Professional Documents
Culture Documents
M-AOW-3E2TS0-CAEW-EDR-192002-D-Mosque Elevations
M-AOW-3E2TS0-CAEW-EDR-192002-D-Mosque Elevations
NORTH
WEST EAST
SOUTH
(MAKKAH)
.55
4°
24
LEGEND
E-01 SOUTH ELEVATION 1:100 E-02 WEST ELEVATION 1:100
580.290 = 0.00 AMSL
-23.85 F.F.L.
29' 30' 31' 32' 33' 34' 35' Q' R' S' T' U' Elevations - mt - finishing floor level
370 3200 7325 10295 10525 370
370 6160 5400 5400 5400 4475 8545 2419 1000
Linear dimensions - mm
S-01
+15.80 F.P.L. +15.80 F.P.L. 21
Section lines - see section drawings
ROOF LEVEL M-AOW-3E2TS0-CAEW-EDR-192001
ROOF LEVEL
FINISHING TAGS
finishing code - see finishing schedule report
REN-11
M-AOW-3E2TS0-CAIF-ESH-190005
DOOR/WINDOWS TAGS
door code - see door schedule report & drawings
FD-000 M-AOW-3E2TS0-CAID-ESH-190010
M-AOW-3E2TS0-CAST-EDR-192016
+10.65 F.F.L. +10.65 F.F.L. window code - see window drawings
FW-000
MEP/CHILLER PLANT MEP/CHILLER PLANT
M-AOW-3E2TS0-CAST-EDR-192016
LEVEL LEVEL
DETAIL TAGS
2
-0 0
2
1
2
-00
D-01
-00
-00
Detail number
FW
FW
FW
FW
1
-00
1
1
2
1
-00
-00
-00
-00
-00
FW
2
FW
FW
FW
FW
FW
1
-00
See note "x" for drawing number
-00
X
FW
2
1
FW
00
-0 0
2
-
00
FW
FW
-00
-
FW
FW
1
1
1
2
-00
-00
-00
-00
-00
-00
1
2
FW
FW
FW
FW
FW
1
2
1
-00
-00
-00
-00
-00
FW
-00
-00
-00
-00
-00
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FACADE FINISHES
2
-00
FW
EWS-21
+5.25 F.F.L. +5.25 F.F.L. Engineered Stone Cladding
ref: EWS-81 (finish brushed)
FIRST FLOOR LEVEL FIRST FLOOR LEVEL
2
2
2
-00
-00
-00
-00
FW
FW
FW
FW
1
1
2
-00
-00
-00
-00
-00
EWS-81
FW
FW
FW
FW
FW
EWS-81
1
EWS-81 EWS-81 Engineered Stone Cladding
-00
2
-00
FW
FW
2
-00
EWS-21
FW
1
1
-00
-00
2
FW
FW
1
-00
-00
FW
FW
FD-007 FD-007 FD-011
Engineered Stone Cladding
ref: EWS-81 (finish bush hammered)
+1.10 F.F.L. +0.90 F.F.L.
+0.60 F.F.L. +0.59 F.F.L. +0.59 F.F.L. +0.60 F.F.L. +0.59 F.F.L. +0.59 F.F.L. +0.59 F.F.L. +0.60 F.F.L.
GROUND FLOOR LEVEL WINDOW
GROUND FLOOR LEVEL
DRS-12 DRS-12 DRS-12 ref: EWS-21
NOTES
+10.65 F.F.L. +10.65 F.F.L. 1.This drawing has to be read contemporary with structural and plant
MEP/CHILLER PLANT
design (drawings and specifications)
MEP/CHILLER PLANT
LEVEL LEVEL 2. In case of discordance between written dimensions and directly
measured, dimensions, written dimensions are always predominant.
3. In case of discordance between different design documents, more
1
1
00
-00
2
-
detailed drawings have to be predominant (in order scale 1:1, 1:5, 1:20,
FW
FW
00
1
1
1
-
FW
-00
-00
-00
1:50 etc).
1
2
FW
FW
FW
00
00
-
-
FW
FW
00
00
2
-
-
FW
FW
FW
-00
1
-00
-00
1
setting out.
-00
EWS-21
FW
FW
FW
EWS-81
5. It is the contractor and subcontractor responsibility to check all
dimensions prior to commencing any work and to satisfy themselves that
+5.25 F.F.L. EWS-81 the works comply with the architects dimensions shown in this drawing.
+5.25 F.F.L.
6. All drawings to be read in conjunction with all Architectural, MEP,
FIRST FLOOR LEVEL FIRST FLOOR LEVEL Structural stage reports.
1
00
1
2
EWS-81
-
FW
-00
-00
-00
FW
FW
00
1
2
2
-
FW
-00
-00
-00
EWS-81
FW
FW
FW
FW
2
-00
2
2
FW
-00
-00
FD-007
FW
FW
7 PROJECT
+ +
ORIGINATOR CHECK REVIEW APPROVAL
S.CITRONE M.BECKERT L.CREMONESI M.FAGGIANI
DATE SCALES ORIGINAL SIZE A0
A0= 1:100
MARCH 2018 A3=
0 250 500
SUBJECT TITLE
90% DETAILED ARCHITECTURAL DESIGN
3E 2-1F 7 DOWNTOWN STATION
MOSQUE ELEVATIONS