AFFECTIVE DOMAIN
Marks CO3 : PO9
LEVEL

A1 8
A2 8

A3 8
A4 8

A4 8
Total 40

Prepared by: Endorsed by:




40


PM Ir Dr Yee Hooi Ir Afifudin Bin Ts. Syahrul Fithry Bin
Min Habulat Senin
Associate Professor Senior Lecturer Resource Person
CESS513 CES513 CES513
Date : 9/6/2021 Date : 9/6/2021 Date : 9/6/2021
COMPUTATIONAL ANALYSIS METHOD FOR ENGINEERS

(CES513)

PROJECT (10%)

Learning Outcomes:
After completing this group project, students should be able to (CO3:PO9)(A1-A4):
1. Contribute useful ideas to advance work of team (A1)
2. Manage time (prioritize, establish deadlines/milestones, follows timeline, plan for contigencies,
adapt to changes) (A2)
3. Share and accept accountability when working in a team (A3)
4. Foster a positive and productive team members working together, courteous and respectful with
team members and demonstrate a positive attitude using verbal (A4)

CO3: Display responsibility as a member or leader in diverse teams and in multi-disciplinary
environment in order to solve complex civil engineering problems
PO9: Ability to function effectively as an individual, and as a member or leader in diverse teams and in
multi-disciplinary settings.

INSTRUCTION

Students in group of maximum five (5) members are required to find the case study either based
on journal paper, thesis or any literature research regarding to the problem that are given to you
in order to guide your group to decide the material and mechanical properties of the element. The
element chosen based on the group number that had been finalized by your lecturer. By using the
finite element software, model that problem and perform the finite element analysis. The report
must include the distribution of the tasks for each member in the group and the evidence must be
provided to show each member has carried out the functions towards the success of the project,
organization chart, minute meeting for each time of the discussion among group members,
preparing the Gantt chart and the details steps involve in finite element analysis.

(40 marks)


Important Note:

The project will be assessed based on group and individual performance in carrying out task assigned.
Each group is compulsory to present their work and the duration of the presentation must be within 10
to 15 minutes. Both final report and video must be submitted on before 13 JULY 2021.

Group 1

Truss bridges normally serve as train bridges due to their strength and durability. Students are required
to propose a truss system for a bridge. Students need to check the maximum deflection and the maximum
stress according to EC3 Standard of such a bridge under static loading using Finite Element Method.
Students must provide a thorough discussion on their observation and findings.

Group 2

Frame structures are usually used to overcome the large moments developing due to the applied loading.
Students are required to propose a frame system for the factory. Students need to determine the
maximum nodal displacements of the frame using Finite Element Method. Students must provide a
thorough discussion on their observation and findings.

Group 3

The elastic stress distribution of an elastic beam in bending is linear distributed. If the beam is no longer
elastic and it will cause the beam failed. Students are required using the Finite Element Method software
to test this hypothesis. Students must provide a thorough discussion on their observation and findings.

Group 4

Beam element is one of the important element in a structure. Students are required to propose beam
elements in a long dam. Students need to check the maximum stress of the dam under static loading using
Finite Element Method. Students must provide a thorough discussion on their observation and findings.

Group 5

Bar element is one of the important element in a structure. Students are required to propose bar elements
in a structure member. Students need to check the maximum stress of the structure under static loading
using Finite Element Method. Students must provide a thorough discussion on their observation and
findings.


RUBRICS MINI PROJECT

Criteria Indicators Level 1 Level 2 Level 3 Level 4 Level 5


Routinely
Individual Ideas
No contribution of Rarely contributes Some contributes Contributes useful contributes
Contributions Ability
useful ideas to useful ideas to useful ideas to ideas to advance useful ideas to
to contribute useful
advance the work of advance the work advance the work of the work of the advance the
ideas to advance work
the team of the team the team team work of the team
of team
(0 mark) (2 marks) (4 marks) (6 marks) (8 marks)
(A1)
Demonstrates
Time Management
Demonstrates the the ability to
Ability to manage time
Individual ability to manage manage time,
(prioritize, establish Not demonstrates Demonstrates Demonstrates some
Contributions time, including including
deadlines/milestones, ability to manage minimal ability to ability to manage
Within A communicating communicating
follows timeline, plan time. manage time. time.
Team and reacting to and reacting to
for contigencies, adapt (0 mark) (2marks) (4marks)
changes changes
to changes)
(6 marks) (8 marks)
(A2)

Credit and
Accountability Ability No sharing credit or Sometimes share Share credit and Share credit and
Very little share
to share and accept accept credit and accept accept always accept
credit
accountability when accountability accountability accountability accountability
(2 marks)
working in a team (0 mark) (4 marks) (6 marks) (8 marks)
(A3)



Leadership Skills
1. Ability to lead a
team 2. Demonstrate
capacity for initiate
while respecting others Demonstrates
Demonstrates some Demonstrates Exemplifies
3. Facilitates others No leadership skills. minimal leadership
leadership skills. leadership skills. leadership skills.
involvement (0 mark) skills.
(4 marks) (6 marks) (8 marks)
4. Evaluate team (2 marks)
effectiveness and plan
for improvement
(A4)

Promoting Positive
Team Skills
Team Atmosphere
Always upholds
1. Ability to foster a
Promotes supports and promotes
positive and productive Rarely supports a
No support a Sometimes supports a a constructive supports a
team members constructive team
constructive team constructive team team climate by constructive
working together climate with
climate with regards climate by exhibiting exhibiting team climate by
2. Courteous and regards to courtesy,
to courtesy, respect, courtesy, respect, courtesy, respect, exhibiting
respectfull with team respect, attitude,
attitude, motivation attitude, motivation attitude, courtesy,
members motivation and
and assistance. and assistance. motivation and respect, attitude,
3. Demonstrate a assistance.
(0 mark) (4 marks) assistance. motivation and
positive attitude using (2 marks)
(6 marks) assistance.
verbal
(8 marks)
(A4)

LEVEL MARKS % REQUIRED


A1-A2 16 40.0 40-70
A3-A4 24 60.0 30-60
A5-A7 0 0.0 0
TOTAL 40 100