Sr. No. Reference Comments 1
Sr. No. Reference Comments 1
REFERENCE COMMENTS
No.
1. Abbreviations · All missing abbreviations may be
incorporated in the list e.g. HRM,
H&WM, WMP etc.
2. Page No. 1, Sr. No. 3, Detail of · Coverage of the survey / feasibility study
Survey / Feasibility Study comprising of mapping and topographic,
hydrological data collection and soil
sampling / EIA studies etc. should be
mentioned.
3. Page No. 8, Sr. No. 3.3, · Source for the lost live storage capacities
Justification mentioned for the three major reservoirs
should be provided as reference.
4. Page No. 9, Sr. No. 3.4.2, Year- · Reference table i.e. Table-1 should be
wise Estimated Cost mentioned.
5. Page No. 10, Sr. No. 3.4.3, · Please correct reference "Table-7(B)" to
Manpower Requirements "Table-7, Sr. No. B".
• Proof reading of the entire document may be carried out and all the spelling
and grammatical mistakes should be corrected. Few mistakes are:
•
All figures should be of standard format i.e. colored, labeled, visible etc.
•
All annexures should comprise of legible copies.
General Objective:
The device for proper monitoring mechanism is advised to be developed along
with the construction of engineering structures regarding subject PC-II so that
requisite plan could be survived for long run and due purpose could be achieved.