classification Society requirements.

Petrobras uses PFP for load bearing structures defined by


previously specific Safety Studies.

Petrobras uses several PFP technologies such as intumescent


coating, cladding etc.

E&P/ENGP/IPMI

RELEVANT E&P GUIDELINES

Fire and Explosion Protection Systems


- Ative Fire Protection -
Petrobras uses several fire fighting water pump technologies
(diesel, electric, diesel-electric, hydraulic…)

Petrobras Safety Philosophy requires the following


configurations: 2X100%, 3X50%, 4X33% according to
maximum design flow rate, considering no more than
2500m3/h per pump.

Petrobras uses carbon steel epoxi lined or Cu-Ni for fire water
mains
E&P/ENGP/IPMI

8
RELEVANT E&P GUIDELINES

Fire and Explosion Protection Systems


- Ative Fire Protection -

Petrobras uses fiber glass for fire water mains, for normally not
manned installations

Petrobras uses CO2 for electrical switch-rooms and control


rooms

Petrobras uses water mist for turbine enclosures and


machinery spaces

E&P/ENGP/IPMI

RELEVANT E&P GUIDELINES

Life Saving Appliances And Equipment

Petrobras has a specific Standard for conventional lifeboats


(N-1999)

Petrobras Safety Philosophy does not require the use of free-


fall lifeboats.

E&P/ENGP/IPMI

9
MASTER VENDOR LIST OFFSHORE - MVLO

PETROBRAS DEFINES SUPPLIERS FOR


CRITICAL EQUIPMENTS AND SERVICES

E&P/ENGP/IPMI

MASTER VENDOR LIST OFFSHORE - MVLO

Fire Water Pump – Centrifugal Type

‰ FRANK MOHN

ƒDiesel Hydraulic Unit (submersible and dry


mounted)

ƒDiesel or Electrical Direct Driven

E&P/ENGP/IPMI

10
MASTER VENDOR LIST OFFSHORE - MVLO

Fire and Gas Detection


‰AUTRONICA
ƒ FIRE, GAS, HEAT AND ƒ HEAT, SMOKE DETECTORS
SMOKE DETECTION (OPTICAL)
SYSTEMS
ƒ UV, UV + IR, IR3, FLAME
ƒ ADDRESSABLE HEAT AND DETECTORS
SMOKE DETECTION
SYSTEMS ƒ OPEN PATH IR
COMBUSTIBLE GAS
DETECTORS

E&P/ENGP/IPMI

MASTER VENDOR LIST OFFSHORE - MVLO

Lifeboats and Davits


Life Rafts and Rescue Boats

‰ NORSAFE

‰ SCHAT – HARDING

E&P/ENGP/IPMI

11
MASTER VENDOR LIST OFFSHORE - MVLO

Engineering Services
DNV/PRINCIPIA
‰ GAS DISPERSION ANALYSIS ‰ QUALITATIVE RISK
ANALYSIS
‰ FIRE PROPAGATION
ANALYSIS ‰ QUANTITATIVE RISK
ANALYSIS
‰ RELIABILITY ANALYSIS

E&P/ENGP/IPMI

MASTER VENDOR LIST OFFSHORE - MVLO

Engineering Services
DNV/PRINCIPIA AND GEXCON

‰ EXPLOSION ANALYSIS

E&P/ENGP/IPMI

12
THANK YOU!