Height 1.80 m
Spacing of Column 3.00 m
Column C-1 4-12mm ØRSB 10mm 2@50, 6@100, rest 200
Base 0.20 m
Height 0.30 m
Column C-2 6-12mm ØRSB 10mm 2@50, 6@100, rest 200
Base 0.30 m
Height 0.30 m
Foundation
Footing F-1 0.80 m
Foundation Depth 1.20 m
Foundation Thickness 0.30 m
Bar X 5.00 16mm
Bar Y 6.00 16mm
Footing F-2 1.00 m
Foundation Depth 1.00 m
Foundation Thickness 0.30 m
Bar X 4.00 12mm
Bar Y 4.00 12mm
Wall Footing
Base 0.40 m
Thickness 0.20 m
2-10mm @ Continuous
10mm-200mm Spacing @ Transverse
Walls
10mm bars @ every 3 layers Horizontal
10mm bars @ 600mm spacing vertical
No of Column 11.00
Total Height 2.80 m
one column 6-12mmØ RSB
L 3.00
No. of 12mm RSB 3.00 pcs
ties 20.00 sets
20 pcs of 1m 3.33
No. of 10mm RSB 4.00 pcs
No. of Fooring 11.00
Bar X 0.70 4 pcs
Bar Y 0.70 4 pcs
total 5.60
No. of 12 mm RSB 1.00 pcs per col.
No. of 12 mm RSB 11.00 pcs
Wall footing
L 30.60
No. of Transverse 153.00 pcs
No. of 10mm RSB 31.00 pcs
Continuous Bars
No. of 10mm RSB 11.00 pcs
Column 2.77
Footing 2.11
Wallfooting 2.45
Summarry
CHB 4" 884.00 pcs
No. of 10mmRSB 101.00 pcs
No. of 12mmRSB 15.00 pcs
Cement 74.00 pcs
Sand 3.67 cu.m.
Gravel 7.33 cu.m.