You are on page 1of 2

ARABIAN GULF OIL COMPANY

DAILY WORKOVER REPORT


‫لنفط‬
‫شـركة لاــخليج لاــعـربـي لـــ‬
REPORT No. 3 DATE 30/12/2020
WELL No. G 101 FIELD NAFOORA DEPTHS ADWOC RIG 22
PROD.CSG. SIZE 9 5/8'' 47-43.5# PBTD 8967
LINER SIZE,WT LINER SHOE DEPTH T.O.L @
TBG. SIZE /WT PACKER SIZE INTAKE @
SITP PSI SICP PSI PBTD CHOKE SIZE E.O.M @
TIME DISTRIBUTION PERF/PKR/DBP/CR/TD
From To
6:00 OH(8732-8967')
CONT MOVE RIG 100 %,SPOT INSIDE LOCATION 100%

18:00 AND R/UP RIG 80 %.

TOTAL JTS ON RIG 276


IN THE HOLE 0
IN DERRICK 0
ON THE RACK
NOTE OUT LOC 14
FOUR LOADS OF WATER HAVE BEEN RECEIVED. FLUID DATA
FLUID WT 8.4
FLUID REC 0
FLUID FOWARD 0
TOTAL FLUID REC 0

TIME DISTRIBUTION
OPERATING 0
RD/MV/RU 12
STAND BY 0
REPAIRS 0
SHUT DOWN 0
TOTAL Hrs 12

COST DATA
RIG COST 11,739
FUEL COST 270
WATER COST 350
FORK LIFT 490
FRESH WATER 350
SALT 0
FISHING/TOOLS 0
LOG/PERF/RCT 0
CEMT/ACID/CHEM 0
SHUT DOWN FOR NIGHT
FOOD/TRAN/P 0
CSG COST 0
11" HYD+SP00L 0
DAILY COST 13,199
COST FWD 26,218
COMM.COST 39,417 LD FUEL COMM.COST 39,417
START SALT / USED 0 DAILY USE 1800
SWAB CUP 2 7/8" 0 FORK - LIFT BALANCE 7690
SWAB CUP 3 1/2" 0 7'' SCRAPER
SAVER RUBBER 0 5'' SCRAPER
WATER TRUCK

EQUIP/TOOL FAILURES SERVICE. CO DOWN TIME:


STARTED W/O 28/12/2020 NEXT OPERATION CONT R/UP RIG & TAKE ON WATER
COST CODE: 324-090-XXX-291-0005 AGOCO SUPERVISOR AHMEDA

You might also like