Lesson: Quarter 2 Week 6 LAS 2
Activity Title: The propose Fishpond site
Learning Target: Use signs and symbols of plan according to fishpond engineering standards.
References: MELC, TLE 7
LAS Writer: Manal J. Abubakar
The proposed fishpond site is thoroughly examined and selected based on the required
factors for pond selection. The following are the different compartment units, and the common
accessories of the pond systems which are to be considered in making the layout plan.
Layout - is the plan or design of something laid out.

Figure 2. Fishpond Layout


Legend:
NP - Nursery Pond MD - Main Dike
TP - Transition Pond SD - Secondary Dike
RP - Rearing Pond TD - Tertiary Dike
HP - Head Pond MG - Main Gate
BP - Breeding Pond SG - Secondary Gate
CP - Catching Pond TG - Tertiary Gate
WSC - Water Supply Canal

Directions: Label the fishpond layout. Write your answer in your Aquaculture activity notebook. (10pts)