You are on page 1of 1

PAINT APPLICATION PROCEDURE

Date : 06.02.2012
Company Name : SILVER TEKNİK
Project : KAR GROUP REFINERY

Equipment STORAGE TANKS

Surface Carbon Steel

1. Oil, grease, dust and mud shall be removed from the surface by using a suitable cleaning chemical or thinner.
Surface Preparation 2. Surfaces shall be blasted in Sa 2 ½ level. Surface profile shall be in 40-70 microns range.
3. Blasted surfaces shall be painted in 8 hours at the latest.

Dry Film Theoretical Loss Practical Application Time of New


Paint Product Code / Name Volume Solid Density
Application Zone Hardener Thinner Colour Thickness Consumption Rate Consumption Coat
Coat (%) (kg/lt)
(microns) (kg/m²) (%) (kg/m²) Min. Max.

1 19300 KANEPOX NOVA PREMIUM 03623009 0671 / 0675 RAL 7032 125 79 1,45 0,229 30 0,328 12 Hours 21 Days
Internal Surfaces of
Tanks
2 19300 KANEPOX NOVA PREMIUM 03623009 0671 / 0675 RAL 7032 125 79 1,45 0,229 30 0,328 12 Hours 21 Days

250

Equipment STORAGE TANKS

Surface Carbon Steel

1. Oil, grease, dust and mud shall be removed from the surface by using a suitable cleaning chemical or thinner.
2. Weld Surfaces shall be blasted in Sa 2 ½ level. Surface profile shall be in 30-50 microns range.
Surface Preparation
3. Surfaces painted with shop primer shall be cleaned with sweep blasting.
4. Prepared surfaces shall be painted in 8 hours at the latest.
Dry Film Theoretical Loss Practical Application Time of New
Paint Product Code / Name Volume Solid Density
Application Zone Hardener Thinner Colour Thickness Consumption Rate Consumption Coat
Coat (%) (kg/lt)
(microns) (kg/m²) (%) (kg/m²) Min. Max.

1 15510 KANEPOX TOL 03093002 0675 / 0675 7133-GREY 140 82 1,40 0,239 30 0,341 6 Hours 30 Days
External Surfaces of
Tanks
2 37370 KANPOLY ACR ENAMEL 01043003 0650 / 0651 RAL 7001 60 55 1,30 0,142 30 0,203 4 Hours 7 Days