You are on page 1of 8

IMO 9274630

JLZ020502

GL'S COMMENTS FINAL DRAWING


OWNER COMMENTS m/t GEESTESTERN
SHIP'S NO. JLZ020502
COR.MARKS SIGN DATE
DESIGNED B^\^\ 1"^ DWG's NO. M-055-03
OILY BILGE WATER SYSTEM PAGE WEIGHT SCALE

1/7
JINGLING SHIPYARD
MARINE DESIGN COMPANY
37,300DWT PRODUCT OIL/ FAX:0086-25-58797167
CHEMICAL TANKER E-mail:jlshipyard@vip. 163.com
TOTAL AREA: 0.5 m^ AREA: 0.0625 m^
M-055-03 PAGE
OILY BILGE WATER SYSTEM
2/7

TECHNICAL REQUIREMENTS
1. ANNOTATED SIZES OF PIPES IN THE DRAWING TO BE OUTDIA. X THK.(mm).
2. ALL BILGE PIPES TO BE GALVZNIZED. (HOT DIP. TTPE)
3. THERE PIPES PENETRATE THROUGH WATER TIGHT BULKHEAD OR DECK TO BE
FITTED WITH PENETRATION PIECES ACCORDING TO CB/T3480-92 OR SHIPYARD STANDARD.
4. ALL PIPING TO BE SECURELY SUPPORTED AND BRACED.
5. PART WITH MARK * AND IN DASH DOT LINE ARE SUPPLIED TOGETHER WITH EQUIPMEN .
6. THE DETAILS ABOUT AUTOMATION SHOWN IN THE SYSTEM REFER TO LIST OF AUTO.
CONTROL MONITORING AND AU\RM POINTS FOR E / R . ( M - 0 5 4 - 3 2 )
7. PIPING TEST PRESSURE:
DESIGN PRESS. BEFORE INSTALLATION AFTER INSTALLATION
SEA WATER PIPE 0.25MPa 0.375MPa HYDROSTATIC TEST NO LEAKAGE UNDER W.P.
FRESH WATER PIPE 0.45MPa 0.675MPa HYDROSTATIC TEST NO LEAKAGE UNDER W.P.
SEPARATOR OIL PIPE 0.25MPa 0.375MPa HYDROSTATIC TEST NO LEAKAGE UNDER W.P.
BILGE PIPE 0.25MPa 0.375MPa HYDROSTATIC TEST NO LEAKAGE UNDER W.P.

PIPING SYMBOL:
SEA WATER PIPE
FRESH WATER PIPE
SEPARATOR OIL PIPE
FIRE PIPE

AREA:Q.Q625m^
OILY BILGE WATER SYETEM M-055-03 PAGE
3/7
STANDARD NO CLASS WORDS ON
JTEM NO. "NAME DN I'N MATERIAL QTY. WT DELIVERY REMARKS
OR DRAWING NO. (":F.RT. NAMEl'LATE

mm MPa kg

AS16032
BL51V STOP CHECK VALVE 32 1,6 CAST IRON 8.4 FM SEA W A T E R DUCT
GB/T591-93

AS16032
BL52V STOP VALVE 32 1.6 CAST IRON 8.6 S.W.TOSEPAR.PUMP
GBAT590-93

A S I 6032
BL53V STOP VALVE 32 1.6 CAST IRON 8.6 S.W.TO SEPARATOR
GB/T590-93

AS16032
BL54V STOP VALVE 32 1.6 CAST IRON 8.6 FM OILY BILGE TK.
GB/T590-93

A S I 6032
BL55V STOP CHECK VALVE 32 1.6 CAST IRON 8.4 F R O M E/R B.W.
GB/T591-93

BS25032 TO OVERBOARD
BL56V STOP CHECK VALVE 32 2.5 BRONZE 8.4 3.1C
GB/T588-93 DISONAR,

A40010
BL57V STOP CHECK VALVE 10 4.0 BRONZE 0.98 F.W.WASHING
GB596-83

AS25015
BL58V STOP VALVE 15 2.5 BRONZE 5.4 DRAIN
GB/T587-93

AS25015
BL59V STOP VALVE 15 2.5 BRONZE 5.4 DRAIN
GB/T587-93

A40010
BL61V STOP CHECK VALVE 10 4.0 BRONZE 1 0.98 RECIRCULATING VALVE
GB596-83

AREA:0.0625m^
OILY BILGE W A T E R SYETEM M-055-03 PAGE

4/7
STANDARl? NO. (,:LASS WCJRDS ON
ITEM NO. NAME UN }'N MATEJUAL QTY. WT. DELIVERY REMARKS
OR DRAWINU NO. CERT. N A M E PLATE

mm M)'a Kg

AS16032 T O S E P A R A T O R OIL
BL62V STOP VALVE 32 1.6 CAST IRON 1 8.6
GB/T590-93 TANK

A S I 6032
BL63V STOP VALVE 32 1.6 CAST IRON 1 8.6 T O OILY BILGE T A N K
GBAT590-93

AREA:0.0625m^
OILY BILGE WATER SYETEM M-055-03 , PAGE
5/7
STANDARD NO. CLASS WORDS ON
ITEM NO. NAMB DN I'N MATERIAL QTY. Wl'. DELIVERY RENÜ\RKS
OR DRAWING NO. CERT. NAM.E I'LA'I'E

ntm Ml'a kg

PERFORATION
BL51F SIMPLEX FILTER 32 0.2 STEEL 1
ill 2 mm
O I L Y B I L G E W A T E R SYSTEM M-055-G3 PAGE
6/7
NOM. OUT. ABOUT
NO. APPLICATIION OF PIPES THK. MATEIUAL WEIGHT REMARKS
DÍA. DIA. CLASS LENGTH
CERT.
mm mm kg

SEAMLESS HOT-DIPPED
1 BILGE PIPE 10 17 3 3 3.1 GALV. •
STEEL

SEAMLESS HOT-DIPPED
2 BILGE PIPE 15 22 4 2 3.5 GALV.
STEEL

SEAMLESS HOT-DIPPED
3 BILGE PIPE 25 34 4.5 2 6.5 GALV.
STEEL

SEAMLESS HOT-DIPPED
4 BILGE PIPE 32 42 7 25 150.1 GALV.
STEEL

SEAMLESS
5 SEPAR.OIL PIPE 32 42 7 10 60.4
STEEL

6 SEA W.PIPE 32 38 2 CuNIIOFeMn 25 50.3

SEAMLESS
7 F.W.WASHING PIPE 6 10 1 2 0.5
COPPER

SEAMLESS
8 F.W.WASHING PIPE 10 14 2 20 13.4
COPPER

SEAMLESS
9 GOMPR.AIR PIPE 6 8 1 10 2.0
COPPER

2=290

ARFA-n nñ9Rm^
MODIFICATION TO OILY BILGE WATER SYSTEM

EXAMINED

This plan has been examined and given the


status as shown in the Design Appraisal
Document (DAD) number below:
SATS/ENG/0020695

Date: 31 May 2019 Initials: TWC/SKH

Marine and Offshore


South Asia Technical Support Office
Engineering System
Lloyd's Register Singapore Pte. Ltd.
LR001.1.2016.06

You might also like