Open Drain Pipe Line Size Calculation

Document No: MS002-PR-CAL-012-93201

Document Title: Open Drain Pipe Line Size Calculation

Area: Hull deck fire zone

Project Title: MAURITANIA & Senegal Region Tortue


Phase 1

Client: BP

Revision: A01

Pages: 5

By Checked Approved Revision Date Revised For

ZQX CYT LB A01 01/11/19 ISSUED FOR REVIEW

Page 1 of 5

DPSG-00-P-CA-0020 08/07/2021
DPSG-00-P-CA-0020 08/07/2021
Security
Classification:
General
Calculation report
Open Drain Pipe Line Size Calculation

Area: Hull deck fire zone Date: 01/11/19


Project Title: MAURITANIA & Senegal Region Tortue Phase 1 By: ZQX
Client: BP Checked: CYT
Document No: MS002-PR-CAL-012-93201 Approv'd: LB
Revision: A01 Page: 2 of 5 Rev
1
2 1.0 Introduction
3
4 The purpose of this calculation is to justify that current hull deck open drain pipe size can evacuate overboard the deluge water
5 flow plus any released Hydrocarbon liquids during a fire event.
6
7
8
9
10
11
12 1.1 Description
13
14 1.1 4x6" scuppers are desiged and located at mid-point and aft for per hull deck fire zone.
15 1.2 Each fire zone separated by a transverse coaming(height 250mm)
16 1.3 Drain lines are assumed to be corroded with roughness of 0.5mm.
17 1.4 115% of deluge water flow is considered in calculation.
18 1.5 The height of drain pipe overborad is about 4.2m and 1.5m (two types) below hull deck.
19 1.6 The meterial of open drain system pipe choose A01G1(thickness XS ,CLASS II).
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36 2.0 Assumptions
37 2.1 The FPSO will operate with a static trim towards aft (draft discrepancy between forward/aft is 1% )
38 2.2 The FPSO has a plated deck,rain water is not considered.
39 2.3 The density of Hydrocarbon liquids is 1071kg/m3 when a fire event.
40 2.4 Assuming the drain pipe running full of liquid.
41
42
43
44
45
46
47
48
49
50
51 3.0 Conclusions
52 According to the calculation, currently 4x6" drain pipes are sufficient to handle the 115% of deluge water flow rate in each fire zone.
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
CONFIDENTIAL: THE COPYRIGHT IN THIS WORK IS VESTED IN COSCO. IT MUST NOT BE REPRODUCED WHOLE OR IN PART OR USED FOR TENDERING OR MANUFACTURING PURPOSES EXCEPT
UNDER AGREEMENT OR WITH THE CONSENT IN WRITING OF COSCO & THEN ONLY ON CONDITION THAT THIS NOTICE IS INCLUDED IN ANY SUCH REPRODUCTION.
Security
Classification:
General
Calculation report
Open Drain Pipe Line Size Calculation

Area: Hull deck fire zone Date: 01/11/19


Project Title: MAURITANIA & Senegal Region Tortue Phase 1 By: ZQX
Client: BP Checked: CYT
Document No: MS002-PR-CAL-012-93201 Approv'd: LB
Revision: A01 Page: 3 of 5 Rev
1
2 4.0 References
3
4 2.1 MS002-SE-REP-012-00013-B03 Firewater and Foam Demand Calculation Note
5 2.2 MS002-PR-PHI-012-00005-A01 FPSO drainage philosophy
6 2.3 MS002-PR-PHI-012-00002-B03 Line Sizing Philosophy
7 2.4 BV RULE NR445 PARTCV/ CHAPTER 1/ SEC7/8.7
8
9
10
11 5.0        Order of Precedence
12
13 1 In case of conflict between requirements specified herein and the requirements of any other referenced document, the order
14 of precedence shall be:
15 2 Classification rules when applicable
16 3 Project data sheets
17 4 Project specifications
18 5 Referenced Company documents, including GPs and GISs
19 6 Referenced national and international codes and standards
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
CONFIDENTIAL: THE COPYRIGHT IN THIS WORK IS VESTED IN COSCO. IT MUST NOT BE REPRODUCED WHOLE OR IN PART OR USED FOR TENDERING OR MANUFACTURING PURPOSES EXCEPT
UNDER AGREEMENT OR WITH THE CONSENT IN WRITING OF COSCO & THEN ONLY ON CONDITION THAT THIS NOTICE IS INCLUDED IN ANY SUCH REPRODUCTION.
Security
Classification:
General
Calculation report
Open Drain Pipe Line Size Calculation

Area: Hull deck fire zone Date: 01/11/19


Project Title: MAURITANIA & Senegal Region Tortue Phase 1 By: ZQX
Client: BP Checked: CYT
Document No: MS002-PR-CAL-012-93201 Approv'd: LB
Revision: A01 Page: 4 of 5 Rev
1
2 5.1 The fire zone sketch
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 5.2 The maximum flow fire zone 6842-0
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49 5.3 The deluge water flow per fire zone
50
51 Fire Zone/Fire Area Description Deluge flowrate (m3/h)
52 6842-0 (Cargo Tank Top & Flare Facilities Area) 1026.7 ref 2.1
53 6842-1 (Cargo tank Top (Condensate Tank 1&2) & Closed Drain facilities) 640.3 ref 2.1
54 6842-2 (Cargo tank Top (Salty Rich Meg Tanks 2 & 3) 678.3 ref 2.1
55 6842-3 (Cargo tank Top (Condensate Tanks 3 & 4) 524.9 ref 2.1
56 6842-4 (Cargo tank Top (Condensate Tanks 5 & 6) 524.9 ref 2.1
57 6842-5 (Cargo tank Top (Condensate Tanks 7 & 8)) 524.9 ref 2.1
58 6842-6 (Cargo tank Top (Lean MEG Storage Tanks)) 437.4 ref 2.1
59
60
61
62
63
64
65
66
67
68
69
70
CONFIDENTIAL: THE COPYRIGHT IN THIS WORK IS VESTED IN COSCO. IT MUST NOT BE REPRODUCED WHOLE OR IN PART OR USED FOR TENDERING OR MANUFACTURING PURPOSES EXCEPT UNDER
AGREEMENT OR WITH THE CONSENT IN WRITING OF COSCO & THEN ONLY ON CONDITION THAT THIS NOTICE IS INCLUDED IN ANY SUCH REPRODUCTION.
Security
Classification:
General
Calculation report
Open Drain Pipe Line Size Calculation

Area: Hull deck fire zone Date:


Project Title: MAURITANIA & Senegal Region Tortue Phase 1 By:
Client: BP Checked:
Document No: Approv'd:
Revision: A01 Page: 5 of 5 Rev
1
2 6.0 Calculation formulas
3 Drainage of deluge water through vertical lines (if applicable) shall be sized on basis of 50 % of the available head
4 The following formulas can be used to determine the capacity:
5
6 ref 2.3
7
8
9 Q= flow (m3/h)
10 f=Moody friction factor
11 D=pipe inner diameter (m) 0.1463 (6")
12 k=pipe roughness(m) 0.05 carbon steel
13 The Moody friction factor for fully turbulent flow can be calculated by the Nikuradse formula, given by:
14
15 ref 2.3
16
17
18 where the pipe diameter D and pipe roughness k shall be given in the same units.
19 The flow formula is based on setting 50 % of the available head equal to the piping friction loss i.e
20
21
22
23
24 -r=density (kg/m3)
25 -L=pipe length (m)
26 -V=velocity (m/s)
-g=gravity constant
27
(m/s2)
28
29
30 If 4x6" drain flowrate mora than the maximum flowrate x 115% of fire zone 6842-0, the drain pipe numbers and size of pipe is ok.
31
32 unit(m3/h)
33 The drain flowrate of one 6" pipe 585.111247
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
CONFIDENTIAL: THE COPYRIGHT IN THIS WORK IS VESTED IN COSCO. IT MUST NOT BE REPRODUCED WHOLE OR IN PART OR USED FOR TENDERING OR MANUFACTURING PURPOSES EXCEPT
UNDER AGREEMENT OR WITH THE CONSENT IN WRITING OF COSCO & THEN ONLY ON CONDITION THAT THIS NOTICE IS INCLUDED IN ANY SUCH REPRODUCTION.

You might also like