The document is a request from a Head of Department to approve a research work proposal in the Electrical Machine Lab over a 13 week period. It outlines the topics to be covered each week such as transformers, electrical machines, and power systems components. It also lists related site visits to power infrastructure each week to supplement the topics. The request is made by a Power Research Group consisting of a Head, two engineers, a teaching assistant, and four students.
The document is a request from a Head of Department to approve a research work proposal in the Electrical Machine Lab over a 13 week period. It outlines the topics to be covered each week such as transformers, electrical machines, and power systems components. It also lists related site visits to power infrastructure each week to supplement the topics. The request is made by a Power Research Group consisting of a Head, two engineers, a teaching assistant, and four students.
The document is a request from a Head of Department to approve a research work proposal in the Electrical Machine Lab over a 13 week period. It outlines the topics to be covered each week such as transformers, electrical machines, and power systems components. It also lists related site visits to power infrastructure each week to supplement the topics. The request is made by a Power Research Group consisting of a Head, two engineers, a teaching assistant, and four students.
Electrical PIET Multan. It is requested that we want to work in the Electrical Machine Lab for research purpose. So, please approve our request for favorable consideration. Performance day: Wednesday Week 1: Mutual induction, basic concepts, and Single-phase transformer. (Visit to 132 KV grid station at Punjab Foundation Housing scheme Multan on Saturday) Week 2: Autotransformer and 3-phase transformer. (Visit to Transformer Reclamation Workshop) Week 3: Electrical Machine panel. (Visit to 220 KV Grid Station) Week 4: To study motor and generator ratings, tests, and specifications. (Proposed visit to Regional Training Center MEPCO Multan) Week 5: Power circuit breaker. (Visit to Warehouse MEPCO Multan) Week 6: Overhead line model. (Proposed visit to Pira Gaib Power House) Week 7: Double Bus Bar with four Disconnectors. (Visit to 500 KV grid station NTDC Multan) Week 8: DC Shunt Motor. Week 9: DC Shunt Generator Coupled with 3-phase (Squirrel Cage). (Proposed visit to KAPCO) Week 10: DC Shunt, Series, Compound Machine Training System. (Proposed visit to Thermal Power Plant Muzaffargarh) Week 11: Variable DC Power Supply and Variable 3 phase power supply. Week 12: AC Single Phase Machine Training System. (Proposed visit to PARCO Qasba Gujrat) Week 13: AC Slip Ring/Synchronous Machine Training System. (Proposed visit to Laal Pir Thermal Power plant)