You are on page 1of 2

Sr.

REFERENCE COMMENTS
No.
1. Abbreviations · All missing abbreviations may be
incorporated in the list e.g. HRM,
H&WM, WMP etc.

2. Page No. 1, Sr. No. 3, Detail of · Coverage of the survey / feasibility study
Survey / Feasibility Study comprising of mapping and topographic,
hydrological data collection and soil
sampling / EIA studies etc. should be
mentioned.

3. Page No. 8, Sr. No. 3.3, · Source for the lost live storage capacities
Justification mentioned for the three major reservoirs
should be provided as reference.

4. Page No. 9, Sr. No. 3.4.2, Year- · Reference table i.e. Table-1 should be
wise Estimated Cost mentioned.

5. Page No. 10, Sr. No. 3.4.3, · Please correct reference "Table-7(B)" to
Manpower Requirements "Table-7, Sr. No. B".

6. Page No. 1-1, Table-1 · Year-wise summary of cost estimates


should be mentioned.
· Calculations may be rechecked i.e. at Sr.
No. 5, Contingencies @ 3%= 3% of
column (3+4) and at Sr. No. 6, Authority's
Overhead @ 2.25%= 2.25% of column
(3+4+5).

7. Page No. T-6 to T-9, Table-6 · Calculations may be rechecked.


Page No. T-10, Table-7 · Sr. No. A2; "1,486" may be corrected as
"1.486".
· Sub-total A for Man Months should be
corrected as 50 and same may be
incorporated everywhere.
· Please mention if salary mentioned here
includes house acquisition / rent, gross
salary and free electricity.
· Also salary rates may be assured to be
updated.

Figure-2 · Mention units for the respective chart.

• Proof reading of the entire document may be carried out and all the spelling
and grammatical mistakes should be corrected. Few mistakes are:

Sr. Page No. Incorrect Correct


No.
1. 7 20111 2011
2. . 8 Grater Greater
3. 9 Mangle Mangle
4. T-6 PFFOCE OFFICE
5. Annexure-IV Manger Manager
Page 1 of 9


All figures should be of standard format i.e. colored, labeled, visible etc.

All annexures should comprise of legible copies.

General Objective:
The device for proper monitoring mechanism is advised to be developed along
with the construction of engineering structures regarding subject PC-II so that
requisite plan could be survived for long run and due purpose could be achieved.