DOH Review Fee Invoice Estimator

Water system plans


Project Type Fee

Total Water system plans $0

Satellite management agency (SMA) plans


Project Type Fee

Total SMA $0

Project reports
Project Type Fee

Total Project Reports $0

Construction documents
Project Type Fee

Total Construction documents $0

Existing system approval


Project Type Fee

Total of Existing System approval $0


Total overall estimated fee $0
You've accessed our DOH Review Fee Estimator. Here are a few instructions on how to use this tool
User’s Instructions
(1) Put your cursor on the first row of the table matching the submittal category you plan to make and
click your mouse. For example, if you intend to submit a Project Report, click on Row 23. You will see
a drop down menu arrow to the right of the row.
(2) Pull down the drop down menu with your cursor, and scroll to the type of submittal you intend to
make. For example, if you intend to submit a project report for a new water system, then scroll through
the choices in the menu and select "complete new water system" with the number of connections planned
for the new system. Upon making your selection, the fee for review of this document will appear under
the column "fee".
(3) If you want to delete a selection, place your cursor over the project type selection and hit the "delete"
key.
Apply each submittal category to calculating total fee
A fee will be charged for review and approval under each applicable submittal category in WAC 246-
290-990, unless the associated activity meets the definition of “incidental” (see definitions). Unless
exempted as provided for in WAC 246-290-125, each construction document submittal will have a
corresponding project report.
Under “project reports”, add the fee for complex treatment (see definitions) if complex treatment is
included with a submittal for a complete new system or system modifications.
Under “construction documents”, add the fee for complex treatment if complex treatment is included
with a submittal for a complete new system, new source, or system modifications.
Phased projects
Projects submitted for review in phases (e.g., Phase I water main extension, Phase II water main
extension) will be assessed separate fees if the submittal for each phase is submitted at different times.
If two or more project phases are submitted at the same time, the review of all phases included in that
submittal are charged once under each of the applicable fee categories.
Definitions
Apply the following definitions when using the estimator tool:
a. “Chemical addition”: Chemical addition processes include but are not limited to:
i. In-line fluoridation
ii. In-line chlorination, chlorine dioxide, or ozonation
iii. Sequestration
iv. Chemical addition to inhibit corrosion or adjust pH

b. "Expanding public water system": A public water system installing additions, extensions, changes, or
alterations to their existing source, transmission, storage, or distribution facilities that will enable the
system to increase in size its existing service area and/or its number of approved service connections.
Exceptions:
i. A system that connects new approved individual retail or direct service connections onto an existing
distribution system within an existing service area; or
ii. A distribution system extension in an existing service area identified in a current and approved water
system plan or project report.

c. “Filtration and complex treatment process”: Filtration and complex treatment processes include but are
not limited to:
i. Water filtration (any type)
ii. Ion exchange (WAC 246-290-990 mistakenly includes ion exchange as a “chemical addition” unit
process. It is not a chemical addition process, and is included in the meaning of “purification plant”
defined in WAC 246-292)
iii. Electrodialysis
iv. Reverse osmosis
v. Air stripping
vi. UV disinfection
vii. Adsorptive media
viii. Iron and manganese removal

d. “Incidental activity”: Applies to “chemical addition only” when such treatment is included with any
of the following types of projects:
iii. Electrodialysis
iv. Reverse osmosis
v. Air stripping
vi. UV disinfection
vii. Adsorptive media
viii. Iron and manganese removal

d. “Incidental activity”: Applies to “chemical addition only” when such treatment is included with any
of the following types of projects:
i. All types of filtration or other complex treatment projects
ii. Complete new water system
iii. New source approval
iv. Existing system approval

e. “Number of connections”:
i. Fees for a newly proposed community system are based on the proposed number of total service
connections, as defined in Water Facilities Inventory (WFI) box 28.
ii. Fees for an existing community system not seeking an increase in the number of approved service
connections, or a community system with an “unspecified” number of approved connections, are based
on the existing number of total service connections, as shown on the purveyor’s WFI box 28.
iii. Fees for an existing community system seeking an increase in the number of approved service
connections are based on the total number of approved connections sought.
iv. The equivalent number of service connections for non-community water systems is based upon the
combined transient population divided by 25, and non-transient population divided by 2.5.
v. Fees for a newly proposed non-community system are based on the expected combined maximum
monthly transient and regular non-residential population, converted to equivalent service connections.
vi. Fees for an existing non-community system not seeking an increase in the number of approved
service connections are based on the existing combined maximum monthly transient and regular non-
residential population.
vii. Fees for an existing non-community system seeking an increase in the number of approved service
connections are based on the expected combined maximum monthly transient and regular non-residential
population.

Partial design submittals


Applicable fee categories for submittals such as “10% design”, “60% design”, and 90% design”, will be
applied to each design submittal. For example, if you submit a “60% design” submittal comprised of
construction documents and are asked to provide comment (approval is impossible since it is not a
complete design), you will be charged the full amount under the applicable fixed fee(s) under
“construction documents. The “90% design” submittal comprised of construction documents will be
charged (again).
Examples

Example 1:
The project submittal consists of a project report and construction documents for a new
well, reservoir, pump station, and transmission main; plus the addition of chlorine and
fluoride at the well house.
The applicable fee categories are:
• Project Report – System modifications including new source
• Construction Documents –New source
• Construction Documents –System modifications
Example 2a:
The first of two project submittals is received on May 15, involving a new well and
iron/manganese removal. The second project submittal, from the same purveyor, is
received on June 4, involving improvements to transmission and distribution. The
project report indicates that the transmission improvements are related to the new well.
The applicable fee categories for the May 15 submittal are:
• Project Report – Complex treatment
• Project Report – System modifications including new source
• Construction Documents – Complex treatment
• Construction Documents – New source
The applicable fee categories for the June 4 submittal are:
• Project Report – System modifications including new source
• Construction Documents – System modifications
Example 2b:
A single project submittal is received on May 15, involving a new well and
iron/manganese removal, and improvements to transmission and distribution. The
project report indicates that the transmission improvements are related to the new well.
The applicable fee categories for the May 15 submittal are:
• Project Report – Complex treatment
• Project Report – System modifications including new source
• Construction Documents – Complex treatment
• Construction Documents – New source
• Construction Documents – System modifications
Example 3:
The submittal is described as a water system plan amendment, but is submitted to satisfy
the project report and water system planning requirements associated with planned
construction of a new reservoir and pump station. We are informed construction
documents will follow approval of the amendment.
The applicable fee categories are:
• Water System Plans – Water system plan amendment
• Project Report – System modifications including new source
Example 4:
The project submittal consists of groundwater disinfection to achieve 4-log virus
inactivation prior to the first customer. The project involves the injection of chlorine at
an existing well, plus the construction of new piping between the well and distribution
system necessary to achieve the required level of treatment.
The applicable fee categories are:
• Project Report – Chemical addition
• Construction Documents – Chemical addition
• Construction Documents – System modifications
Example 5:
The project submittal consists of a complete new water system for an industrial park,
including a new well, ion exchange for nitrate removal, a water storage tank, a booster
pump station, and 3,000 feet of new water main.
The applicable fee categories are:
• Project report - Complex treatment
• Project report- Complete water system
• Construction Documents – Complex treatment
• Construction Documents – System modifications
Example 5:
The project submittal consists of a complete new water system for an industrial park,
including a new well, ion exchange for nitrate removal, a water storage tank, a booster
pump station, and 3,000 feet of new water main.
The applicable fee categories are:
• Project report - Complex treatment
• Project report- Complete water system
• Construction Documents – Complex treatment
• Construction Documents – Complete water system

Hourly Fee for Service Activities


We will charge $102 per hour for review of the following types of submittals and for
performance of the following tasks:

Hourly fee for service activities include:


• Small water system management program.
• Corrosion control recommendation report.
• Corrosion control study.
• Plan to cover uncovered reservoirs.
• Pre-design study.
• Uncovered reservoir plan of operation.
• Tracer study plan.
• Surface water or GWI treatment facility operations plan.
• Filtration pilot study.
• GWI determination reports.
• Collection of water quality samples requested by purveyor.
• Review of alternate technologies requested by purveyor, manufacturer or authorized
representative.
• Annual on-site inspections for unfiltered surface water systems that is not otherwise
part of assessing watershed control and disinfection treatment.
• Well field designations.
• Transfers of ownership.
• Capacity evaluation that is not otherwise part of a project report.
• Hydraulic analysis that is not otherwise part of a project report.
• Sanitary control area reduction that is not otherwise part of source approval.
• Source blending treatment plan that is not otherwise part of source approval.
(1)  (a) Water system plans
Project Type System Size Cost
(a)(1) Water system plan (new and updated plans) <100 Services $491
(a)(1) Water system plan (new and updated plans) 100 to 500 Sevices $1,206
(a)(1) Water system plan (new and updated plans) 501 to 999 Sevices $2,280
(a)(1) Water system plan (new and updated plans) 1,000 to 9,999
Sevices $3,705
(a)(1) Water system plan (new and updated plans) 10,000 or more
Sevices $5,484
(a)(2) Water system plan amendment <100 Services $115
(a)(2) Water system plan amendment  100 to 500 Services $293
(a)(2) Water system plan amendment 501 to 999 Services $565
(a)(2) Water system plan amendment 1,000 to 9,999 Services $919
(a)(2) Water system plan amendment 10,000 or more Services $1,349

 (1) (b) Satellite management agency (SMA) plans


Project Type System Size Cost
(b)(1) SMA plan for ownership (new and updated plans) <100 Services $491
(b)(1) SMA plan for ownership (new and updated plans) 100 to 500
Services $1,206
(b)(1) SMA plan for ownership (new and updated plans) 501 to 999
Services $2,280
(b)(1) SMA plan for ownership (new and updated plans) 1,000 to 9.999
Services $3,705
(b)(1) SMA plan for ownership (new and updated plans) 10,000 or more
Services $5,484
(b)(2) SMA approval amendment $102
(b)(3) SMA plan for operation only (new and updated plans) <100
Services $1,206
(b)(3) SMA plan for operation only (new and updated plans) 100 to 500
Services $1,206
(b)(3) SMA plan for operation only (new and updated plans) 501 to 999
Services $1,206
(b)(3) SMA plan for operation only (new and updated plans) 1,000 to
9,999 Services $1,206
(b)(3) SMA plan for operation only (new and updated plans) 10,000 or
more services $1,206

(1)  (d) Project reports


Project Type System Size Cost
(d)(1) All types complex treatment processes <100 Services $710
(d)(1) All types complex treatment processes 100 to 500 Services $1,103
(d)(1) All types complex treatment processes 501 to 999 Services $1,598
(d)(1) All types complex treatment processes 1,000 to 9,999 Services $2,204
(d)(1) All types complex treatment processes 10,000 or more Services $2,922
(d)(2) Chemical addition <100 Services $205
(d)(2) Chemical addition 100 to 500 Services $348
(d)(2) Chemical addition 501 to 999 Services $525
(d)(2) Chemical addition 1,000 to 9,999 Services $743
(d)(2) Chemical addition 10,000 or more Services $994
(d)(3) Complete new water system <100 Services $491
(d)(3) Complete new water system 100 to 500 Services $778
(d)(3) Complete new water system 501 to 999 Services $1,137
(d)(3) Complete new water system 1,000 to 9,999 Services $1,564
(d)(3) Complete new water system 10,000 or more Services $2,061
(d)(4) System modifications including new source <100 Services $348
(d)(4) System modifications including new source 100 to 500 Services $565
(d)(4) System modifications including new source 501 to 999 Services $851
(d)(4) System modifications including new source 1,000 to 9,999
Services $1,206
(d)(4) System modifications including new source 10,000 or more
Services $1,626

(1)  (f) Construction documents


Project Type System Size Cost
(f)(1) All types complex treatment processes <100 Services $710
(f)(1) All types complex treatment processes 100 to 500 Services $1,103
(f)(1) All types complex treatment processes 501 to 999 Services $1,598
(f)(1) All types complex treatment processes 1,000 to 9,999 Services $2,204
(f)(1) All types complex treatment processes 10,000 or more Services $2,922
(f)(2) Chemical addition <100 Services $205
(f)(2) Chemical addition 100 to 500 Services $348
(f)(2) Chemical addition 501 to 999 Services $525
(f)(2) Chemical addition 1,000 to 9,999 Services $743
(f)(2) Chemical addition 10,000 or more Services $994
(f)(3) Complete new water system <100 Services $633
(f)(3) Complete new water system 100 to 500 Services $919
(f)(3) Complete new water system 501 to 999 Services $1,279
(f)(3) Complete new water system 1,000 to 9,999 Services $1,709
(f)(3) Complete new water system 10,000 or more Services $2,204
(f)(4) New source <100 Services $382
(f)(4) New source 100 to 500 Services $525
(f)(4) New source 501 to 999 Services $710
(f)(4) New source 1,000 to 9,999 Services $919
(f)(4) New source 10,000 or more Services $1,172
(f)(5) System modifications <100 Services $241
(f)(5) System modifications 100 to 500 Services $382
(f)(5) System modifications 501 to 999 Services $565
(f)(5) System modifications 1,000 to 9,999 Services $778
(f)(5) System modifications 10,000 or more Services $1,027

(1)  (g) Existing system approval


Project Type System Size Cost
(g)(1) NONEXPANDING non-community water system without
treatment <100 Services $539
(g)(1) NONEXPANDING non-community water system without
treatment 100 to 500 Services $811
(g)(1) NONEXPANDING non-community water system without
treatment 501 to 999 Services $1,083
(g)(1) NONEXPANDING non-community water system without
treatment 1,000 to 9,999 Services $1,355
(g)(1) NONEXPANDING non-community water system without
treatment 10,000 or more Services $1,626
(g)(2) NONEXPANDING community system or non-community system
with treatment 100 to 500 Services $811
(g)(2) NONEXPANDING community system or non-community system
with treatment 501 to 999 Services $1,229
(g)(2) NONEXPANDING community system or non-community system
with treatment 1,000 to 9,999 Services $1,626
(g)(2) NONEXPANDING community system or non-community system
with treatment 10,000 or more Services $2,034
(g)(2) NONEXPANDING community system or non-community system
with treatment <100 Services $2,441
(g)(3) EXPANDING non-community water system without
treatment 100 to 500 Services $1,083
(g)(3) EXPANDING non-community water system without
treatment 501 to 999 Services $1,626
(g)(3) EXPANDING non-community water system without
treatment 1,000 to 9,999 Services $2,169
(g)(3) EXPANDING non-community water system without
treatment 10,000 or more Services $2,714
(g)(3) EXPANDING non-community water system without
treatment <100 Services $3,256
(g)(4) EXPANDING community system or non-community system with
treatment <100 Services $1,355
(g)(4) EXPANDING community system or non-community system with
treatment 100 to 500 Services $2,034
(g)(4) EXPANDING community system or non-community system with
treatment 501 to 999 Services $2,714
(g)(4) EXPANDING community system or non-community system with
treatment 1,000 to 9,999 Services $3,391
(g)(4) EXPANDING community system or non-community system with
treatment 10,000 or more Services $4,072