LAYOUT PLAN
SEWAGE
TREATMENT PLANT

KEY PLAN :-

13 3.75 MLD SEWAGE TREATMENT PLANT


PROCESS UNITS(SBR)
SR.NO. PROCESS UNITS SIZE/CAPACITY (LxWxSWD + FB) QTY. REMARK

12

3.75 MLD SEWAGE TREATMENT PLANT


UTILITY BUILDINGS
SR.NO. PROCESS UNITS SIZE/CAPACITY ( L x W x H ) QTY. REMARK

LEGEND :-
PLOT BOUNDARY

11 GREEN BELT

1200 WIDE PATHWAY

5000 WIDE ROAD

NOTES :-
1. ALL DIMENSIONS AND ALL LEVELS ARE IN METERS UNLESS OTHERWISE NOTED.
2. ALL WALL THICKNESS TO BE DECIDED BY CIVIL DESIGNER.
3. L = LENGTH
4. W = WIDTH
5. SWD = SIDE WATER DEPTH
6. FB = FREE BOARD.

R0 FOR APPROVAL 06/12/19 SSS CVP ----

REV. DESCRIPTION OF CHANGE DATE DRA. CHK. APPR.

Status :- FOR APPROVAL


14
Client :-
MADHYA PRADESH URBAN DEVELOPMENT
COMPANY LIMITED
Contractor :-
" ANNU INFRA CONSTRUCT INDIA PVT. LTD "
B-7-5077 , VASANT KUNJ,NEW DELHI-110070
TEL. : 32920652 , 46063652 FAX. : 26135792,26134478
E-mail : info@annuinfra.com / aicipl@gmail.com

Project Work :- 3.75 MLD SEWAGE TREATMENT PLANT BASED ON


SBR TECHNOLOGY
16 AT BADWAHA NAGAR PARISHAD IN KHARGONE DISTRICT IN
MADHYA PRADESH.

Drawing Title :-
LAYOUT DRAWING FOR
SEWAGE TREATMENT PLANT BASED ON SBR TECHNOLOGY

Drawing Number :- MPUDCL / AICIPL / 3.75MLD STP / LAYOUT / 01 Sheet No :- A1 (1 of 1)

Scale :- AS SHOWN Drawn By :- SSS Checked By :- CVP Date:- 06 / 12 / 2019


LAYOUT PLAN
Drawing Status :- FOR APPROVAL Approved By :- ---- Rev :- R0