Anand V Sharma
Mantrana Maritime Advisory
Contents - Overview
Complexity - Shiprepair
Project Management
www.mantrana.in 2
Shipbuilding & Shiprepair – A Comparison
Shiprepair
Shipbuilding
• Shiprepair is like 100 m sprint race
• High turnaround
• Shipbuilding is Like a Marathon race
• Difficult to estimate work content
• Long Lead Time
• Time schedule
• Long Delivery Schedule
• Project budget
• Tasks can be automated, standardized
• Hidden work emerges during execution
• Work schedule is planned and
• Has to work with pre defined conditions
deliberate
• Degree of Specialization is very high
• Scope of Changes minimal
• Work contract ought to change as repair
• Incase of deviation, enough time to
work progresses
implement
www.mantrana.in 3
Shipbuilding & Shiprepair – A Comparison
www.mantrana.in 4
Constraints of Shiprepair
www.mantrana.in 5
Types of Shiprepair
• Annual Survey – It’s a floating repair, more like Shave – Shampoo activity
carried before annual survey. Its carried out in port of call
Constraints are
• Time of commencing not defined
• About 23 yr old ship
• Turnkey Contract
www.mantrana.in 8
Relationship Complexity - Shiprepair
Management
-Repair Yard
Class/
contractors
Regulation
Production
www.mantrana.in 9
Relationship Complexity - Shipbuilding
Supplier Stock
Resource Planning
Finance
Quality control
Human Resource
Assembly
Contractor
www.mantrana.in 10
Relationship Complexity - Shiprepair
Inquiry
6
1 2 3 7
4 5
6
8
13 12
7
15 11 9
14
12 10
13
16 17
6 Delivery
18
www.mantrana.in 11
Project Management
www.mantrana.in 13
Shiprepair Project Management - Process
• Planning
• Coordination
• Execution
Execution Stage
• Monitoring
• Avoiding conflict of process & Department
• Class & other regulatory approvals
www.mantrana.in 14
Shiprepair Project Management - Critical
• Client Follow-up
• Feedback
• Documentation of for Future Project
Post Delivery
• Retrieval Management
• Bidding Team
• Execution Team
www.mantrana.in 15
Preliminary Scheduling (Enquiry Stage)- Shiprepair
www.mantrana.in 16
Bidding - Shiprepair Projects
www.mantrana.in 17
Yard Selection Matrix – Ship-owners Perspective
De- Opportu
Mobilisat Dry Fixed
mobilisat nity Total
ion Docking Cost
ion Cost
• Matrix Explains, Why Cargo Vessels are repaired in their trade route
• Offshore Supply Vessels, tend to get repaired locally
• Offshore Rigs – travel far off for repair due unavailability of local competence
• Steel renewal
• Machinery Overhauls
Planning Process
• Identify the most critical path, based on zone division & work content
www.mantrana.in 20
Work Breakdown Structure
www.mantrana.in 21
Scheduling of Work – Supply Vessels
Basic Algorithm
Machinery
Remove Overhaul
Steel
Outfit
www.mantrana.in 22
Scheduling of Work – Supply Vessels
Forward
Super Structure
www.mantrana.in 23
Offshore Supply Vessels – Project Management
• Regular Monitoring
• Resource Support
• Critical issues discussed
• Internal Team
• Ship Owner/Manager
• Classification Society
• Accounts Department
• Internal Meeting after every milestone
• Document timelines
• Man-hours/ Material
• Track the progress against the plan
• Trouble shoot in case of deviation
www.mantrana.in 24
Delivery Stage – Project Management
www.mantrana.in 25
Post delivery Stage – Project Management
• Client Follow-up
• Feedback
• Documentation for Future Project
• Retrieval Management
• Bidding Team
• Execution Team
www.mantrana.in 26
Implied Responsibility of Project Manager - Shiprepair
• Plan & Budget for Time & Cost for jobs Mentioned in Contract
• Plan & Budget for Time & Cost for jobs Not Mentioned in Contract
i.e. Implied jobs
www.mantrana.in 27
Implied Responsibility of Project Manager - Shiprepair
• As fitted drawings with structural items may not provide exact fittings on ship
• List down deviation from the bidding scope & actual work found during
inspection
• Work with owner on the deviation in bid and actual work content
www.mantrana.in 28
Thank you for your Attention
www.mantrana.in 29