Professional Documents
Culture Documents
Project: CP -
105 00 28-06-21
1. INPUT DATA
Actual Axial Stress in each Bolt 1800.3 X 9.81 / 627.4 = 28.15 N/mm2
Actual Shear Stress in each Bolt 3600 X 9.81 / 627.4 = 56.29 N/mm2
Actual Axial Stress in each Bolt Actual Shear Stress in each Bolt
+ < 1.4
Permissible Axial Stress in Bolt Permissible Shear Stress in Bolt
28.15 56.29
+ = 0.94 < 1.4
120 80
Hence Provide an Embedment Length of 400 mm Inside the Concrete and Standard Length of Bolt / Anchor Loop Above the Concrete Shall be
Provided as Shown in the Drawing no………...
Grout Hole Dia. Shall be Provided 50 mm and Grout Hole Depth Shall be Provided 450 mm Inside the Concrete.
The Grouting Material To Be Used To Fix The Bolt / Anchor Loop Inside The Concrete Shall Have Minimum Bond Stress Equivalent To M35 Grade Of
Concrete , Same Which Has Been Used In Bridge Mast Supporting Arrangement At Bridge No. 26.
Anchor Load, F
F1 E
a
F2
32 MM DIA U-BOLT
Embedded Length of the Bolt inside the Concrete ,H
Parapet Wall
Fp' Fp'
REV DATE
Project: CP -
105 00 28-06-21
APPENDICES
APPENDIX A
APPENDIX B
APPENDIX C