UNIT RATE ANALYSIS (UPA) FORMAT

Work Item : 1.3 Ceciling Finish


Unit : pc
Estimated Quantity (Q) : 1000.00 Unit Rate: 8.21

Local Currency (BDT)


Ref. No. Equipment Costs Q'ty Unit
Unit Rate Amount
1 Equipment Costs 5.00 pc 0.00
2 transport 1.00 0.00
3 0.00
4 0.00
5 0.00
Sub-total (1) 0.00

Local Currency (BDT)


Ref. No. Labor Costs Q'ty Unit
Unit Rate Amount
1 Skilled 2.00 person 750.00 1500.00
2 Unskilled 3.00 person 550.00 1650.00
3 0.00
4 0.00
5 0.00
Sub-total (2) 3150.00

Local Currency (BDT)


Ref. No. Material Costs Q'ty Unit
Unit Rate Amount
1 Color paint 1.00 liter 3500.00 3500.00
2 bag 0.00
3 Water 120.00 liter 5.00 600.00
4 Cement 1.00 bag 480.00 480.00
5 Sand 12.00 cft 40.00 480.00
Sub-total (3) 5060.00

Local Currency (BDT)


Ref. No. Other Direct Costs Q'ty Unit
Unit Rate Amount
1 0.00
2 0.00
3 0.00
4 0.00
Sub-total (4) 0.00

(5) Sub-Total Amount of Specification Item: (1)+(2)+(3)+(4) = 8210.00