Calculation Sheet of

SUREPILE LTD Project


Date

Engineer
No

BH101 =- 300KN Axial Shear 20KN . Fixed head moment 8.2KNM


ALL-PILE CivilTech Software www.civiltech.com Licensed to DMNEWBY ALL FOUNDATIONS

PILE MOMENT vs LOADING


Pile below Ground (not to scale) Single Pile, Khead=5, Kbc=2

Depth (Zp) MOMENT -kN-m Depth (Zp)


from from
Pile Top-m -10.00 0 +10.00 Pile Top-m
0 0

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12
Lateral Slope Axial yt Slope Max.
No. Load Restraint Load at Top at Top Moment
13 (kN) (cm/cm) (kN) (cm) (cm/cm) (kN-m) 13
1 2.0 0.0 300.0 0.0 0.00 -0.4
2 6.0 0.0 300.0 0.0 0.00 -1.7
14 3 10.0 0.0 300.0 0.0 0.00 -3.3 14
4 14.0 0.0 300.0 0.0 0.00 -5.1
5 16.0 0.0 300.0 0.0 0.00 -5.2
15 6 18.0 0.0 300.0 0.0 0.00 -7.1 15
7 20.0 0.0 300.0 0.0 0.00 -8.2

Birkenhead
BH101
Figure 2

BH102 =- 300KN Axial Shear 20KN . Fixed head moment 8.4KNM


ALL-PILE CivilTech Software www.civiltech.com Licensed to DMNEWBY ALL FOUNDATIONS

PILE MOMENT vs LOADING


Pile below Ground (not to scale) Single Pile, Khead=5, Kbc=2

Depth (Zp) MOMENT -kN-m Depth (Zp)


from from
Pile Top-m -10.00 0 +10.00 Pile Top-m
0 0

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12
Lateral Slope Axial yt Slope Max.
No. Load Restraint Load at Top at Top Moment
13 (kN) (cm/cm) (kN) (cm) (cm/cm) (kN-m) 13
1 2.0 0.0 294.0 0.0 0.00 -0.5
2 5.9 0.0 294.0 0.0 0.00 -1.9
14 3 9.8 0.0 294.0 0.0 0.00 -3.4 14
4 13.7 0.0 294.0 0.0 0.00 -5.2
5 15.7 0.0 294.0 0.0 0.00 -6.2
15 6 17.6 0.0 294.0 0.0 0.00 -7.3 15
7 19.6 0.0 294.0 0.0 0.00 -8.4

Birkenhead

Figure 2