Part 1: Bidding Procedures Section 2: Bid Data Sheet

Section 2. Bid Data Sheet

Table of Contents

A. General 3
B. Contents of Bidding Documents 6
C. Preparation of Bids 7
D. Submission and Opening of Bids 9
E. Evaluation and Comparison of Bids 10
F. Award of Contract 10

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Section II of IX Issued by: Dukem Municipality
Instructions to
Bidders (ITB) Data relevant to ITB
reference
A. General
ITB 1.1 The Public Body is: Dukem Municipality
Registered Address:
Name and address of the Employer. : Concrete Ditch

Attention: Mr. DABA GALASA


Dukem Municiplaity
Town/City: Dukem
P.O Box No/Postal Code:
Country: Ethiopia
Telephone: -
Fax:
E-mail address
ITB 1.1 Public Body: Dukem Municipality
P.O. Box:
Town/City: Dukem
Country: Ethiopia

The Bidding Documents is issued under Procurement Method: Open


ITB 1.1
Bidding
The name of the bidding process is LCB (Local Competitive Method).
The Intended Completion Date for the whole of the Works shall be 20
ITB 1.2
calendar days from the date of contract signed.

ITB 1.2 and The Project name is: Construction of Concrete ditch typ-2 and Box
24.2(b) culvert
General description of the work is:
Construction of concrete ditch for City park Asphalt Road and box
culvert.
Instructions to Data relevant to ITB
Bidders (ITB)
reference
ITB 1.4and The Procurement Reference Number is: Not Required
24.2(b)

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 3of 10 Issued by: Dukem Municipality
Instructions to
Bidders (ITB) Data relevant to ITB
reference
ITB 1.4 The number and identification of Lots in this Bidding Documents is: Not
Applicable
ITB 3.6 A complaint shall not be submitted in respect the following circumstances:
a) The procurement method selected;
b) The margin of preference applied for domestic bidders, if any;
c) The rejection of bids pursuant to clause 41 of the Instructions to
Bidders;
d) After 5 working days of the employer’s notification of the bid
evaluation result or written notification of decisions made for the
complaints already lodged, if any; and
e) After signing of the contract with the successful bidder.

The provision of sub-clause 3.6 (e) shall apply where the following
conditions are satisfied:
a. Where the contract has been signed without a complaint being filed
with the employer within seven working days after notification of
the final bid evaluation result or decisions of complaints lodged, if
any; and
b. Where the employer responds to the complaint submitted and a
contract is signed because of the expiration of the time limit for the
contract signing after the award without the candidate pursuing its
complaint further.

ITB 4.1(a) The individuals or firms in a joint venture, consortium or association shall
be jointly and severally liable.

ITB 4.5(b)(ii) Bidders shall provide: Its certificate of Registration from Dukam
administration Ministry of Urban Development & Construction or other
appropriate Regional Bureaus with Category GC- 9 or GC- 8 awards in
2011 by. And those have all necessary valid Legal Documents.

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 4of 10 Issued by: Dukem Municipality
Instructions to
Bidders (ITB) Data relevant to ITB
reference
Instructions to Data relevant to ITB
Bidders (ITB)
reference
Failure to submit the aforementioned documents may result in the rejection
of the bidders bid document
ITB 4.5(c)(iV) Foreign Bidders shall provide and fulfill the following :
i. Business organization registration certificate or trade license
issued by the country of establishment
ii. Produce Evidence of Registration from relevant authorities in
Ethiopia before the commencement of the works in order to pay
taxes
Failure to submit the aforementioned documents may result in the rejection
of the bidders bid document.
ITB 4.7 A Bidder shall amend the evidence of its continued eligibility with the
following documents:

i. Category GC-9 or GC-8, registered by the Dukam


administration
ii. Renewed their license for 2013 EFY;
iii. Renewed trading license for 2013 EFY;
iv. VAT and/or TOT Registered.

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 5of 10 Issued by: Dukem Municipality
A. Contents of Bidding Documents
ITB 8.1 and For questions and/or clarification purposes only, the Public Body’s address
10.4 is:
Public Body: Dukem Municipality
Attention: Mr. Daba Gelassa
Dukem Municipality
Floor/Room number: Office Room No.
P.O. Box:
Street Address:
Town/City: Dukem
Post Code:
Country: Ethiopia
Telephone: 0114-71-83-09
Fax:
E-mail address
ITB 8.1 and The deadline for submission of questions and/or clarifications is:
10.4 Date:-As per notification
Time: As per notification
Subject to extension of deadline for bid/proposal submission dates (if any)
made in accordance with ITC sub-clauses 9.3 & 25.2, the dead line for
submission of questions and/or clarifications SHALL NOT be extended further
to ten(10) days prior to the amended deadline for bid closing date

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 6of 10 Issued by: Dukem Municipality
ITB 10.1 A pre-bid meeting shall be held
Date:-As per notification
Time: As per notification
Address of Pre-bid meeting: Dukem Town, in Municipality Hall
Floor/room number: GF
Town/City: Dukem
Postal Code:
Country: Ethiopia
Contact Name: Mr.Daba Gelassa
Telephone: 0114-71-83-09
Fax:
The Employer will not hold a site visit. However, bidders are advised to visit
the project site & its surroundings by their own. Bidders shall complete and
provide with their bid the declaration of site visit form to confirm that the
bidder has gathered all information necessary for preparing the tender &
entering into a contract for the construction of the works as per the attached
form DSV-401 section 3 evaluation and Qualification criteria.
Note:
 Bidders are requested to attend the pre-bid training based
meeting.

B. Preparation of Bids
ITB 12.1 Language of the Bid shall be English or Afaan Oromo
The Contract is :
ITB 13.1
Fixed rate Contract
NA
ITB 13.9
Prices quoted shall correspond to at least :Not Applicable
ITB 13.12

ITB 14.1 For those inputs to the Works that the Bidder expects to provide from inside
Ethiopia prices shall be quoted in Ethiopian Birr
ITB 15.1 Bidder must provide in the Bidder Certification of Compliance Form
information related to its professional qualification and capability for the
current and three previous years in order to proof its professional capacity.

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 7of 10 Issued by: Dukem Municipality
ITB 16.3 N/A
The Public Body may undertake physical checking of current Bidder's
ITB 16.7
technical qualifications and competence.
NA
ITB 17.2(b)

Alternative Bids shall not be considered.


ITB 19.1
If alternative bids are permitted under BDS Clause 19.1 they must meet the
ITB 19.4
following criteria: N/A
The bidding procedure to be followed is a two-envelope procedure. The Bid
ITB 20
guarantee bond (Guarantee latter) and Post-Qualification Document should be
sealed in two separate envelopes and finally sealed with one outer envelope.
The first envelope containing the Bid guarantee bond (Security letter from the
concerned body as specified on announcement ), The second envelope
containing the Post-qualification(Technical Document)” for the construction
works of “Construction of concrete ditch .” sealing originals and copies
separately and duly marking the inner envelopes as “ORIGINAL” and
“COPY” and the two envelopes shall then be sealed in an outer envelope
marked as“ Original and copy of Bid security and Post-qualification
Document” Construction of Concrete ditch.

ITB 20.1 The Bid validity period shall be: 30 days

ITB 21.1 NA

ITB 21.5 NA
ITB 22.1 In addition to the original of the Bid, the number of copies required is:- One

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 8of 10 Issued by: Dukem Municipality
Public Body: Dukem Municipality
Municipality
Attention: number: Mr. Daba Gelasa
Floor/Room
P.O. Box:
Dukem
Bidders Municipality
shall be required to submit bid documents in two envelopes containing
Street
ITBAddress:
22.1
the Original
Floor/Room number: Dukem
Town/City: technical (Post Qualification Document) and copy of technical
Post
P.O. Code:
Box: (Post Qualification Document) in other envelop.
Country: Ethiopiaproposal (Post Qualification Document) shall be consisted of
Street Address:  Technical
Town/City: mandatory
Dukem documentary evidence listed in the ITB Clause 22.2 (a) to (e);
Post Code:  The Employer will open the Technical proposal in the presence of Bidder’s
Country: Ethiopiarepresentatives who choose to attend, at the time, date and
designated
location stipulated in the Bidding data by a committee of officials
immediately after the deadline of bid submission.
The remaining envelope containing the bid & other necessary documents
will remain sealed signed by the committee & deposited with the chairman
of the Contract Award Committee or independent authority until they are
opened publicly if needed. The bidder’s representatives who are present
shall sign a register evidencing their attendance.

C. Submission and Opening of Bids


ITB 25.1 For Bid submission purposes only, the Public Body’s address is:

The deadline for Bid submission is: As Per Notification


ITB 28.1 The Bid opening shall take place at: Dukem Municipality Conference Hall

The Bid opening date is: As Per Notification


Time: As Per Notification

ITB 31
NA
D. Evaluation and Comparison of Bids

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 9of 10 Issued by: Dukem Municipality
ITB 33.2 Bidder has to confirm that he accepts the correction of the calculation error
During Arithmetic check.

ITB 35.1 The currency that shall be used for bid evaluation and comparison purposes to
convert all bid prices expressed in various currencies into a single currency is:
Ethiopian Birr

ITB 38.5 Evaluation is to be carried out in one stage only, since comparison is only by
technical proposal. The bidder got the greater point will win the proposed
project and one bidder will win only one project or one lot only.

E. Award of Contract
ITB 44.1 The percentage by which quantities may be increased is: 10%
The percentage by which quantities may be decreased is:- 10%

SBD-Works (NCB) - Prepared by the FPPA (Version 1, April 2011)


Document: Bid Data Sheet Page 10of 10 Issued by: Dukem Municipality

You might also like