You are on page 1of 2

KEERTHI ENGINEERING

INITIAL PRODUCTION PART TAG


Part No: Date: Reason for IPP

Part Name: Our DC No: DETAILS OF MODIFICATION


Coustomer: Your DC No: 1. Drawing/Specification Changed
Qty: Vendor Code: 2. Quality Improvement
3. New Location
4. Subvendor Change
Detail's of modification 5.Material Change
6. Manufacturing Metho
Change 7. Manufac
Process Sequence Change 8. Mac
Change
9. Fixture Chan
10. Inspection
Method Change
11.Transportation Method / Packing Ch
12. restart of part after Discontinua
for 3 Months
1
Prepared By:
Approved By:
DOC No:
Rev No:
Date:

AILS OF MODIFICATION
awing/Specification Changed
Quality Improvement
3. New Location
4. Subvendor Change
5.Material Change
6. Manufacturing Method
nge 7. Manufacturing
ess Sequence Change 8. Machine
nge
9. Fixture Change
10. Inspection
hod Change
ransportation Method / Packing Change
2. restart of part after Discontinuation
Months
13.
ared By:
oved By:

You might also like