72.)A full time construction inspector hired by the owner for assisting in
supervision of the project work.
77.)The architect has the power to issue or withhold the request for payment
of the contractor. He may recommend withholding of payment if:
a. 6% of CC b. 7% of CC c. 8% of CC d. 12% of CC
82.)The cost of the completed structure to the owner including MPE and other
systems attached to the building and all items indicated in the drawings
designed by or specified the architect and his consultant.
c. Confer with the client on project requirements and secures sufficient data
base.
d. Drink beer.
a. 6% of CC b. 7% of CC c. 8% of CC d. 12% of CC
a. 6% of CC b. 7% of CC c. 8% of CC d. 12% of CC
a. 6% of CC b. 7% of CC c. 8% of CC d. 12% of CC
d. Construction Phase
92.)In BP 344, what is the preferred height of door knobs and other hardwares
from the finished floor?
94.)Minimum clear distance of an aerial service line from the crown of the
road.
97.)In BP 220, what is the minimum area of shelter component for socialized
housing?
a. UAP Doc 200 b. UAP Doc. 208 c. UAP Doc. 209 D. UAP Doc. 210
a. PD 3008 b. PD 1380
c. PD 1308 d. PD 1300