CoilHose Well Intervention

Stian Steinsholm
Region Product Line Manager | CoilHose

stian.steinsholm@exprogroup.com
Mobile:+60 1925 25798
CoilHose Light Well Circulation System | Introduction
The CoilHose Light Well Circulation System (LWCS) is an innovative development
providing a lower cost and more efficient alternative to traditional coiled tubing
systems.

Features: Sidetrack
Snubbing or P&A
• Small OD Flexible Hose or Workover
Coiled
Tubing
• Integrated Wireline and Coiled Tubing

• Gravity feed system


CoilHose
• No injector or goose neck
Wireline • Scale, asphaltene and wax removal
• Well unloading
• Skin remediation
• Deployment of memory logging tools
• In development – cement pumping

Specifications ¾” CoilHose 1” CoilHose Cumulative production loss, time, heavy lifts, POB, planning, risk etc.

Outer diameter 19.5 mm 22.6 mm

Inner diameter 9.8 mm 12.9 mm


Applications: • Benefits:
Breaking strength 14 330 lbf 14 330 lbf • Scale, asphaltene and wax removal • Light, compact and efficient footprint
• Well unloading • Reduces overall cost of intervention
Burst pressure limit 50 000 psi 40 000 psi
• Well circulation • Mobile and flexible set-up
Collapse pressure 4 670 psi 3 800 psi • Skin remediation • Lower number of personnel required
• Deployment of memory logging tools (3-4 multi-skilled crew)
Working pressure 12 500 psi 12 500 psi • In development – cement pumping • Rapid deployment capability

Temperature rating -40ºC to 150ºC -40ºC to 150ºC


3
CoilHose Light Well Circulation System | Rig-Up Overview
Dual Side Door Stripper

▪ Pressure Control Equipment Tool Catcher

X-over

• Standard Wireline PCE


Lubricator

• Customized Pressure Control Head

• Customized BOP Inserts Quick Test Sub

▪ Dry Wellhead and Subsea Capability


Triple BOP

▪ Footprint

• Similar as Wireline Lubricator

• Circulation Package

XMT X-over

4
CoilHose | Rig-Up Overview

Subsea Operations

Stripper

5
CoilHose Pressure Control Equipment
Dual Side Door Stripper
Dual Side Door Stripper & BOP
Tool Catcher

X-over

• The pressure control head of the CoilHose is a


dual side door stripper system rated to 10,000 Lubricator

psi working pressure

• Rubber that seals around other layer of the Quick Test Sub
CoilHose

• The BOP used in CoilHose operations is


Triple BOP
standard proven wireline triple BOP’s

• To fit the requirements for the CoilHose, special


purpose built inner rams is used Shear/Blind Lubricator

• The BOP configuration follows the same Pipe/Grab


principle as Coiled Tubing with shear/seal on top,
followed by two sets of pipe/grab
Pipe/Grab XMT X-over

6
CoilHose Light Well Circulation System

Bottom Hole Assembly

• Hose End Connector

• Dual Flapper Check Valve

• Straight Pull Disconnect

• Weight Bars

• Turbine

• Swivel

• Nozzles

7
CoilHose Light Well Circulation System

Fluid Applications

• Fluid Circulation

• High Pressure Jetting

• Acid / Chemical

• 0 – 800 Bar Injection Pressure

• High Pressure Drop Across Nozzle

• Customized BHA setup

8
CoilHose Light Well Circulation System

Nitrogen Applications
• Well Unloading

• Well Kick-Off

• Liquid N2 Converter Pump

• Pre-charged Nitrogen Racks

• Nitrogen Membrane Unit

9
CoilHose Light Well Circulation System

CoilHose Main Equipment

CoilHose Deployment Units


• Container based system
• Control Cabin w/power pack & single drum winch

1. CoilHose Unit with capacity of up to 3000 meter of our 1” CoilHose


2. CoilHose Unit with capacity of up to 1200 meter of our ¾” CoilHose

Fluid Pump and Nitrogen Converter


• Pumping Capacity Fluid Pump
• 12.5gpm / 50lpm
• Pumping Capacity Nitrogen Pump
• 45,000 scf/hrs

11
CoilHose | Pressure Control Equipment

Various Equipment

BOP Transport Skid


• Weight: 3,600 kg
• Dimensions: 2000 x 2000 x 2580 mm

PCE Control Panel


• Weight: 1,650 kg
• Dimensions: 2000 x 2000 x 2580 mm

PCE Transport Skid


• Weight: 4,500 kg
• Dimensions: 4510 x 1700 x 1510 mm

Drum box with backup CoilHose


• Dimensions: 2.2M X 1.9M X 1.95M
• Transport weight: 6 500 kg

Tool Container / Workshop


• Dimensions: 3.0M X 2.44M X 2.44M
• Transport weight: 5 500 kg
12
Expro CoilHose Case Study #1

Unloading Of Two Exploration Wells Prior To Well Test

Expro’s CoilHose Customer Challenge Value to Customer


technology provides a • Well unloading of two exploration • Unloading of two exploration
cost efficient and time wells was required prior to a well wells within 48 hours prior to
test operation well test
saving solution for well
• The customer had planned both • Due to the footprint of the
unloading operations exploration wells to be unloaded equipment, spotting and
prior to starting well test program preparation is done off critical rig
time and in parallel with ongoing
• A full well test package and operation
slickline equipment limits the
available space onboard • Operational and critical rig time
was significantly reduced as the
Expro Solution rig-up time is quick and similar to
slickline
• Expro proposed our new
CoilHose service as a • Moving between wells is
replacement for Coiled Tubing to achieved within hours as the
unload the wells using nitrogen PCE is small and can be stored
injection on rig floor while skidding to new
well
• CoilHose offers a rapidly quick
rigging time compared to CTU
which was key when planning to
move between two wells

• CoilHose was selected by the


client as the preferred solution
over Coiled Tubing based on it’s
cost saving and track record

13
CoilHose Case Study #1 - Problem

Re-activation of Failed Down Hole Safety Valve Solutions

Broach & Brush Dump Acid CoilHose & Acid

Caliper report after 2 weeks of continuous broaching


• Well closed in due to failure
of the down hole safety 7.5% 7.5%

valve. Not able to achieve


an inflow test
+
• Scale build up from below
DHSV to surface
• Normal approach to solve this type of scale problems is with
• DHSV depth: 470 mMD slickline and by the use of broach and brush.
• Over 1.7 m3 of carbonate • In some cases dumping of acid can be considered.
scale
• The client tried broaching for 14 weeks without any progress,
• 7” top section reaching a depth just below the hanger area in the 7” section. The
caliper report shows the scale build up from surface down to
• 5 ½” Tubing below the down hole safety valve.

• This well has the liquid level just below the DHSV, and dumping of
• 1000 bbl/day production acid was therefore not a good solution and is highly costly due to
loss the volume needed.

• CoilHose package and HCL acid was mobilized to the rig in order
to remove the scale by high pressure jetting and dissolving.
Client Objective:
Re-instate DHSV, inflow test and
resume production

DHSV Area
14
CoilHose Case Study #1 - Result

Re-activation of Failed Down Hole Safety Valve

• 3 CoilHose runs
Caliper report after 3 days CoilHose operation
Turbo Stinger
DHSV Wash Nozzle
Multifinger caliper

• 7.5% HCL Acid


• Over 1.7 m3 of carbonate
scale
• 5 ½” Tubing
The first run in the well was Turbo Stinger Nozzle Melon Wash Nozzle
performed with the turbo stinger • Downwards pointing end • Wash tool with nozzle 90 deg.
nozzle. This opened up the hanger nozzle with internal rotating to the side. The tool is similar
area and other restrictions in the nozzle to a centralizer and comes in
top section. This also acts as a drift various sizes
to confirm minimum ID. • Combined with stinger
extension having nozzle 90 • Combined with turbine (motor
This allowed for the melon wash deg. to the side head) above to enable
nozzle to pass further down to rotation of the nozzle
DHSV area. • Small OD Tool (1” – 1.4”)

Last run was performed with a


multifinger caliper on memory to
confirm that the DHSV was free for
scale.

Inflow test was successful DHSV Area


and production resumed 15
Case Study #3 – Tubing Clean Out

Multifinger Caliper on CoilHose

Before After
• Well shut in due to scale
• Production reduced to half

• Over 1.5 m3 scale


• Ca2+ – Calcium Carbonate

• CoilHose & 7.5% HCL

• MFC & CCL confirmed clean


tubing

18
CoilHose Light Well Circulation System

Track Record

22
CoilHose Operation

Operation Planning & Simulation