1.

Plumbing system Technical Design Principle 2 HVAC system Technical Design Principle
d. Manganese less than 0.05 mg/L.
2.1. Design Criteria
1.1.Design Criteria e. Sodium less than 270 mg/L. a) Outside Temperature and Humidity Condition (Ho Chi Minh City)
Description Dry bulb temp Wet bulb temp Relative humidity
a) Water Consumption Unit f. Sulfate less than 250 mg/L. °C °C %
・ Water Usage g. Iron less than 0.3 mg/L. Cooling 36.1 27 50.1
Source: TCVN 5687:2010
h. Zinc less than 5 mg/L.
Water for human Flushing water Irrigation CT
touch (including make-up i. Total Dissolved Solids less than 500 mg/L. b) Building Exterior Condition:
hot water) water According to archtectrual specification,
Aluminum spandrel: 0.73W/m 2K,
Parson per day per per day per day per day per per day (*4) Glass spandrel: 0.69 W/m 2K
m2 per day per per day Glass(2F or higher) :t=8mm glass with Low-e coating on surface-2, t=12mm air gap, t=6mm glass
parson parson parson Effluent Wastewater Characteristics Units Final effluent U-Valve: 1.65W/m 2K, sc value : 0.3
per m2 Requirements (Monthly Average) Glass(1F) : t=6mm glass, t=1.52mm PVBfilm, t=6mm glass with low-e coating on surface-4, t=12mm air gap, t=6mm glass
BOD5 mg/L 50 U-Valve: 5.0W/m 2K, sc value : 0.6
Office 1000 per 21 21 35 35 m3/d COD mg/L 100
L/d/per m3/d L/d/per TSS mg/L 100 Shading Coefficient: Assume blind to be used
NH4 + mg/L 10 ※To acquire LEED, energy consumption will be reduced by over 15% of ANSI / ASHRAE / IESNA Standard 90.1-2010 standard ratio by
Guset 100 per 4 0.4 4 4 m3/d
m3/d L/d/per Fecal Coliforms CFU/100 mL 5000 upgrading exterior specifications.
L/d/per mg/L 50
NO3 - (Excluding upgrade of air conditioning performance)
Canteen 430 per 31 21.5 1.2.Plumbing System
c) Inside Temperature and Humidity Requirement
L/d/per m3/d 1.2.1 Water Supply System
(2 times) Space description Dry Bulb Temp Relative Humidity
・ Pull in water from the city main pipe. °C % *1
Water use for 1000 m2 1.5 1.5 Office 25 50
the plants L/d/m2 m3/ ・ Water for human touch is stored in the underground pit, pumped to water tank on B2F, subjected to purification treatment, and Solution Plaza 25 50
d then subjected to pressurrized feed to each faucet. The reservoir tank shall be a two-tank type considering the maintenance, Meeting/conference
and the storage amount shall be one day's amount of water consumption.(WELL) room
Water use 2600 m2 1.5 3.9
Corridors*1 25 -
for L/d/m2 m3/d ・ Flushing Water (Domestic water) is stored in the underground pit water tank, supplied as a toilet flush water and a cooling tower Testing and 25 -
carparking makeup water by a pressurized water supply pump. Training room*2
floor Server room *2 24-26 40-50
・ The water supply flow chart is as follows:
Water use for 33m3/d
HVAC (12h/day, Incoming flow rate
*1: Although 40-50% RH will be the condition utilized for cooling load calculation, fresh air makeup system will not consist of
make up
humidifiers to raise the actual humidity.
ratio 2%)
Water for human touch
Potable
Total 42.9 42.9 1.5 33 *2: The strict control of temperature and humidity is unnecessary.
m3/d m3/d m3/ m3/d d) Internal Heating Load, Lighting Load and Ventilation Volume
d Flushing
Non Potable
Sewage
REFER TO DRAWING(Room list)

b) Receiver Tank Capacity(Filtration) Cooling


Cooling Tower
Tower Ventilation system will be designed based on ANSI/ASHRAE Standard 62-1-2010 “Ventilation for Acceptable Indoor Air Quality.”
Evaporaitor
Receiver tank one day use To acquire LEED, increase the ventilation volume by 30% or more from the above standard.
Irrigation
Evaporaitor e) Lighting and Internal Heating Load
Potable Water Tank :42.9m3/d ×1day use = 42.9m3 1.2.2 Hot Water Supply System Space description Lighting load Power load
Potable water tank and Flushing water tank shall have two tanks (One for duty, one for spare) W/m2 W/m2
・ There will be no hot water supply to the office area.
c) Water Purification Office 10 30
・ Hot water supply to the kitchen(TBD), pantry, shower etc. shall be individual electric hot water storage type.
Meeting 10 30
Type Capacity Treatment Water Quality ・ Hot water supply to the shower room B1F. shall be individual electric hot water storage type. (Hybrid Hot water system) /conference room

Corridors 10 30
Water for human touch Average flow: 42.9 m3/d HCM City supply ・ Hot water supply to cafe (1F) and solution plaza(1F,2F) shall be out of scope
Hall 10 10
Maximum flow: 70.1 m3/d →WELL required(*1) Lobby 10 10
1.2.3 Drainage, Wastewater and Vent System
d) Water Treatment System Locker room 10 10
・ Sewage is stored in the underground pit and drained to the public sewage after waste water treatment.
others REFER TO DRAWING(Room list)
Type Capacity Treatment Water Quality
・ Miscellaneous wastewater flow is shown in drainage system schematic diagram(DAV-MP-16002) f) Ventilation Volume
Black Water Average flow: 85.8 m3/d Black Water Space Number of Air Changes(A-CPH)
Maximum flow: 128.6 m3/d →refer to the Specification Car parking 6 ACPH
(HCM City sewage class B)(*4) Bike parking 6 ACPH
Toilet 10 ACPH
・ Establish rainwater utilization equipment, filter rainwater and reuse it as reclaimed water (LEED). Garbage room 10 ACPH
(*1) Tank room 5 ACPH
・ If the underground rain tank is full, change the knife gate valve close and discharge directly to the outdoor drain pipe. Water recycling system room 10 ACPH
Purification system follow WELL request only for v2,w01 as metion below. Water treatment room
Water satisfied for v2,w02 shall be supplied by gallon tank (out of scope) When storm water tank is not filled by water Kitchen (TBD) Depend on kitchen equipment

(WELL v2 W01)Part.1
Storm water on Storm water Storm water g) Air Conditioning Noise
・Turbidity less than or equal to 1.0 NTU the basement on the ground on the roof
Target air conditioning noise level will be based on “the Design Guidelines for HVAC-Related Background Sound in Rooms by 2010 ASHRAE
Application Handbook.”
(WELL v2 W01)Part.2 To Tank 1
To Tank 2,4
Room types RC(N) (QAI≦5 dB a,b)
・Contains 0 CFU / 100 mL total coliforms (including E. coli).
Storm water Water Offices ≦40
(WELL v2 W02)Part.1 incoming Drain pipe
a. Lead less than 0.01 mg/L. Conference rooms 35

b. Arsenic less than 0.01 mg/L.


open
Corridors and lobbies 40 to 45
c. Antimony less than 0.006 mg/L. stop Hall 30
d. Mercury less than 0.002 mg/L.
Storm water TANK Border line of Ambient noise level shall satisfy the requirement of well v2 so2 in order to score lpoint
e. Nickel less than 0.07 mg/L.
Building outline
this site
2.2.HVAC System
g. Cadmium less than 0.005 mg/L. 2.2.1 AC System
h. Chromium (total) less than 0.1 mg/L ・ Use the (refrigerant) individual air conditioning system and the (cold water) centralized air conditioning system properly
When storm water tank is filled by water depending on the usage of the room, the operation time and the size of the space.
(WELL v2 W02)Part.2
Manhole with an ・ The office, meeting room, training room, dining room, etc. adopt a VRF system (VRV * 1) using a small cassette type indoor
a. Styrene less than 0.02 mg/L. overflow function unit.
b. Benzene less than 0.005 mg/L. Storm water on Storm water Storm water The last manhole ・ The entrance, hall and solution plaza (showroom) adopt single duct valuable air volume system (VAV).
the basement on the ground on the roof on the site
c. Ethylbenzene less than 0.3 mg/L. ・ The contact center (call center) adopts VRF system (VRV * 1) using a under floor air distribution type indoor unit.

d. Vinyl chloride less than 0.002 mg/L. To Tank 1 ・ The disaster prevention center operating 24 hours adopts the inverter single zone heat pump unit (skyair * 1).
To Tank 2,4
・ The server room adopts a refrigerant cooling system dedicated to the computer room using a under floor air distribution type
e. Toluene less than 0.7 mg/L.
indoor unit.
f. Xylenes (total: m, p and o) less than 0.5 mg/L. From Tank 2,4 to Tank 3 Water
Drain pipe ・ Air conditioning unit shall be suppllied by client,Daikin
g. Tetrachloroethylene less than 0.005 mg/L Drainage pipe ・ The air conditioning and ventilation system does not use a CFC refrigerant. The refrigerant type is as follows :
(WELL v2 W02)Part.3
for emergency Turbo Chiller :HFC-R1234ze

a. Total trihalomethanes (sum of dibromochloromethane, bromodichloromethane, chloroform and bromoform)


close Air Cooled Heat Pump Chiller :HFC-R32
RUN
move VRF
less than 0.08 mg/L.

b. Total haloacetic acids (sum of chloroacetic, dichloracetic, trichloracetic, bromoacetic and dibromoacetic acids)
Shut off motorized Border line of - VRV :HFC-R410A(TBD)
valve for emergency Building outline
(knife gate valve ) this site
less than 0.06 mg/L. - skyair :HFC-R32

(WELL v2 W02)Part.4 1.2.5. Sanitary Equipment Selection * 1: Indicates the name of Daikin's product.
a. Atrazine less than 0.003 mg/L.
・ For faucets, toilet bowls, etc., for saving water, adopt those conforming to the EPA standard criteria (LEED). 2.2.2 ventilation system
b. Simazine less than 0.002 mg/L.
・ The water consumption standard conditions for each equipment shall be as follows: ・ Efficency grade of Fans with a capacity 5HP as speecified in part 3 – Item 2.2.3 in QCVN 09-2017/BXD
c. 2,4-Dichlorophenoxyacetic acid less than 0.07 mg/L.
・ Ventilation in the occupied room is divided between individual DOAS (using refrigerant) and centralized DOAS (using cold water)
(WELL v2 W02)Part.5 Maximum installed flush or flow rates for prescriptive path depending on room use, operation time and space size.
Maximum installed Maximum installed Threshold below
a. Nitrate less than 50 mg/L (11 mg/L as nitrogen). Fixture or fitting ・ A centralized DOAS controls the air volume by the concentration of CO2 in each room. The maximum air flow volume of the air
flush or flow rate (IP) flush or flow rate (SI) code baseline conditioner is determined from the operating rate of the entire building.
(WELL v2 W02)Part.6
Toilet (water closet)* 1.28 gpf** 4.8 lpf** 20% ・ In consideration of the use of Daikin products as a showroom, Heat Pump Desiccant Humidity Control Outdoor Air Unit (Desica
a. Fluoride less than 4 mg/L. * 1), Heat Reclaim Ventilator with DX-Coil (VKMP * 1), Outdoor-Air Either Processing Unit (MF * 1) or Heat Reclaim Ventilator
Urinal* 0.50 gpf 1.9 lpf 50%
b. Chlorine less than 4 mg/L. (VAM * 1) is used as the individual DOAS.
Public lavatory (restroom) faucet 0.40 gpm 1.5 lpm 20%
・ Part of the outside air supplied to the living room passes through the corridor and is exhausted to the outside as exhaust
c. Chloramine less than 4 mg/L. Private lavatory faucets* 1.50 gpm 5.7 lpm 32% air in the toilet. The remainder is carried to the electric room and cascaded for cooling the device heat.
(WELL v2 W04)Part.1 Kitchen faucet 1.75 gpm 6.7 lpm 20% ・ To supply good quality air into the building, MERV16 compatible filters to be used on air supplied from the roof. (WELL)
a. Aluminum between 0.05 and 0.2 mg/L. Showerhead* 2.00 gpm 7.6 lpm 20% ・ The amount of ventilation should be increased by 30% from ASHRAE 62.1-2010 to acquire LEED, and the ventilation volume to achieve
900 ppm of CO2 in rooms requiring response.(WELL)
b. Chloride less than 250 mg/L.
・ The underground parking to use mechanical ventilation (air change rate; 6times/h) with air supply and exhaust fans, energy
c. Fluoride less than 2 mg/L. saving is aimed at by controlling CO concentration. The exhaust fan is to be used as a smoke exhaust fan.
**The average flush rate for dual-flush toilets must be calculated as the average flush volume of one full flush and two reduced
flushes, using a 1:2 (high flush:low flush) ratio. ・ * 1: Indicates the name of Daikin's product.

gpf = gallons per flush gpm = gallons per minute lpf = liters per flush lpm = liters per minute
Reference : LEED v4 REFERENCE GUIDE FOR BUILDING DESIGN AND CONSTRUCTION.

1.3. Calculation sheet


Please refer to calculation set
2.2.3. Chiller Systems  system efficiency.
・The heat source is selected depending on the application of the room, the operation time and the size of the space, and selectively
uses an individual heat source system (using a refrigerant) and a centralized heat source system (using a cold water).
 The basic functions to be as follows:
・The centralized heat source system consists of a turbo chiller and an air-cooled heat pump chiller. The outlet temperature
 Basic functions such as operation, control, monitoring and display of various equipment
of the turbo chiller is 12 ° C, and the indoor sensible heat load and the primary load (mainly sensible heat load) of the
outside air treatment are processed. The air-cooled heat pump processes the secondary load (mainly the latent heat load) of  Control functions such as time schedule control, power failure control, power demand control (Demand response control), generator
the outside air processing load.
demand control, fire interlock stop and control for forgetting to turn-off prevention.
・Use variable flow rate control of cooling water and cold water to save energy.  Display of daily reports, monthly reports, trends, alarm history, etc. / Data management functions such as CSV or Excel output
・The individual heat source system uses VRV, Skyair, a package for computer room, etc. and charge calculation.

・The COP and IPLV of each heat source equipment need to exceed the standard efficiency of ASHRAE 90.1-2010.  The monitoring terminal of the BMS to be installed in the B1F Fire Command Center and 4F Air Net Center, and the monitoring terminal

・Heat source equipment capacity of the BEMS to be installed in the 4F Air Net Center. The servers are consolidated in the 6F Server Room of 6F.

 Use the Local LAN in the building to enable monitoring and operation of equipment from user PC, tablet, Smart Phone, etc.(The range
- Turbo Chiller : 150 USRT × 1unit
of monitoring and operation depends on future adjustment.)Also, it shall have Internet Web Access function.
- Air Cooled Heat Pump Chiller : 42.6 USRT × 4unit
 It is assumed that various energy consumption data etc. can be displayed on the WEB browser based on the data collected by central
2.2.4. Cooling System – Critical
monitoring.
Following room to be adopted individual air conditioning system shall be installed another 1 air conditioner for backup in case of accident.
 1F Solution Plaza will visualize the details of the indoor environment and the effect of energy saving technology based on measured

AREA - SERV ER ROOM ISP ROOM LVMDV ROOM


SWITCHGEAR ROOM UPS ROOM TRANS ROOM TRANS ROOM data.

Laod - Cooling Cooling Cooling Cooling Cooling  Special graphics system shall be provided by client .Signal output to special is scope of work

Place - 6F B1F
12F 6F
12F 12F 12F
3.2 Building Automation System

Cooling LOAD 166


 A control system that communicates with Building Management System (BMS), collects and records energy consumption data, room temperature
kW 15
40 40 55 10
<full load in future> <260>
data, etc. and can perform energy management and monitoring.
Air Cooled Package Air Cooled Package Air Cooled Package Air Cooled Packa ge Air Cooled Package Air Cooled Package  Configure with computer software and hardware, operator input / output device, control unit, local area network (LAN), sensor, control
Cooling equipment - Air Conditioner Air Conditioner Air Conditioner Air Conditioner Air Conditioner Air Conditioner
(separated type ) ( separated type) (separat ed type) (separated type ) ( separated type) (separated type)
device and actuator.

Unit capacity kW/unit 47.5 25 25 25 10  A control system consisting of thermostat, control valve, damper and operator, instruction device, interface device and other equipment ・LEED Requirements

Quantity 4 and accessories necessary for operation of the mechanical system that performes specified functions. Irrigation. : 100% of irrigation water consumption is metered (M7,M10,M12,M13)
unit 2 2 3 1
<full load in future> <6>
 Monitor the outside air according to LEED requirements (IEQ credit 1).
Stand by unit 1 1 1 1 1 Meter water systems serving at least 80% of the irrigated landscaped area. Calculate the percentage of irrigated landscape area served
3.3 Monitoring Items of Equipment
as the total metered irrigated landscape area divided by the total irrigated landscape area. Landscape areas fully covered with xeriscaping
Unit capacity Quantity 25% ×( 4+1)
- 50%×(2+1) 50%×(2+1) 33% ×( 3+1) 100%×(1+1)  Monitoring item of receiving and transforming system
<full load in future> <17%×( 6+1) > or native vegetation that requires no routine irrigation may be excluded from the calculation.
Fire fighting - N2 N2 N2 N2 N2
・ Measuring / Weighing:
Indoor plumbing fixtures and fittings. : 100% of the indoor fixtures and fitting water consumption is metered (M6,M8-M10,M11-M12-M13)
Voltage, Current, Frequency, Power, Factor and Energy of receiving electricity
Remark - *1 *1 *1 *1 *1 *1
*2 Voltage, Current, Frequency, Power, Factor and Energy of secondary side of transformer Meter water systems serving at least 80% of the indoor fixtures and fitting described in WE Prerequisite Indoor Water Use Reduction, either

Current, Power and Energy of each feeder directly or by deducting all other measured water use from the measured total water consumption of the building and grounds.
*1 Requirement for cooling load is not cleard. Need to reexamine in the DD stage.
*2 PAC 2 sets will be installed in future. ・ Alerm : Various relays, devices Domestic hot water. : Each water heater inlet is metered (M16 *15sets)
2.2.5 Calculation sheet ・ Condition : Various switches
Meter water use of at least 80% of the installed domestic hot water heating capacity(including both tanks and on-demand heaters).
Please see attached file  Monitoring item of generator system

・ Measuring / Weighing: Generated voltage, current, frequency, power, power factor, operating time Boiler : Nothing
3. Building management system design principle (To be updated at For Con (upper floor)) ・ Oil amount in Oil Tank Reclaimed water. : metered (M4,M5,M15)
3.1Building Management System ・ Alerm : Various relays, generators(minor, mid, major failure)
 Install BMS for the purposes of labor saving, energy saving and safety&confort securing such as monitoring and management of building Meter reclaimed water, regardless of rate. A reclaimed water system with a makeup water connection must also be metered so that the true
・ Oil transfer pump, return oil pump, service tank full / oil reduction, oil tank oil reduction
reclaimed water component can be determined.
equipment, grasp of energy use, management of efficient operation status of equipment and monitoring and management of indoor ・ Condition : Generator body, each switch, oiling pump, return oil pump
and outdoor environment.  Monitor items of UPS system Other process water. Nothing

 The following evaluation items of LEED certification shall satisfy the standard ・ Measuring / Weighing: Voltage, current, frequency, power, electric energy, power factor Meter at least 80% of expected daily water consumption for process end uses, such as humidification systems, dishwashers, clothes washers,
LEED EA:Fundamental Commissioning and Verification,Enhanced Commissioning,Demand Response ・ Alerm : Various relays, Trip of each switch, UPS (minor/major failure)
pools, and other subsystems using process water.
Building-Level Energy Metering,Advanced Energy Metering ・ Condition : Various UPS, various switches
3.4.2 Metering Strategy of HVAC
 Monitoring item of solar power generation system
System Configuration (To be updated at For Con (upper floor)) Measure the amount of received power, amount of energy consumed for each application, amount of electricity by consumer
・ Measuring / Weighing: Generated power, generated volume, solar radiation, ambient temperature
(heat source, heat source auxiliary machine, water conveying, air conveying, ventilation, lighting, socket, sanitary

equipment, elevator,and
・ Alerm : Various relays, devices (PCS)

・ Condition : Various switches, PCS  others) and solar power generation amount.

 Monitoring item of LV boards  The central heat source to measure the power meter and calorimetry so that the efficiency (COP) of the heat source equipment and

・ Measuring / Weighing: Energy volume the air conditioning water conveying efficiency (WTF) can be measured.

・ Alerm : Various boards(2 types: Minor failure and major failure)  The pulse rate of the power metering is set to 0.1 kWh / Pulse, and the measurement interval is set to 15 min.

・ ※Minor failure: leakage, inverter malfunction, Majoir failure: Trip/inverter failure  A systematic diagram relating to power metering is shown below:

・ Condition : Various electromagnetic contactor

 Monitoring item of water tank


Power receiving Central
Heat Source
・ Measuring / Weighing: Various receiving tank water volume, rainwater storage amount

・ Alerm : Coo ling tower

Full water alarm of various drain tanks, full water / water reduction warning of various receiving tanks
Water conveyance each equipment
 Monitoring item of other systems

・ Measuring / Weighing:
Plumbin g equipment ・・・Water supply pump・ drainage pump
Outside temperature / humidity, indoor temperature / humidity, indoor CO 2 concentration, parking lot CO concentration

・ Alerm : Elevator
 Perform duplication for ensuring the system security server redundancy. The lower system management lines to be also separated Filter clogging
and self-contained distributed system. Detection of drainage leakage of server room, electric room etc./ Temperature abnormality warning Air Conditioning

① iTM(Intelligent Touch Manager) EPS internal temperature alarm, Fire representative signal, Floor fire representative signal
Ventilation
Monitoring and control of PAC and DESICA Fuming fan & fire pump start signal, Elevator malfunction
② Central Heat Source System ・ Condition : VAV, CAV, Damper Lighting ・・・Each floor
Monitoring and control of the central heat source and surrounding auxiliary machinery  Interlocking with other systems(BACnet Interlocking)
③ Equipment Monitoring System ・ Security System ⇔ Central Monitoring System:Based on each room security guard “Set” state signal from the card reader, stop Socket outlet ・・・Each floor

Monitoring and control of HVAC, pump, fan, distribution board and water tank etc. the area air conditioning
Other
④ Power Source Equipment Monitoring / Information Monitoring System ・ Security System ⇔ Lighting Control System:Based on each room security guard “Set” state signal from the card reader, stop
Monitoring and control of receiving&transforming equipment, UPS, solar power and fire information. the area lighting 1F Cafe

⑤ Measurement and Weighting Monitoring System ・ Security System ⇔ Blind Control System:Based on each room security guard “Set” state signal from the card reader, close the
Collect information on measuring instruments and sensors. area blind 1~2F
・・・Solutio n Plaza Equipment
Solution P laza
 The communication protocol of the higher-level monitoring system to be BACnet, which will be linked with monitoring and control 3.4 Metering Strategy
devices such as the entry control device, the lighting control device, and the blind control device.  Measure water supply, electric energy, calorie, wind volume etc. according to the following policy: 6F Server room ・・・Server Equipment

Introduce BEMS with energy analysis management function and facility management function in the framework of BMS.
 Consumption volume by main consumer and usage(Office, Hall, Solution, etc.)
Regarding the main facility system, it is assumed that the system performance can be confirmed by evaluating the system Power metering system diagram

efficiency. Be able to grasp the breakdown of major energy consumption by purpose to confirm the validity by analyzing  Comsumption volume by main equipment(Heat source, air conveyance, water conveying, etc.)

the tendency of consumption characteristics. As for the main facility system, it is assumed that the system performance ・LEED Requirements
 Varification of COP, WTF and ATF
can be confirmed by evaluating the Install advanced energy metering for the following:
 Weigh consumption volume of each designated area and store it in the Energy Management System server. ·all whole-building energy sources used by the building;

·any individual energy end uses that represent 10% or more of the total annual consumption of the building.
3.4.1 Metering Strategy of plumbing
The advanced energy metering must have the following characteristics.:
[1] Water for human touch consumption (M1)
·Meters must be permanently installed, record at intervals of one hour or less, and transmit data to a remote
[2] Flushing water consumption (M11)
location.
[3] Irrigation water consumption (M12+13)
·Electricity meters must record both consumption and demand. Whole-building electricity meters should
[4] Cooling tower water consumption (M14)
record the power factor, if appropriate.
[5] City Water Incoming (M1+2+3+14)
·The data collection system must use a local area network, building automation system, wireless network, or
[6] Recycled water production (for flushing) (M4)
comparable communication infrastructure.
[7] Recycled water production (for irrigation) (M5)
·The system must be capable of storing all meter data for at least 36 months.
[8] Recycled water production (from storm water) (M15)
·The data must be remotely accessible.
[9] Hot water consumption (Each water heater inlet) (total 15 sets: M16)
·All meters in the system must be capable of reporting hourly, daily, monthly, and annual energy use.
4.FIRE FIGHTING SYSTEM - The calculation of the amount of fire extinguishing water is calculated for the largest fire fighting areas.
4.1 Requirement for Design The amount of fire fighting water is determined on the basis of accumulating the curing water volume of each 4. Implement indoor air distribution
type of largest fire fighting system (basement area). Is arranged as follows:
Requirement
- Fire-fighting reserve water is located in the basement area: 604 m3 ・ 1.Adopt dedicated outside air treatment system and comply with local codes / standards.
Based on the nature of use and danger of fire and explosion of works, the fire protection system for the project
must ensure the following requirements: - Roof water tank is located on 12F: 21m3
⇒Not Adopt
Fire Protection requirement - Total tank capacity: 625m3

The fire fighting equipment of the project must ensure the following requirements: - For Sprinkler system: Msp = 0,24x240x(1.083)x3,6 = 226 m3. ・ A08. Air Quality Monitoring And Awareness
- Fire fighting equipment must be ready in standing mode, when a fire occurs, it must be extinguished - For Fire Hydrant system: Mvt = 5x2x(1.083)x3,6 = 39 m3.
immediately 1.Implement indoor air monitors
- For Fire Hydrant outdoor: Mnn = 30x1x3x3,6 = 324 m3.
- Fire fighting equipment must be suitable and effective fire extinguisher for fires that may occur in
- For Drencher system: = Mdr 10x1x1x3.6 = 36 m3. ・ Measure intervals of no longer than 10 minutes for PM and CO2 and no longer than one hour for TVOCs and report.
the building.
Pump Selection :
- Fire fighting equipment equipped for construction must be easy to use, suitable for works and conditions
in Vietnam. + Capacity : ・ Data are analyzed for regularly occupied hours and submitted annually through WELL Online.
3
- Fire-fighting equipment must be a fire-fighting device that does not damage other tools and equipment in Q = 387 m /h, H = 125m
fire-fighting areas causing secondary damage. + Jockey Pump : 2.Promare air quality awareness

a. Sprinkler Fire Hydrant system. Q = 9 m3/h, H = 135m


Principle of fire fighting system ・ Monitors are recalibrated or replaced annually, with documentation attesting to their calibration or
- This is a fire extinguishing system that is widely applied in the world at the same time implementing two basic
functions of automatic fire fighting and fire fighting. a. Pump system and operating principle replacement submitted annually through WELL Online.⇒Adopt and implement
- - The system must be designed to comply with TCVN7336: 2003 "Fire protection - Automatic Sprinkler system - + Operation:
Design and installation requirements". Automatic fire extinguishing ability by automatic sprinkler nozzles. ⇒Adopt and implement.
Automatic fire-fighting function when the temperature at the protection area reaches the working threshold Việc c ấp nước và tạo áp cho mỗi h ệ thống chữ a cháy bằng tổ hợp bơm có c ấu t ạo nh ư sau:
of the Sprinkler nozzles without human impact. + 01 Electric Pump - Duty. ・ A12.Air Filtration
- - Wall and throat fire fighting system with layout distance according to QCVN06 or TCVN2622: 1995 "Fire + 01 Electric Pump - Standby.
prevention and fire fighting for houses and buildings - Design requirements" This is the basic fire fighting
+ 01 Jockey Pump 1. Implement particle filtration
system required for public works. Present process and highly effective firefighting for indoor areas. However,
the fire fighting function is only implemented when there are human impacts. Including indoor fire hydrants
- The start-up and shut-off of the pump can be completely automatic or manual. Pump in automatic mode through
to ensure that the flow of each throat is not less than 2.5l / s per throat, the pressure column is not less ・ Adopt MERV 16 or higher filter for outside air treatment system(Annual average outdoor PM2.5 threshold :
pressure switches.
than 6m of solid water column to serve the internal fire fighting.
- Under normal working conditions, the fire fighting system can maintain hydrostatic pressure with pressure 42μ/m3
b. Fire Fighting system – N2
equivalent to the fire pressure of the system. In order to maintain regular pressure in the system, there must
- Special areas that do not use fire fighting with water, based on TCVN 5760, determine suitable fire according be pressure compensation pump and pressure vessel. Pressure compensation pumps only work when the system's ・ Filter is equipped with on-board pressure sensors
to each special fire. maintenance pressure drops due to pipeline leakage, simplifying the pipe due to the temperature and air bubbles
in the system. The automatic booster pump runs within its own set pressure range and has a minimum runtime
- The layout and design of the system complies with current standards. control relay attached to the control system to prevent the pump being pumped from continuously.
Evidence that the filter has been replaced according to manufacturer's recommendation is submitted
c. Fire exstinguisher - Fire pump will be started when the pressure in the system drops to the setting level. When the main fire
pump is started pressure in the system still falls down because the pump is not running or the pump runs without annually through WELL Online.
- In addition to the two fire fighting systems on the project, it must also be equipped with portable, portable
fire extinguishers for extinguishing newly arising fire, not enough parameters for automatic fire-fighting water, the system automatically starts up the spare pump.
system to work. - In manual mode, it is possible to start at pump control cabinet. ⇒Adopt
- The arrangement and type, quantity must be complied with TCVN 7435-1: 2004 (ISO 11602-1) and TCVN 3890: 2009. - Power supply to the pump is taken from the priority source (front of the total breaker), and is supplied
by the generator's power source via the ATS automatic power adapter. ・ A13. Active VOC control
4.2 Description system

Fire fighting system – Wet system - The status of the pump is always updated and indicated by the fire alarm center is that the pump is active
or inactive. 1.Implement carbon filtration
System inculed :
b. Piping system :
+ Sprinkler system ・ utilize one of the below to remove VOCs from indoor air:
- All fire-fighting pipes used in systems with diameter> 100mm are medium thickness steel pipes according to
+ Fire hydrant system. ASTM standards.
Activated carbon filters or a combination of particulate/carbon filters in the main air ducts to filter
+ Drencher system. - - The entire network of fire-fighting pipes used in ≤100mm diameter system is a medium thickness steel pipe
according to BS class M standard. recirculated air.
Initial fire extinguisher facilities:

- Initial fire extinguisher using ABC:4 kgs, CO2: 3kg and ABC: 35kg trolley for parking area - - For pipes with a diameter of DN80 or higher, a black steel pipe or galvanized steel pipe can be used and
A standalone air-cleaning device that utilizes a carbon filter to treat the air⇒Adopt ceiling-filled cassette
Sprinkler system : welding bonding is used.
with streamer deodorizing unit
Automatic fire extinguishing ability by automatic sprinkler nozzles. Auto-fire function when the temperature at - - For pipes with diameters of D65 or below, galvanized steel pipes and threaded connections must be used.
the protection area reaches the working threshold of the nozzle.
⇒Not Adopt (TBD).
Sprinkler method distribution: - not less than 14 kg / cm2. The pressure drop on the pipe is not more than 5% compared to the test pressure
after 2 hours of pressure, not pumping more water into the pipe.

- - Fire-fighting water supply hose is floating on the color of the finish paint must be red in fire and must ・ A14.Micrrobe And Mold Control
- Fire extinguishing system uses upwards sprinkler heads installed for basement parking lots and in locations where
be painted at least 3 layers.
there is no false ceiling. Downward sprinkler heads are installed for areas without false ceilings such as lobbies,
1.use ultraviolet lamps to irradiate the surfaces of the cooling coils and drain pans of the mechanical system
corridors, function rooms, offices. The distance between the nozzles is 2.8 - 4 m, the distance to the wall is - - Underground buried pipes must be paved with molten bitumen with a minimum thickness of 2 mm.
supplies.
1 - 2m (Design drawing) - - Before painting, must remove all oil, grease, dust and most of steel scales, rust, paint, foreign impurities,
remaining contaminants adhere very tightly to steel surface.
- Areas with an environmental temperature of <400C arranged spray nozzles with working temperature of 68°C. (office ⇒Not Adopt
N2 - System
area …)
- According to the characteristics and nature of the protection target of the electrical engineering department
- Areas with ambient temperature t <61°C, layout nozzles with working temperature 93°C. in the project, for fire fighting suitable for the type of fire for the area, we choose the fire extinguisher
as N2 gas.
* Spray intensity by region: ・ T07.Humidity control
- Applying Vietnam Standard TCVN 7161-1: 2009; ISO 14520-1: 2006 (Gas fire extinguishing system - physical
properties and system design) and Vietnam Standards TCVN 7161-13: 2009; ISO 14520-13: 2006 (Gas fire
- Parking area of basement 1, basement 2, belongs to the average fire risk of Group II: extinguishing system - physical properties and system design) - Part 13: IG-100 fire extinguisher (N2). ・ A ventilation system capable of maintaining the relative humidity constantly at 30% to 60% by humidifying

Ib: Injection inteisty: 0,24l/m2.s General Requirement or dehumidifying air.

In order to ensure the system operates efficiently and accurately, the contractor will design details, provide
FV: Area is protected by 1 sprinkler: 12 m2 ⇒Adopt
equipment, install and calibrate the system according to the requirements of the project.
F: Area for calculation: 240 m2. - System synchronization: The entire system must be provided by a manufacturer including: fire alarm system,
fire control system and N2 system. The submitted documents must show the permission to work between product ・ W01. Fundamental Water Quality、
Time for calculation 60 + 5 minute. models of fire alarm control system and N2 system.
- Construction detailed drawings (shop drawing): Installation unit will prepare construction design drawings ・ (WELL v2 W01)Part.1
Capcity for Sprinkler: MSP = 0,24x240x(1.083)x3,6 = 226 m3.
according to the actual size of the site. The design will specify the number, location and code of devices
in the system. In addition, the design also shows the diagram of the gas pipeline. Turbidity less than or equal to 1.0 NTU
- The remaining area of the construction is in the average fire risk group 1:
- Checking the system, Training the operation and acceptance instructions: After the installation is completed,
Ib: Injection inteisty: 0,12 l/m2.s there will be a working session between the contractor and the investor. The Contractor will introduce to the ・ (WELL v2 W01)Part.2
Investor's staff the system's equipment, functions and operating procedures. The contractor will conduct system
FV: Area is protected by 1 sprinkler: 12 m2 testing.
Contains 0 CFU / 100 mL total coliforms (including E. coli).
F: Area for calculation : 240 m2. - System maintenance: System maintenance agreement will be submitted by the contractor to the Investor, however,
this agreement may be accepted or not. However, the Contractor must submit to the Investor all documents of
procedures to guide the maintenance of the system. ⇒Adopt
Time for calculation 60 + 5 minute
- Applying Vietnam Standard TCVN 7161-1: 2009; ISO 14520-1: 2006 (Gas fire extinguishing system - physical
Capcity for Sprinkler: MSP = 0,12x240x(1.083)x3,6 = 113 m3. properties and system design) and Vietnam Standards TCVN 7161-13: 2009; ISO 14520-13: 2006 (Gas fire ・ W02. Water contaminants shall be implemented by gallon tank (out of scope)
extinguishing system - physical properties and system design) - Part 13: IG-100 fire extinguisher (N2).
Fire Hydrant system ・ SO2. Maximum noise levels
Fire Extinguisher
-This is the basic fire fighting system that is required for the current works by the roll of hose, spray nozzle - According to the characteristics and nature of the protection target of the project, for fire fighting suitable
for the type of fire for each floor, we selected the initial fire extinguisher as 4kg ABC synthetic chemical powder 1. Limit background noise levels
combined with fixed fire fighting and highly effective fire fighting ability. . However, fire fighting function
and fire extinguisher CO2 - type 3 kg. The pots are arranged for the floors shown on the drawing. Fire extinguishers
is only performed when there are people. are placed in the edge of the fire hydrant and together with the fire hydrant box.
Required average sound power level
-Calculated with two simultaneous fire hydrants.
5. pecification for WELL Certification
- Velocity for 1 nozzole: 5.0 l/s. (For Garage area) Open workspaces, dining areas : dBA 55 ,dBC 80
Major equipment specifications (excerpts) for acquiring WELL are as follows:
- pressure at nozzole: 2,5 at (25 m.c.n)
Endorsed offices: dBA 50 ,dBC 75
・ A03. Ventilation Effectiveness
-The radius of each throat ensures that at any point in the building there must be two spray nozzles
1.Ensure adequate ventilation Conference rooms: dBA 45 ,dBC 70
- Fire hydrants are arranged inside the house next to the entrance, stairs, hallways, easy to see, easy to use.
The throat is designed to ensure that any point of the construction is also extended. The throat is located The ventilation rate complies with all the requirements specified in ASHRAE 62.1 - 2010 (ventilation rate method
⇒Will comply
or IAQ method).
at 1.25 meters above the floor. Each water throat is equipped with a rubber roll of D50mm diameter 20m in length
and a nozzle, joints, flow rate of 2.5l / s and pressure of the throat to ensure a special water column height> ・ T02. Enhanced Thermal Performance
Perform test and balance adjustment of the HVAC system between substantial completion and move-in.
= 6m . Based on the actual architecture of the project, we will ensure that the fires in any area in the building
⇒Adopt and implement 1. Enhanced Thermal Environment
are sprayed with water, the radius of operation is 26m.

・ A06. Enhanced ventilation.


Calculate reserve water and pump selection During all standard occupied hours of the year, all regularly occupied spaces achieve thermal conditions
Reserve Water 1. Increase outdoor air supply representing Predicted Mean Vote (PMV) levels within +/- 0.5; PPD ≤ 10% (as per ASHRAE 55-2013, ISO

・ 30% higher than the ASHRAE 62.1-2010 supply achieved by WELL's "Efficient ventilation" evaluation item.
7730:2005 or EN 15251:2007).[1,33,34]

⇒Adopt ⇒TBD

2.Implement demand controlled ventilation


・ V12. Self-Monitoring
・ CO2 concentration in all regularly occupied spaces 900 ppm or less.
1.provide self-monitoring tools

⇒Not adopt