DOH Review Fee Invoice Estimator: Project Type
DOH Review Fee Invoice Estimator: Project Type
Total SMA $0
Project reports
Project Type Fee
Construction documents
Project Type Fee
b. "Expanding public water system": A public water system installing additions, extensions, changes, or
alterations to their existing source, transmission, storage, or distribution facilities that will enable the
system to increase in size its existing service area and/or its number of approved service connections.
Exceptions:
i. A system that connects new approved individual retail or direct service connections onto an existing
distribution system within an existing service area; or
ii. A distribution system extension in an existing service area identified in a current and approved water
system plan or project report.
c. “Filtration and complex treatment process”: Filtration and complex treatment processes include but are
not limited to:
i. Water filtration (any type)
ii. Ion exchange (WAC 246-290-990 mistakenly includes ion exchange as a “chemical addition” unit
process. It is not a chemical addition process, and is included in the meaning of “purification plant”
defined in WAC 246-292)
iii. Electrodialysis
iv. Reverse osmosis
v. Air stripping
vi. UV disinfection
vii. Adsorptive media
viii. Iron and manganese removal
d. “Incidental activity”: Applies to “chemical addition only” when such treatment is included with any
of the following types of projects:
iii. Electrodialysis
iv. Reverse osmosis
v. Air stripping
vi. UV disinfection
vii. Adsorptive media
viii. Iron and manganese removal
d. “Incidental activity”: Applies to “chemical addition only” when such treatment is included with any
of the following types of projects:
i. All types of filtration or other complex treatment projects
ii. Complete new water system
iii. New source approval
iv. Existing system approval
e. “Number of connections”:
i. Fees for a newly proposed community system are based on the proposed number of total service
connections, as defined in Water Facilities Inventory (WFI) box 28.
ii. Fees for an existing community system not seeking an increase in the number of approved service
connections, or a community system with an “unspecified” number of approved connections, are based
on the existing number of total service connections, as shown on the purveyor’s WFI box 28.
iii. Fees for an existing community system seeking an increase in the number of approved service
connections are based on the total number of approved connections sought.
iv. The equivalent number of service connections for non-community water systems is based upon the
combined transient population divided by 25, and non-transient population divided by 2.5.
v. Fees for a newly proposed non-community system are based on the expected combined maximum
monthly transient and regular non-residential population, converted to equivalent service connections.
vi. Fees for an existing non-community system not seeking an increase in the number of approved
service connections are based on the existing combined maximum monthly transient and regular non-
residential population.
vii. Fees for an existing non-community system seeking an increase in the number of approved service
connections are based on the expected combined maximum monthly transient and regular non-residential
population.
Example 1:
The project submittal consists of a project report and construction documents for a new
well, reservoir, pump station, and transmission main; plus the addition of chlorine and
fluoride at the well house.
The applicable fee categories are:
• Project Report – System modifications including new source
• Construction Documents –New source
• Construction Documents –System modifications
Example 2a:
The first of two project submittals is received on May 15, involving a new well and
iron/manganese removal. The second project submittal, from the same purveyor, is
received on June 4, involving improvements to transmission and distribution. The
project report indicates that the transmission improvements are related to the new well.
The applicable fee categories for the May 15 submittal are:
• Project Report – Complex treatment
• Project Report – System modifications including new source
• Construction Documents – Complex treatment
• Construction Documents – New source
The applicable fee categories for the June 4 submittal are:
• Project Report – System modifications including new source
• Construction Documents – System modifications
Example 2b:
A single project submittal is received on May 15, involving a new well and
iron/manganese removal, and improvements to transmission and distribution. The
project report indicates that the transmission improvements are related to the new well.
The applicable fee categories for the May 15 submittal are:
• Project Report – Complex treatment
• Project Report – System modifications including new source
• Construction Documents – Complex treatment
• Construction Documents – New source
• Construction Documents – System modifications
Example 3:
The submittal is described as a water system plan amendment, but is submitted to satisfy
the project report and water system planning requirements associated with planned
construction of a new reservoir and pump station. We are informed construction
documents will follow approval of the amendment.
The applicable fee categories are:
• Water System Plans – Water system plan amendment
• Project Report – System modifications including new source
Example 4:
The project submittal consists of groundwater disinfection to achieve 4-log virus
inactivation prior to the first customer. The project involves the injection of chlorine at
an existing well, plus the construction of new piping between the well and distribution
system necessary to achieve the required level of treatment.
The applicable fee categories are:
• Project Report – Chemical addition
• Construction Documents – Chemical addition
• Construction Documents – System modifications
Example 5:
The project submittal consists of a complete new water system for an industrial park,
including a new well, ion exchange for nitrate removal, a water storage tank, a booster
pump station, and 3,000 feet of new water main.
The applicable fee categories are:
• Project report - Complex treatment
• Project report- Complete water system
• Construction Documents – Complex treatment
• Construction Documents – System modifications
Example 5:
The project submittal consists of a complete new water system for an industrial park,
including a new well, ion exchange for nitrate removal, a water storage tank, a booster
pump station, and 3,000 feet of new water main.
The applicable fee categories are:
• Project report - Complex treatment
• Project report- Complete water system
• Construction Documents – Complex treatment
• Construction Documents – Complete water system