Location case Size of Mast Vertical Load(Kg)

0/22 Double cant+BWA B-300(S) x 400 4100


0/26 Double cant+BWA B-250(S) x 400 4000
0/24 Triple cantilever B-250(S) x 400 1600
1/21 Double cantilever+BWA B-300(S) x 400 4000
1/23 Outside curve+310m+Triple bracket B-250(S) x 400 1600
1/25,1/28,1/29 Tangent+Triple cantilver+Obligatory B-250(S) x 400 1600
1/33 Double cant+BWA+Obligatory B-250(S) x 400 4000
Outside curve-220m radius+Double B-300(S) x 400
1/50,1/52 cant+BWA 4100
1/54 Outside-220m radius+Triple cant+AEWA B-300(S) x 400 2600
Inside curve-220m Radius+Triple B-300(S) x 400
1/55,1/58 cant+BWA 4200
1/62 Triple cant+FTA+Tangent B-300(S) x 400 3900
ICD/1006 Tangent+Triple cantilver+Obligatory B-300(S) x 400 1700

# Sensitivity: LNT Construction Internal Use


Bending Moment(Kgm)
13500 40
10800 30
10300 -20
14000 40
11500 40
10600 30
11900 40

15500 40
13700 40 need to remove FTA anchor from mast

12100 -30
12900 40
13400 40