You are on page 1of 20

24/05/2021

Web: www.davysukamta.com Beberapa gempa Besar (Indonesia Barat) Setelah keluarnya of SNI 1726-2002
Email: dsp@davysukamta.com
Aceh Earthquake Mw=9.2
(December, 2004)
Pidie Jaya Earthquake Mw=6.5
(7 Desember, 2016)
Simeuleu Earthquake Mw=8.5
(11 April, 2012)
Nias Earthquake Mw=8.6
(March, 2005)
Simeuleu Earthquake Mw=8.1
(11 April, 2012)

Padang Earthquake Mw=7.6 Jambiimprovements


Earthquake Mw=6.6
Sumber: Why does the(Sept,
current code require
2009)
?
(Oct, 2009)
ASCE 41-17 + FEMA P-2006
PuSGeN 1. Mentawai
To considers recent
Earthquake great earthquakes in Indonesia
Mw=7.2
(Oct, 2010)

Tasik Earthquake Mw=7.4 Yogya Earthquake Mw=6.3


(Sept, 2009) (May, 2006)
1) Principal, Davy Sukamta Konsultan
2) Anggota Pusat Studi Gempa Nasional
3) Tim Penyusun SNI Evaluasi dan Rehabilitasi Seismik

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS USGS


Consulting Engineers Sumber: Masyhur Irsyam
Consulting Engineers

1 2

Indonesia is located
in a very active seismic region

Soft-story Effect

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

3 4

1
24/05/2021

Indonesia is located
in a very active seismic region
Dua Hal Utama dalam Perancangan
Gedung Tahan Gempa

Respons inelastik untuk rancangan tahan gempa

28 September 2018, Sulawesi EQ


Sumber: AFP 1. Besaran gaya gempa rencana
2. Detailing untuk mendapatkan daktilitas
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

5 6

FEMA P-751 Cacat Bawaan yang Sering Dijumpai


Inelastic Response for Seismic Design

Global Deficiencies
- Soft Story
- Irregularitas Vertikal: Podium
- Irregularitas Torsi
- Pounding dengan Gedung Tetangga
- Weak Story

Kekurangan pada Elemen


- Rangka Beton Non-daktail > detailing
- Bukaan Besar pada Shearwall
- Boundary Elements Tidak Terkekang
- Defisiensi pada Kekuatan & Koneksi Diafragma
- Load Path

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

7 8

2
24/05/2021

Struktur Baru vs Eksisting


SNI 1726 / ASCE 7 ASCE 41

Struktur Eksisting
- Kita tidak merancang dari awal > defisiensi bawaan
- Kita tidak dapat menetukan daktilitas
- Kita tidak dapat mengendalikan kualitas konstruksi
- Target kinerja ditentukan oleh aturan (PERDA) atau
pemilik gedung Prosedur Analisis dan Kriteria Penerimaan

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

9 10

Referensi

ASCE41-17

EVALUATION AND RETROFIT PROCESS


Provisions of this standard for seismic evaluation and retrofit are
based on a performance-based design methodology that differs
from seismic design procedures for the design of new buildings
currently specified in national model building codes and standards.
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

11 12

3
24/05/2021

SNI 1726 / ASCE-7 vs ASCE 41 Pasal 7 Prosedur Analisis dan Kriteria Penerimaan
SNI 1726 / ASCE 7: Rancangan sistem penahan
gempa didasarkan pada TINJAUAN GLOBAL - Membahas syarat pembebanan, model matematis, dan prosedur analitis.
SISTEM STRUKTUR lewat prescriptive design
dan syarat detailing komponen. Komponen Faktor R - Pasal ini berkaitan dengan pasal 2, Tujuan Kinerja.
struktur dirancang terhadap demand yang - Untuk Tier 3, seluruh komponen struktur harus dimodelkan.
diturunkan, dengan tingkat kepastian tinggi akan Faktor m
sifat dan perilakunya - Karakteristik kekakuan dan kekuatan komponen ada di pasal 8-12,
pasal 14 dan 15.
ASCE 41 mengenal cacat bawaan struktur eksisting.
- Gaya dan deformasi komponen hasil analisis dibandingkan terhadap
Rancangan dilakukan pada level SETIAP KOMPONEN.
nilai ijin pada pasal 8-12, pasal 14 dan 15.
Perilaku inelastik komponen yang tidak konsisten dalam
sistem struktur menyeluruh menyebabkan pemeriksaan - Evaluasi dan metode rehabilitasi komponen non-struktur ada di pasal 13.
kapasitas daktilitas harus dilakukan pada setiap
komponen individu
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

13 14

Strategi Rehabilitasi Seismik Soft-story Retrofit

Pendekatan umum untuk mencapai tingkat kinerja antara lain dengan


menambah kekuatan global, memperkaku struktur secara global, atau
mengurangi seismic demand dengan memasang seismic friction
dampers atau sistem isolasi seismik. Seringkali juga dengan
memperbesar kapasitas kuat lokal, meningkatkan deformabilitas dari
elemen struktur, misalnya dengan Teknik FRP jacketing.

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

15 16

4
24/05/2021

Retrofit dengan struktur tambahan:


Memperkaku struktur untuk mengurangi deformasi

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

17 18

Retrofit dengan membungkus struktur eksisting SEISMIC PROTECTION SYSTEMS

- Seismic resistant design, fixed-base structure

- Vibration controlled structure (with dampers)

- Seismically isolated structure

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

19 20

5
24/05/2021

ASCE 41-17
Existing Building
Kembangkan basis desain
Motivation for the Retrofit

Basis Desain
Apakah diperlukan peningkatan
ketahanan gempa? - Performance Objective
Level bahaya seismik
Level performa struktural
- Tipe Gedung
- Prosedur tingkat 2 atau 3
Sukarela Keharusan - SNI semula
- Tujuan retrofit - Publik / privat
- Geological hazard
- Biaya desain - PERDA - Syarat geoteknik
- Biaya konstruksi - Kategori resiko - Metodologi desain (LSP, LDP, NSP,NDP)
- Tipe Gedung - Tipe Gedung - Pengumpulan data dan lingkup uji material
- Gedung historik? Kembangkan - Gedung historik? - Syarat peer review
basis desain - Bongkar / perbaiki? - Usulan alternatif (bila ada)

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

21 22

Bab SUBJECT Prosedur Evaluasi dan Retrofit


1 General Requirements
2 Performance Objectives and Seismic Hazards
3 Evaluation And Retrofit Requirements
4 Tier 1 Screening
5 Tier 2 Deficiency-Based Evaluation And Retrofit
6 Tier 3 Systematic Evaluation And Retrofit
7 Analysis Procedures And Acceptance Criteria Serangkaian check list (konfigurasi
8 Foundations And Geologic Site Hazards
Tier 1: Screening dasar dan struktur) yang dilakukan
Procedure untuk mengidentifikasi defisiensi
9 Steel And Iron struktur
10 Concrete
Mencakup berbagai hal mulai dari Performance Objectives,
11 Masonry
Seismic Hazard, cara evaluasi, sampai prosedur analisis. Prosedur Evaluasi Tier 2: Deficiency- Analisis dan retrofit dilakukan
Architectural, Mechanical, And Electrical Components
12 Wood Light Frame dan Retrofit Based Evaluation and berdasarkan defisiensi yang
13 Mencakup
Architectural, Mechanical, And berbagai material konstruksi mulai dari baja,
Electrical Components Struktur Retrofit Procedures diidentifikasi pada Tier 1
14 Seismic Isolation beton, pasangan bata, kayu.
15 Mencakup
Design Requirements For Structures provisi penggunaan
With Supplemental Energy DissipationIsolasi Seismik dan Peredam
Tier 3: Systematic Analisis lanjut
16 System-Specific Performance Procedures Evaluation and Retrofit sistem struktur bangunan eksisting
17 Tier 1 Checklists Procedures dan retrofit.
18 Reference Documents
19 Appendix A Guidelines For Deficiency-Based Procedures

20 Appendix B Applying ASCE 41 In Building Codes, Regulatory Policies, And Mitigation Programs
21 Appendix C Summary Data sheet
22 Commentary To Standard ASCE/SEI 41-17

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

23 24

6
24/05/2021

Pasal 7 Prosedur Analisis dan Kriteria Penerimaan BATASAN PENGGUNAAN PROSEDUR TIER 1 dan TIER 2

Metode Analisis yang Diijinkan

Tier 2 > Prosedur Deficiency-based LSP, LDP

Tier 3 > Prosedur Sistematik LSP, LDP, NSP, NDP

- Pemilihan prosedur analisis


- Penentuan gaya dan deformasi
- Elemen primer dan sekunder
- Elemen Aksi Terkontrol Gaya
- Elemen Aksi Terkontrol Deformasi
- Momen guling
- Kekuatan dinding out-of-plane
- Penjangkaran peralatan

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

25 26

BATASAN PENGGUNAAN PROSEDUR TIER 1 dan TIER 2 Prosedur Analisis Tier 3

Tahapan Evaluasi:
• - Pengumpulan Data (Material Properties dan Gambar As-Built)
• - Identifikasi komponen primary dan komponen secondary
• - Kontrol gaya versus control deformasi
• - Analisis Linear (LSP,LDP) atau Nonlinear (NSP, NDP)
• - Retrofit untuk Mencapai Target Kinerja Struktur.

Linear Static Procedure


Prosedur Linear
(Tanpa Irregularitas)
Linear Dynamic
Procedure
Prosedur Analisis
Non-Linear Static
Procedure (Pushover)
Prosedur Non-Linear
Non-Linear Dynamic
Procedure (NLTHA)

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

27 28

7
24/05/2021

Ch 7.2 Persyaratan Umum Analisis Ch 7.2 Persyaratan Umum Analisis


7.2.1 Analysis Procedure: LSP, LDP, NSP, NDP 7.2.4 Configuration
7.2.2 Component Gravity Loads and Load Combinations 7.2.5 Multidirectional Seismic Effect
7.2.5.1 Concurrent Seismic Effect
Untuk Prosedur Linier 7.2.5.2 Vertical Seismic Effect
QG = 1.1 (QD + QL + QS) (7.1)
7.2.6 P-delta Effect
7.2.7 Soil-Structure Interaction
7.2.8 Overturning
7.2.9 Diaphragms, Chords, Collectors, Ties
7.2.3 Mathematical Modelling
7.2.10 Continuity. Semua komponen struktur harus terikat untuk
Asumsi dasar, torsi, komponen primer dan sekunder,
membentuk load path yang lengkap untuk mentransfer gaya inersia
kekakuan dan kekuatan, modeling fundasi, redaman
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

29 30

ASCE 41-17 ASCE 41-17


7.4.1 LSP
7.4 PROSEDUR ANALISIS
Pseudo lateral force V = C1 C 2 C m S a W (7.21)

Acceptance criteria
7.4.2.2.3 RSA Faktor Amplifikasi
7.4.1 LSP 7.4.2 LDP 7.4.2.2.4 LRHA Untuk C1 C2 > lihat tabel 7-3 7.5.2
(torsi) ps 7.2.3.2
μstrength =DCRmax /1.5 x Cm ≥ 1.0

7.4.3 NSP 7.4.4 NDP NLTHA

Acceptance criteria
7.5.

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

31 32

8
24/05/2021

ASCE 41-17
Pseudo lateral force V = C1 C 2 C m S a W (7.21) 7.4.2 LDP
7.4.2.2.3 RSA
7.4.2.2.4 LRHA

7.4.2.3.1 Modification of Demands for LDP


Semua gaya dan deformasi harus dikali faktor C1, C2
dan faktor amplifikasi Ax (7.2.3.2)

Untuk C1 C2 > lihat tabel 7-3


μstrength =DCRmax /1.5 x Cm ≥ 1.0

Acceptance criteria
7.5.2

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

33 34

Source: Erol Kalkan & Sashi Kunnath

7.4.3 NSP MODELING

Ke effective lateral stiffness


Vy effective yield strength

7.4.3.2.1
Analisis harus
mencapai 150%
target displacement

Control node
displacement
= C.o.M

7.2.5 Multidirectional
Seismic Effect > 3D Model

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

35 36

9
24/05/2021

7.4.3 NSP Target Displacement


Source: Erol Kalkan & Sashi Kunnath

Faktor Amplifikasi
(torsi) ps 7.2.3.2

C0 = Modification factor to relate spectral displacement of an equivalent single-degree-of-


freedom (SDOF) system to the roof displacement of the building multi-degree-of-freedom
(MDOF) system
C1 = Modification factor to relate expected maximum inelastic displacements to
displacement calculated for linear elastic response
C2 = Modification factor to represent the effect of pinched hysteresis shape, cyclic
stiffness degradation, and strength deterioration on the maximum displacement response

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

37 38

7.4.3 NSP Target Displacement 7.4.3 NSP Target Displacement

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

39 40

10
24/05/2021

7.4.3 NSP Target Displacement LIMITATION OF FEMA NSP

- - Restricted to single mode response, good for


2D response of low-rise structures in regular plan
- - Give erroneous result in case of:
- Higher mode effects
- Plan irregularities / torsion

> Use 3D Model, Modal Pushover Analysis (Chopra & Goel)

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

41 42

NSP menggunakan TARGET DISPLACEMENT


7.4.4 NDP NDP menggunakan GM dan NLRHA 7.4.4 NDP
ASCE/SEI 41 Generic Backbone Curve

7.4.4.1 Basis Perencanaan.

IO
LS CP

NOTE: 1.MP dipilih secara konservatif


2.MP untuk elemen berbeda mempunyai tingkat konservatisme berbeda

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

43 44

11
24/05/2021

Scaling to Sa_maxDir

7.4.4 NDP
2.4.3 Ground Motion Acceleration Histories sesuai SNI
dengan modifikasi faktor B1 sbb:
SNI 8899:2020

Target Spectrum:
MCER ganti dengan
BSE-1X atau BSE-2X MAXIMUM DIRECTION
(SNI 1726:2019, clause 11)

Modifier B1 is 1.0 for 5% damping

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

45 46

Flowchart untuk prosedur GMSM sesuai SNI 8899: 2020 Evaluation of deformation-controlled components

1.Target Spectrum
MAXIMUM
2.GMSM DIRECTION
(SNI 1726:2019
PASAL 11)
Nilai kriteria penerimaan harus disesuaikan dg ASCE41

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

47 48

12
24/05/2021

Assessment of concrete and steel rebar stresses


7.5 KRITERIA PENERIMAAN
in the core-wall

7.4.1 LSP
Acceptance criteria
7.5.2
7.4.2 LDP

7.4.3 NSP
Acceptance criteria
7.5.3
7.4.4 NDP
Nilai kriteria penerimaan harus disesuaikan dg ASCE41
7.5.1.2 Seluruh aksi dibagi atas aksi kontrol deformasi
atau kontrol gaya sesuai kurva gaya-deformasi gambar 7-4

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

49 50

DEFORMATION-CONTROLLED vs FORCE-CONTROLLED COMPONENT Kontrol Gaya versus Kontrol Deformasi


Table C7-1. Examples of Possible Deformation-Controlled and Force-Controlled Actions
Ductile Behavior Ductile Behavior Non-ductile Behavior

d≥2g e≥2g

Type 1 Curve Type 2 Curve Type 3 Curve

K. Primer DC d≥2g DC e≥ 2g Semua FC


K. Sekunder Semua FC DC f ≥ 2g DC f ≥ 2g

a Shear may be a deformation-controlled action in steel moment frame construction.


b Axial, shear, and moment may be deformation-controlled actions for certain steel and wood connections.
c If the diaphragm carries lateral loads from vertical-force resisting elements above the diaphragm level, then M and
V shall be considered force-controlled actions

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

51 52

13
24/05/2021

DEFORMATION-CONTROLLED vs FORCE-CONTROLLED COMPONENT

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

53 54

KOMPONEN PRIMER vs KOMPONEN SEKUNDER

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

55 56

14
24/05/2021

KOMPONEN PRIMER vs KOMPONEN SEKUNDER KOMPONEN PRIMER vs KOMPONEN SEKUNDER

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

57 58

7.5.1.5 Kapasitas Komponen


KOMPONEN PRIMER vs KOMPONEN SEKUNDER
Kriteria perhitungan gaya pada setiap komponen dan kapasitas deformasi
agar mengikuti pasal terkait jenis material komponen tersebut (Ps. 8-15)

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

59 60

15
24/05/2021

7.5.1.5 Kapasitas Komponen 7.5.1.5 Kapasitas Komponen


7.5.1.5.2 Prosedur Linear 7.5.1.5.2 Prosedur Nonlinear

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

61 62

7.5 KRITERIA PENERIMAAN 7.5.2 Prosedur Linear

7.5.2 Prosedur Linear LSP LDP

1.0 CP
1.3 LS atau IO

≥1.0 ≥1.0
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

63 64

16
24/05/2021

7.5 KRITERIA PENERIMAAN 7.5.3.2.2 Acceptance Criteria for Deformation-Controlled Actions for NSP or NDP

7.5.3 Prosedur Nonlinear NSP NDP Primary and secondary components shall have expected deformation capacities
not less than maximum deformation demands calculated at target displacements.
7.5.3.2.1 Unacceptable Response for NDP Primary and secondary component demands shall be within the acceptance
1. Analytical solution fails to converge, criteria for nonlinear components at the selected Structural Performance Level.
2. Predicted demands on deformation-controlled elements exceed the valid Expected deformation capacities shall be determined considering all coexisting
range of modeling, forces and deformations in accordance with Chapters 8 through 15
3. Predicted demands on force-controlled critical actions that are modeled
elastically, as defined in Section 7.5.3.2.3 exceed the expected element
capacity, or
7.5.3.2.3 Acceptance Criteria for Force-Controlled Actions for NSP or NDP
4. Predicted deformation demands on element actions not explicitly
modeled exceed the deformation limits at which the members are no Force-controlled components that are not explicitly included in the mathematical
longer able to carry their gravity loads. model with nonlinear force-deformation properties per Section 7.5.1.2 shall
satisfy Eq. (7-38). Lower-bound strengths shall be determined considering all
EXCEPTION: For Life Safety or lower Performance Levels, not more than one
ground motion per 11 analyses shall be permitted to produce unacceptable coexisting forces and deformations by procedures specified in Chapters 8 through
response. When a ground motion produces unacceptable response, the average 12, 14, and 15
response shall be computed as 120% of the median value, but not less than the
mean value obtained from the suite of analyses producing acceptable response .
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

65 66

Modeling Parameters and Numerical Acceptance Criteria for Nonlinear Procedures


7.5.3.2.3 Acceptance Criteria for Force-Controlled Actions for NSP or NDP

7.5.3.2.4 Verification of Analysis Assumptions for NSP or NDP.


In addition to the requirements in Section 7.2.14, the following verification
of analysis assumptions shall be made: Flexural plastic hinges shall not form
away from component ends unless they are explicitly accounted for in Parameter berbeda untuk balok terkendala lentur, geser,
modeling and analysis panjang lewatan tulangan atau penjangkaran tulangan

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

67 68

17
24/05/2021

Modeling Parameters and Numerical Acceptance Criteria for Nonlinear Procedures

225-tahun

Parameter untuk kolom terkendala panjang lewatan tulangan

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

69 70

225-tahun 975-tahun

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

71 72

18
24/05/2021

LOAD PATH
975-tahun

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Structural Engineers
WORKSHOP PUSKIM SEMARANG 2020

73 74

Contoh retrofit dengan isolasi dasar


Diaphragm Action
Los Angeles City Hall
Dibangun 1928 – 32 lantai
Seismic Retrofit 1998-2001
Base Isolation System

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Structural Engineers
WORKSHOP PUSKIM SEMARANG 2020 Consulting Engineers

75 76

19
24/05/2021

Pekerjaan rehabilitasi seismik pada LA City Hall Pekerjaan rehabilitasi seismik pada LA City Hall

DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS


Consulting Engineers Consulting Engineers

77 78

www.davysukamta.com
Pekerjaan rehabilitasi seismik pada LA City Hall

Indonesia Bisa!
DAVYSUKAMTA & PARTNERS DAVYSUKAMTA & PARTNERS
Consulting Engineers Consulting Engineers

79 80

20

You might also like