Tra
t f
1 173
2 176.5
3 183.75
4 189.25
5 193.75
6 194.25
7 191.5
8 194
t f
1 176.8
2 181.4
3 185
4 189.8
5 193.8
6 193.4
7 193.2
MAD 4 bulan MAD 5 bulan
(178+172+168+174)/4 = 173
(172+168+174+192)/4 = 176,5 (178+172+168+174+192)/5=176,8
(168+174+192+201)/4 = 183,75 (172+168+174+192+201)/5=181,4
(174+192+201+190)/4 = 189,25 (168+174+192+201+190)/5=185
(192+201+190+192)/4 = 193,75 (174+192+201+190+192)/5=189,8
(201+190+192+194)/4 = 194,25 (192+201+190+192+194)/5=193,8
(190+192+194+190)/4 = 191,5 (201+190+192+194+190)/5=193,4
(192+194+190+200)/4 = 194 (190+192+194+190+200)/5=193,2
176.5
183.75 176.8
189.25 181.4
193.75 185
194.25 189.8
191.5 193.8
194 193.4
193.2
Tracking Signal MA (4)
RSFE Absolut Kumulatif
A E = A-F
Kumulatif Error Absolut
192 19 19 19 19
201 24.5 43.5 43.5 62.5
190 6.25 49.75 49.75 112.25
192 2.75 52.5 52.5 164.75
194 0.25 52.75 52.75 217.5
190 -4.25 48.5 48.5 266
200 8.5 57 57 323
210 16 73 73 396
Signal MA (5)
MAD tracking
19.00 1
31.25 1.39
37.42 1.33
41.19 1.27
43.50 1.21
44.33 1.09
46.14 1.24
49.50 1.47
MAD tracking
24.20 1.00
28.50 1.15
32.27 1.23
35.20 1.25
36.20 1.11
37.97 1.23
41.63 1.53