KERJA-KERJA MENURAP JALAN DI SEKITAR UNIT 2 PASUKAN SIMPANAN PERSEKUTUAN

BIL LOKASI KELUASAN (METER PERSEGI )


PANJANG LEBAR JUMLAH
1 PERSIMPANGAN LALUAN UTAMA MENUJU KE PEJABAT – 78 7 546
KABIN (BERTENTANGAN PEJABAT PENTADBIRAN)
2 GARAJ WATER CANNON – PINTU STOR TRANSPORT 18 11 198
3 HADAPAN GARAJ ‘COMMAND VEHICLES’ 36 8.7 313.2
4 BELAKANG PEJABAT PP UNIT 2 PSP-DEWAN DATO ONN 70 15.5 1085
5 BELAKAKANG BLOK C (HADAPAN KEDAI IMANLUDDIN) 40 10 400
6 HADAPAN BLOK C 90 2.7 243
7 PERSIMPANGAN DI HADAPAN KEDAI RUNCIT (BLOK A & 32 5 160
BLOK B)
8 BAHU JALAN BLOK B 28 1.5 42
9 BELAKANG BLOK B 90 1.5 135
JUMLAH 3,122.2