Personnel Hoisting Cradle Design Request

The document is an engineering request form to design cradles for personnel hoisting using cranes. It requests the design of a cradle to hoist two persons using a 30 and 13 ton Coles crane, and a cradle to hoist four persons using a Manitowoc mobile crane. The cradles are to be designed using ASME and OSHA guidelines and welding standards. An existing cradle in the craft section is available for reference. The priority of the request is listed as routine high.

Uploaded by

Hamza Nouman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Personnel Hoisting Cradle Design Request

The document is an engineering request form to design cradles for personnel hoisting using cranes. It requests the design of a cradle to hoist two persons using a 30 and 13 ton Coles crane, and a cradle to hoist four persons using a Manitowoc mobile crane. The cradles are to be designed using ASME and OSHA guidelines and welding standards. An existing cradle in the craft section is available for reference. The priority of the request is listed as routine high.

Uploaded by

Hamza Nouman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Form # PTE-01 / Rev.

00

ENGINEERING REQUEST
(FOR JOBS NOT INVOLVING PROCESS CHANGE)

SUBJECT DESIGN CRADDLE FOR PERSONNEL HOISTING USING CRANES AS PER BELOW DETAIL.

Details (Why Required):


I) Design a cradle, for Two persons hoisting using 30 and 13 Ton COLES crane (Available in PFL).
ii) Design a cradle for Four persons hoisting using Manitowoc mobile crane.(Available in PFL).

This request has been initiated ref. to SOC MOM No.08 Dated: 08/10/2011

PROPOSED SOLUTION
Design cradle using ASME and OSHA guidelines.
Welding as per ASME and AWS standards.

INFORMATION AVAILABE/DOCUMENTS ATTACHED


Existing cradle available in PFL craft section.

PROPOSED SKETCH:

Priority: URGENT ( ) ROUTINE HIGH ( ) ROUTINE LOW ( )


(To be defined by MM)
SERIAL NO.
INITIATOR REVIEWED BY RECOMMENDED BY APPROVED BY ASSIGNED TO
ROUTE (For Project Unit only)
Area Engineer UM Plant Maint. Manager TSM UM Project

NAME
MNL

DATE

INITIALS