Professional Documents
Culture Documents
The loading coming in the Anchor Loop which creates uplift force and shear force in
the bolts has been taken from the already approved document for “Design of
Anchor Foundation” With Document No. DOC/CP-105/DGN/DC/0153 Approved
Vide Engineer Letter no. 105-LTR-PMC-OHE-0246-E1 Dated 30.09.2020.
The stability of the U-Bolt has been checked for the maximum tension of 3600 Kg
developed in the Terminating Wire. Hence, same U-Bolt can be used for lesser value
of tension developed in the Terminating Wire.
STABILITY CALCULATION OF ANCHOR
LOOP (U-BOLT)