You are on page 1of 18

CALCULATION AND TECHNICAL

SPESIFICATION OF LUBE OIL SYSTEM

1 Agus Dwy Bramastha Ir. Dwi Priyanta, MSE Ir. Dwi Priyanta, MSE

Rev Date Prepared By Supervised By Approved By


Document No. : DOC-07-14-1005-LOS

DEPARTMENT OF MARINE ENGINEERING


DOUBLE DEGREE PROGRAM
INSTITUT TEKNOLOGI SEPULUH NOPEMBER – HOCHSCHULE WISMAR
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

TABLE OF CONTENTS
1. INTRODUCTION ......................................................................................................................................... 3
2. OBJECTIVES ................................................................................................................................................. 3
3. REFERENCES ................................................................................................................................................ 3
4. LIST OF ABBREVIATIONS ........................................................................................................................ 3
5. DESIGN REQUIRMENTS .......................................................................................................................... 4
6. SUMMARY OF CALCULATIONS............................................................................................................ 6
6.1 LO CONSUMTION .................................................................................................................................... 6

6.2 MAIN AND CYLINDER LO TANKS ....................................................................................................... 7

6.3 MAIN LO PUMP ......................................................................................................................................... 7

6.4 MAIN LO PIPE DIAMER ........................................................................................................................... 7

ATTACHMENT 1 ................................................................................................................................................... 8
ATTACHMENT 2 ................................................................................................................................................... 9
ATTACHMENT 3 ................................................................................................................................................. 10

2
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

1. INTRODUCTION
There are 2 main point calculation in this document that is main lubricating and
cylinder lubricating. Main lubricating lubricates main bearing, thrust bearing,
crosshead, camshaft. Cylinder lubricating lubricates the cylinder of the engine. Cylinder
lubricating oil is one of important system in the engine. The cost of the cylinder
lubricating oil is one of largest contribution after Fuel Oil. It also has great contribution
on the cylinder condition (project guide S26MC6). There are 2 type of cylinder
lubricating oil system that are MAN B&W Alpha Cylinder and Mechanical Cylinder
Lubricator. In this ship use the MAN B&W Alpha Cylinder because the efficiency of
SLOC and need much high to place the service tank.

2. OBJECTIVES
1. To knowing the function of the lubricating oil system and the component
2. To calculating the pump and heater requirement for the main lubricating system
3. To calculating the pipe diameter of main lubricating system
4. To calculating the requirement of cylinder lubricating system.

3. REFERENCES
1. GL Rules 2015
2. MAN S26MC6 Project Guide

4. LIST OF ABBREVIATIONS
d : diameter [mm]
dH : inside diameter [mm]
dO ; outside diameter [mm]
T : Temperature [°C]
s : thickness [mm]
V : Volume [m3]
t : time [s],[h]
Q : Capacity [m3/h]
Vs : flow velocity [m/s]
H : Head [m], [Mpa], [bar]
hs : head static [m]
hp : head pressure [bar]
hv ; head velocity [m]
hts : total head loss suction side[m]
htd : total head loss discharge side [m]
hf : major head loss [m]
hm : minor head loss [m]

3
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

u : viscosity [m2/s], [cSt]


P : Power [kW]
ṁ : mass flow [m/s]

5. DESIGN REQUIRMENTS
Design requirement for Lube Oil System arrange in GL 2015 Part I Sec 11 H.In the table
1 is the summary of the design requirement Fuel Oil System.

Table 1. Design parameter for Fuel Oil System


Keyword Reference Design Requirement Remark

Lubricating Oil GL 2015 I – Lubricating oil systems are to be -


System 1- 2– constructed to ensure reliable
Section 11 – lubrication over the whole range of
H – 1.1.1 speed and during run-down of the
engines and to ensure adequate
heat transfer.
Construction of GL 2015 I – Where necessary, priming pumps -
oil lubricating 1- 2– are to be provided for supplying
drain tanks Section 11 – lubricating oil to the engines.
H – 1.1.2
Emergency GL 2015 I – A suitable emergency lubricating oil -
Lubricating oil 1- 2– supply (e.g. gravity tank) is to be
Lubrication System

supply Section 11 – arranged for machinery which may


H – 1.1.3 be damaged in case of interruption
of lubricating oil supply.
Other GL 2015 I – Equipments necessary for adequate -
Equipment 1- 2– treatment of lubricating oil
Section 11 – (purifiers, automatic back-flushing
H – 1.1.4.1 filters, filters and free-jet
centrifuges) are to be provided
Auxiliary Engine GL 2015 I – In the case of auxiliary engines
1- 2– running on heavy fuel which are
Section 11 – supplied from a common
H – 1.1.4.2 lubricating oil tank, suitable
equipment is to be fitted to ensure
that in case of failure of the
common lubricating oil treatment
system or ingress of fuel or cooling
water into the lubricating oil circuit,
the auxiliary engines required to

4
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

safeguard the power supply in


accordance with the Rules for
Seagoing Ships, Chapter 3, Section
3, C. remain fully operational.
Location of GL 2015 I – Where an engine lubricating oil -
System Oil Tank 1- 2– circulation tank extends to the
Section 11 – bottom shell plating on ships for
H – 2.1.2 which a double bottom is required
in the engine room,
shut-off valves are to be fitted in
the drain pipes between engine
casing and circulating tank. These
valves are to be capable of being
closed from a level above the lower
platform.
LO Tank

Lub. Oil Drain GL 2015 I – Lubricating oil drain tanks should


Tanks 1- 2– be sufficiently large to ensure that
Section 10 – the dwelling time of the oil is long
C – 3.1 enough for the expulsion of air
bubbles, settling out of residues
etc. With a maximum permissible
filling level of about 85 %, the tanks
must be large enough to hold at
least the lubricating oil contained in
the entire circulation system
including the
contents of gravity tanks.
Overflow pipe GL 2015 I – Gravity tanks are to be fitted with
1- 2– an overflow pipe which leads to the
Section 11 – circulating tank. Arrangements
H – 2.1.4 are to be made for observing the
flow of excess oil in the overflow
pipe.
Lub. Oil Filter GL 2015 I – Lubricating oil filters are to be fitted
1- 2– in the delivery line of the
Pipe and Accessories

Section 11 – lubricating oil pumps.


H – 2.3.1
Lub. Oil Filter GL 2015 I – Mesh size and filter capacity are to
Mesh 1- 2– be in accordance with the
Section 11 – requirements of the manufacturer
H – 2.3.2 of the engine.

5
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

Lub. Oil Filter of GL 2015 I – For protection of the lubricating oil


Min. Mesh 1- 2– pumps simplex filters may be
Section 11 – installed on the suction side of the
H – 2.3.7 pumps if they have a minimum
mesh size of 100 µ.
Lub. Oil Pump GL 2015 I – Main and independent stand-by
1- 2– pumps are to be arranged.
Section 11 – Main pumps driven by the main
H – 3.1.1 engines are to be so designed that
the lubricating oil supply is ensured
over the whole range of operation.
Emergency GL 2015 I – The lubricating oil supply to the
Lubrication 1- 2– main turbine plant for cooling the
Section 11 – bearings during the run-down
H – 3.2.2 period is to be assured in the event
of failure of the power supply. By
means of suitable arrangements
such as gravity tanks the supply of
oil is also to be assured during
starting of the emergency
lubrication system.
Filter GL 2015 I – Fuel and lubricating oil filters which -
Arrangement 1- 2– are to be mounted directly on the
Section 2 – engine are not to be located above
G – 3.1 rotating parts or in the immediate
proximity of hot components.
Equipment of GL 2015 I – The equipment of engines fitted
lub. Oil pump 1- 2– with lubricating oil pumps is subject
Section 2 – to Section 11, H.3.
G – 4.2

6. SUMMARY OF CALCULATIONS
6.1 LO CONSUMTION
Table 2. Summary calculation of LO consumtion.
No Tank Name V M
[m3] [ton]
1 Main Lubricating 0.22 0.14
2 Cylinder Lubricating 0.496 0.3

6
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

6.2 MAIN AND CYLINDER LO TANKS


Table 3. Summary calculation of main LO tanks.
No Tank Name V
[m3]
1 MLO Storage Tank 4.12
2 MLO Service Tank 3.9
3 MLO Sump Tank 3.9
4 CLO Storage Tank 0.496
5 CLO Service Tank 0.198

6.3 MAIN LO PUMP


Table 4. Summary calculation of HFO system Pump
No Pump Name Brand Type Q H P
[m3/h] [m] [kW]
1 Main LO Pump Sili Pump 2GCS 78 40 13
2 Feed Pump Alfa Laval ALP-0015 0.774 40 0.75

6.4 MAIN LO PIPE DIAMER

Table 5. Summary calculation of Main LO Pipe diameter


No Pipe Line Nominal dO dH s Pipe
Size [mm] [mm] [mm] Class
1 LO Transfer Line 4 114.3 110.8 2.11 II
2 LO Feed Line 0.375 17.1 13.8 1.65 II

7
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

ATTACHMENT 1
DETAIL CALCULATION

8
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
PREFACE
This document explain about the detail calculation of Lube Oil System. There are 2 main
point calculation in this documement that is main lubricating and cylinder lubricating.
Main lubricating lubricates main bearing, thurs bearing, crosshead, camshaft.cylinder
lubricating lubricates the cylinder of the engine.

A. MAIN LUBRICATING OIL SYSTEM


Main lubricating is the lubrication process for the main bearing, thurs bearing,
crosshead, camshaft. Main lubricating can also cooling the piston because of that in
the system must be a Lube oil cooler. The main componet of main lubricating are LO
sump tank, main LO pump, LO cooler, full flow filter, LO service tank, and purifier.

1 LUBRICATING OIL SPESIFICATION AND CONSUMTION


1.1 ENGINE SPESIFICATION
Type : MAN 7S26MC6
Engine Output : 2800 kW
Cylinder Bore : 260 mm
Stroke : 980 mm
Cylinder Output : 400 kW
Speed : 250 rpm
SLOC Main. : 0.15 g/KWh
SLOC Cyl. : 0.7 g/KWh
SFOC : 179 g/KWh

1.2 MAIN LO SPESIFICATION


The recommendation of the Lubricating oil SAE which I get from the MAN
B&W S26MC6 Engine Project Guide is 30 . Then I choose Chevron Veritas ©
800 Marine 30. The spesification can see in the table below

Typical Characteristics
SAE Viscosity Grade 30
Code 42241
Base Number 5.4
Density 15° kg/m3 0.89
Kinematic Viscosity

1
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
at 100°C cst 12
at 40°C cst 111
Viscosity Index 95
Pour Point °C -12
Flash Point °C 240

1.3 MAIN LO CONSUMTION


The endurance of Doris Tanker ship is 5 days or 120 hours. The quantitiy of
lubricating oil needed by ship is 2 times the endurance :

WLO = BHP x SLOC x hours x 1.4 x 10-6


= 2800 x 0.15x 120 x2x 1.4 x 10-6
= 0.14112 ton
Then the volume of LO is
VLO = WHFO/ρ x c
= 0.1/0.89 x 1.4
= 0.222 m3
2 MAIN LO TANKS CALCULATION
2.1 LO STORAGE
In the shipping industry ussulay LO is storage in barrel. Because of that in this
ship LO is storage in barrel.
Vconsumtion = WHFO/ρ x c
= 1.1/0.89 x 1.4
= 0.222 m3
Vservice = 3.90 m3
Vstorage = Vconsumtion + Vservice
= 0.22 +3.9
= 4.12 m3
= 25.9265 ~ 26 bbl

2.2 LO SERVICE TANK


The volume of LO servic tank is same as the volume of LO Sump Tank.
Accroding to the project guide the volume is 3.9 m3
VSERVICE = VSUMP
= 3.9 m3

2
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
2.3 LO SUMP TANK
The volume LO Sump Tank accroding to the project guide is 3.9 m3
VSUMP = 3.9 m3

3 MAIN LO PUMP CALCULATION


3.1 HEAD AND CAPACITY
The head and capacity of main lubricating oil pump accroding to the project
guide is 4 bar and 72m3/h
H = 4 bar
= 4 Mpa
Q = 72 m3/h

3.2 PIPE DIAMETER AND SPESIFICATION

2
Q = 0.25 x π x d x v
0.5
d = (Q/(0.25 x π x v)
Where
d = pipe diameter
v = flow velocity
= 1.8 m/s (Recommendation from Project Guide)
Q = capacity
= 72.00 m3/h
= 0.0200 m3/s
Then the pipe diameter is
0.5
d = (Q/(0.25 x π x v)
= 0.10055 m
= 100.55 mm

Accroding to the Table 11.5 about pipe minimum diameter, the thickness group
is N for fuel line passing machinary space . Where in the group N the minimum
diameter is 2.9 mm.
Spesification of pipe according to ANSI
Nominal Size = 4 inches
Inside Diameter = 4.3 inches 110.08 mm
Outside Diameter = 4.50 inches 114.3 mm

3
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
Schedule number = 5S
Thickness = 0.08307 inches 2.11 mm

3.3 MAIN LO PUMP SPESIFICATION


The minimum spesification of pump is has Q = 72 m3/h and h = 4 Mpa
Brand = Sili Pump
Type = 2GCS 118*2-78-0.4
Capacity = 78 m3/h
Head = 4 Mpa
RPM = 1450 rpm
f = 50 Hz
Power = 13 kW
Bore Suc = 100 mm
Bore Dis = 100 mm

4 PURIFIER AND MAIN LO FEED PUMP CALCULATION


4.1 PURIFIER CAPACITY
Based on project guide the recommended for capcity of purifier is 0.136
litre/kWh
Q = BHP [kW]x 0.136[l/kWh]
= 2800 x 0.136
= 380.8 l/h
= 0.3808 m3/h

4.2 PURIFIER SPESIFICATION


Brand = Alfa Laval
Type = P605
max. Q = 0.8 m3/h
Voltage = 220 - 660 V
f = 50 Hz
Power = 1.2 kW

4
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
4.3 FEED PUMP SPESIFICATION
Capacity of the Feed Pump is accroding to the capacity of the Purifier. Capacity
of Purifier max is 800 l/h and minimum capacity is 380 l/h based on calculation.
Then the design pressure should be 4 bar and 100°C design temperature.

The spesification of pump are


Brand = Alfa Laval
Type = ALP-0015
Capacity = 0.774 m3/h
Head = 0.4 Mpa
RPM = 1400 rpm
f = 50 Hz
Power = 0.75 kW
Bore Suc = 32 mm
Bore Dis = 32 mm

4.4 PIPE DIAMETER AND SPESIFICATION


From the feed pump spesification the capacity of the pump is 0.8 m3/h and
from project guide the maximum flow velocity is 0.6m/s. The the calulation of
pipe size is :
2
Q = 0.25 x π x d x v
0.5
d = (Q/(0.25 x π x v)
Where
d = pipe diameter
vs = flow velocity
= 1.8 m/s (Recommendation from Project Guide)
Q = capacity
= 0.77 m3/h
= 0.0002 m3/s
Then the pipe diameter is
0.5
d = (Q/(0.25 x π x v)
= 0.010 m
= 10 mm

5
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0

Accroding to the Table 11.5 about pipe minimum diameter, the thickness group
is N for fuel line passing machinary space . Where in the group M the minimum
diameter is 1.6 mm.
Spesification of pipe according to ANSI
Nominal Size = 0.375 inches
Inside Diameter = 0.5 inches 13.8 mm
Outside Diameter = 0.67 inches 17.1 mm
Schedule number = 10S
Thickness = 0.06496 inches 1.65 mm

5 MAIN LO PRE-HEATER CALCULATION


5.1 HEATER CAPACITY
Pre heater is required to increse the temperature of the LO to the facilities that
handling the fuel such as Purifier. Control of the temperature the LO at the
inlet to the centrifuge is critical as the fuel the temperature must not exceed
98°C or the water seal in the conventional purifier will not tobe mainted.
Because of that the fuel temperature in the pre heater will increase from 30°C
to 55°C. The equation for the pre-heater is :

P = Q x ΔT/1700 [kW]
Where,
Q = Capacity of the Purifier feed pump [l/h]
= 774 l/h
ΔT = Temperature different [°C]
= 25 °C
Then the heater capacity is
P = 800 x 25 / 1700
= 11 kW

10.2 HEATER SPESIFICATION


Brand = Alfa Laval
Type = Heatpac EHS-71
Capacity = 14 kW
Max.T = 160 °C
Max.P = 25 bar

6
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
B. CYLINDER LUBRICATING OIL SYSTEM
Cylinder lubricating oil is one of importan system in the engine. The cost of the
cylinder lubricating oil is one of largest contribution after Fuel Oil. It also has great
contribution on the cylinder condition (project guide S26MC6) . There are 2 type of
cylinder lubricating oil system that are MAN B&W Alpha Cylinder and Mechanical
Cylinder Lubricator. In this ship use the MAN B&W Alpha Cylinder becauze the
efficiency of SLOC and need much high to place the servic tank.

1 LUBRICATIONG OIL SPESIFICATION AND CONSUMPTION


1.2 CYLINDER LO SPESIFICATION
The recommendation of the Lubricating oil base number which I get from the
MAN B&W S26MC6 Engine Project Guide is a BN70 . Then I choose Chevron
Taro © Special HT 70. The spesification can see in the table below

Typical Characteristics
SAE Viscosity Grade 50
Code 407721
Base Number 70
Density 15° kg/m3 930
Kinematic Viscosity
at 100°C cst 21
at 50°C cst 247
Viscosity Index 105
Pour Point °C -15
Flash Point °C 270

1.3 CYLINDER LO CONSUMTION


The endurance of Doris Tanker ship is 5 days or 120 hours. The quantitiy of
lubricating oil needed by ship is 2 times the endurance. The cylinder lubricating
use Alpha cylinder lubrication system which has feed rate 0.7g/kWh
-6
WLO = BHP x SLOC x hours x 1.4 x 10
-6
= 2800 x 0.7x 120 x 1.4 x 10
= 0.3 ton
Then the volume of LO is
VLO = WHFO/ρ x c

7
Project ME 141603
Calculation and Technical
Doc.No 07-14-1005-LOS
Spesification of Lube Oil System
Rev.No 0
= 0.3/0.93 x 1.4
= 0.496 m3

2 CYLINDER LO TANKS CALCULATION


2.1 LO STORAGE
In the shipping industry ussulay LO is storage in barrel. Because of that in this
ship LO is storage in barrel.
VSTORAGE = WHFO/ρ x c
= 0.3/0.93 x 1.4
= 0.496 m3
= 3.12 ~ 4 bbl

2.2 LO SERVICE TANK


The volume of LO servic tank that recommended from project guide is for
minimum 2 days consumtion.
-6
WSERVICE = BHP x SLOC x 48x 1.4 x 10
= 0.132 ton
VSERVICE = WHFO/ρ x c
= 0.198 m3

3 CYLINDER LO PUMP STATION


The cylinder LO pump station is recommended use Serman&Tipsmark Pump Station.
The function of the pump station is to increase the pressure about 45 bar.

8
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

ATTACHMENT 2
ITEM SPESIFICATION

9
Project ME 141603
Calculation and Technical
Doc. No 07-14-1005-LOS
Specification of Lube Oil System
Rev. No 0

ATTACHMENT 3