Session 2 – Communication
June 29, 2021 | Larry Muir
© Copyright 2021
American Institute of Steel Construction 1
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
© Copyright 2021
American Institute of Steel Construction 2
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Communication
All communication is imperfect.
10
Signal-to-Noise
Learning & Teaching INFORMATION
SOURCE TRANSMITTER
Communication
RECEIVER DESTINATION
Claude Shannon. “A mathematical
I have become convinced that no one can teach anyone else theory of communication”. Bell System
Technical Journal, 1948.
anything. MESSAGE
SIGNAL RECEIVED
SIGNAL MESSAGE
I can introduce ideas, and you can choose to pursue them and NOISE
SOURCE
integrate them into your worldview or not. CODE
Shannon’s model applied to Codes
COMMITTEE THE CODE THE ENGINEER
Presentations like these are the beginning of the process not the INTENT
end.
11 NOISE NOISE 12
SOURCES SOURCES
© Copyright 2021
American Institute of Steel Construction 3
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Signal-to-Noise
13 14
Responsibility
Communication in Connection Design Responsibility
Much of this session concentrates on communication between the Rule #1: Connection design must be overseen by a professional
Engineer of Record and the delegated connection design engineer. engineer.
Since these two engineers work for different parties and may have no
relationship beyond the current project, communication can be • Responsibility must be defined:
especially challenging. – Relative to the performance of tasks
– Adequacy of design within the parameters set
Even when main member design and connection design are both
performed within a single company the two functions may be Detailers cannot practice engineering and cannot be responsible
performed by different individuals or groups and therefore the for assessing the adequacy of design.
communication issues discussed may still be applicable – though
15 16
perhaps to a lesser extent.
© Copyright 2021
American Institute of Steel Construction 4
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Responsibility Responsibility
Responsibility Responsibility
Delegated connection engineers (delegatees) are responsible for In my experience as a delegated connection engineer, it can
designing connections to satisfy the requirements specified by often be difficult to get complete and reliable information from
the Engineer of Record. Engineers of Record.
Responsibility Responsibility
Responsibility Responsibility - Clearly Stated
I am not a lawyer, but I suspect that no amount of fancy language Specification Section B1: “The design of members and
can relieve the Engineer of Record of responsibility for impact of
connections shall be consistent with the intended behavior of
connection details on the overall structural performance of the the framing system and the assumptions made in the structural
project. analysis.”
Therefore, providing complete and reliable information would seem
to be in the best interest of Engineers of Record.
19 20
© Copyright 2021
American Institute of Steel Construction 5
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Responsibility Responsibility
Responsibility - Clearly Stated Responsibility
Specification Section B1: “The design of members and In order to ensure that the design of connections is consistent
connections shall be consistent with the intended behavior of with the intended behavior the EoR can place restrictions on the
the framing system and the assumptions made in the structural types of connections that are permitted.
analysis.”
Indicating that connections shall comply with connections in the
CoSP Commentary: “From the inception of this Code, AISC and Manual is not useful when the conditions that must be designed
the industry in general have recognized that only the owner’s are not addressed in the Manual. In such cases this can result in
designated representative for design has all the information situations where a connection that looks like something in the
necessary to evaluate the total impact of connection details on Manual is used to address a condition it is not well-suited for.
the overall structural design of the project.” 21 22
Responsibility Responsibility
Responsibility - Clearly Stated –
Shared Responsibility In a Few States
Only the EoR has all the information necessary… New York provides some good requirements:
“(i) such specifically defined design work shall be limited to
AND project components ancillary to the main components of the
project”
The EoR has a responsibility to provide sufficient information…
© Copyright 2021
American Institute of Steel Construction 6
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Responsibility Responsibility
Responsibility - Clearly Stated –
In a Few States
Responsibility - Logic Check
New York provides some good requirements: Someone must be responsible for the design of every aspect of
“(iii) the design [shall perform] in accordance with performance the project.
specifications established by the delegator”
Someone must be responsible for ensuring that someone is
“(v) the delegator shall be required to review… for conformance responsible for the design of every aspect of the project.
with the established specifications and parameters…”
If it is not clear who is responsible and you perceive that others
“(vi) the delegator shall… determine that the design… conforms perceive you are responsible and you disagree, then it seems like
to the overall project design…” a good idea to clear up the potential misunderstanding.
25 26
CoSP CoSP
Code of Standard Practice
• The AISC Code of Standard Practice (CoSP)
forms the basis of structural steel
Code of Standard Practice construction contracts.
for Steel Buildings • It sets forth criteria for the trade practices
involved in steel buildings, bridges and
and Bridges other structures.
27 28
© Copyright 2021
American Institute of Steel Construction 7
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
CoSP CoSP
Code of Standard Practice Three Options
• The CoSP is developed by a committee, Section 3.1.1 requires the owner’s designated representative for design (EoR)
to indicate one of three options for each connection:
representing various aspects of the
structural steel construction industry. Option 1: Complete connection design shown in the structural
design documents.
29 30
It cannot be said enough, detailers cannot practice engineering and • The EoR is the final authority.
cannot be responsible for assessing the adequacy of design.
• Section 4.4 of the CoSP states, “The owner’s designated
Under Option 2 detailers are paid to draw pretty pictures of representative for design is the final authority in the event of
connections that will fit-up and are generally consistent with
“reference information as approved by the owner’s designated a disagreement between parties regarding the design of
representative for design”. connections to be incorporated into the overall structural
steel frame.”
31 32
© Copyright 2021
American Institute of Steel Construction 8
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
CoSP CoSP
Required Information Substantiating Connection Information
Section 3.1.1 - The structural design documents and If you are performing connection design, you should always
specifications must define the following criteria : provide Substantiating Connection Information, even if it is not
required by the contract.
• Restrictions on the types of connections that are permitted.
• Loads sufficient to allow the design of the connection details while Restricted
preparing the approval documents.
If you are delegating connection design you should always
• Whether the loads are given at the service-load level or the factored-load
level. require and review Substantiating Connection Information.
• Whether LRFD or ASD is to be used in the design of connection details.
• What substantiating connection information, if any, is to be provided.
ASD
35 36
© Copyright 2021
American Institute of Steel Construction 9
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Avoiding Avoiding
Problems
Communication Is the Key Problems Communication Is the Key
CONTRACTURAL
GENERAL
FABRICATOR
CONTRACTOR
ENGINEER GENERAL FABRICATOR’S
FABRICATOR
OF RECORD CONTRACTOR ENGINEER
© Copyright 2021
American Institute of Steel Construction 10
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Avoiding
Communication Is the Key Problems Communication Is the Key
• Knowledge is Power.
CONTRACTURAL
• To be useful knowledge must be communicated and shared. GENERAL
FABRICATOR
CONTRACTOR
• There can sometimes be a perception that maintaining power
requires maintaining control of communication.
• For contractual considerations contractors tend to insert
ENGINEER TECHNICAL FABRICATOR’S
themselves into the path of technical communication. OF RECORD ENGINEER
Resolving
Problems When Problems Arise
Discrepancy: an unexpected difference, esp. in two
amounts or two sets of facts or conditions,
which suggests that something is wrong
Communication Is the Key and has to be explained.
44
© Copyright 2021
American Institute of Steel Construction 11
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Resolving Resolving
Problems Discrepancies Problems Communication Is the Key
CONTRACTURAL
GENERAL
Discrepancies are addressed in the Code of Standard Practice. CONTRACTOR
FABRICATOR
TECHNICAL FABRICATOR’S
EoR
ENGINEER
45
Resolving Resolving
Problems Communication Is the Key Problems Communication Is the Key
CONTRACTURAL CONTRACTURAL
GENERAL GENERAL
FABRICATOR FABRICATOR
CONTRACTOR CONTRACTOR
The Connection Design Engineer Per Section 3.3 of the CoSP the
notifies the Fabricator. Fabricator promptly notifies the
General Contractor of the
discrepancy.
47 48
© Copyright 2021
American Institute of Steel Construction 12
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Resolving Resolving
Problems Communication Is the Key Problems Communication Is the Key
CONTRACTURAL CONTRACTURAL
GENERAL GENERAL
FABRICATOR FABRICATOR
CONTRACTOR CONTRACTOR
49 50
Resolving Resolving
Problems Communication Is the Key Problems Communication Is the Key
CONTRACTURAL CONTRACTURAL
GENERAL GENERAL
FABRICATOR FABRICATOR
CONTRACTOR CONTRACTOR
51 52
© Copyright 2021
American Institute of Steel Construction 13
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
Vigilance Vigilance
Vigilance Vigilance
Acting or not acting on the situation Acting or not acting on the situation
• Verify do not assume • Try to keep commercial and technical issue separate
• Most people want to do a good job – Assume the best • Be willing and able to defend your design decisions
• Approach controversies • Accept that you may not have perfect information.
• As potential misunderstandings
• An opportunity to learn
• An opportunity to educate
53 54
© Copyright 2021
American Institute of Steel Construction 14
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
© Copyright 2021
American Institute of Steel Construction 15
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
What
forces? Providing Forces
Providing Loads Whether the connection design will be handled by the EOR or
delegated to another party, the clear and accurate
communication of connection design forces is essential.
63 64
© Copyright 2021
American Institute of Steel Construction 16
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
What What
forces? Providing Forces forces?
What Forces?
The CoSP does not require the fabricator to be provided with all
of the loads, or even loads that satisfy equilibrium.
• Common forces from analysis
• Beam end vertical shears
It merely requires that sufficient information be provided. • Member axial loads (tension and compression - incl. transfer
forces)
For other than the simplest of conditions, everyone’s life is easier • Moments
if the fabricator is provided with loads that satisfy equilibrium or • Less Common forces from analysis
at least that make sense. • Beam end horizontal shears
• Torsion
65 66
What What
forces? Providing Forces forces?
Reporting Shear Loads
Providing actual forces rather than envelope (maximum) forces
or written instructions will in most cases provide more
economical connections and will also minimize
misunderstandings.
© Copyright 2021
American Institute of Steel Construction 17
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
What Common Contract Language for Shear Connections What Do Not Require Design Based On UDL
forces? forces? (Maximum Uniformly Distributed Load the Beam Can Support)
1. All shear connections shall contain the maximum possible Overestimation (From Part 2 of the Manual):
number of rows of bolts;
2. Design all shear connections for ½ UDL; 1. When beams are selected for serviceability considerations or
3. Design all shear connections for the shear capacity of the for shape repetition, the uniform load tables will often result
beam;
4. Minimum design loads (ASD) for standard rolled shapes, unless
in heavier connections than would be required by the actual
noted otherwise. design loads.
W8 C8 10 kips W21 65 kips 2. When beams have relatively short spans, the uniform load
W10 C10 15 kips W24 75 kips
W12 C12 25 kips W27 90 kips tables will often result in heavier connections than would be
W14 C15 35 kips W30 125 kips required by the actual design loads….
W16 45 kips W33 140 kips
W18 55 kips W36 175 kips
69 70
What Do Not Require Design Based On UDL Both of these beams are designed based on UDL requirements.
forces? (Maximum Uniformly Distributed Load the Beam Can Support)
© Copyright 2021
American Institute of Steel Construction 18
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
The end connection of the supported beam has nearly twice the It doesn’t make sense --- AND IT ISN’T SAFE.
capacity of the end connection of the supporting beam.
73 74
o
r
What What
P
l
a
n
forces? forces?
75 76
© Copyright 2021
American Institute of Steel Construction 19
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
o
o i
r o
What What
P n
l A
a A
n
forces? forces?
77 78
What What
forces?
M1A1 “ABRAMS” MAIN BATTLE TANK forces? Industrial Floor Load
63 TONS
79 80
© Copyright 2021
American Institute of Steel Construction 20
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
What What
forces? Reporting Vertical Brace Loads forces? Reporting Vertical Brace Loads
• Provide actual loads. Do not require connections to develop
the strength of the brace.
• Provide both tension and compression loads
– Some limit states may apply to only one condition (block
shear, buckling) and could affect the final design.
• Provide Transfer Force
81 82
What What
forces? Reporting Transfer Forces forces? Transfer Forces
Good resources available from AISC: • The term Transfer Force is not defined in the glossary for
either the Code of Standard Practice or the Specification for
• Design Guide 29, Appendix D (aisc.org/dg – free download for Structural Steel Buildings.
AISC members)
• A possible definition: A force that must be transferred from
• Demystifying Connection Design and Transfer Forces [N59A] one element to another through connection elements and
(aisc.org/educationarchives – free to view) whose magnitude and direction cannot be ascertained from
the maximum member end forces.
83 84
© Copyright 2021
American Institute of Steel Construction 21
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
• A transfer force is not the member force (the axial load in the
member).
85 86
What
forces?
Transfer Forces Transfer Forces
© Copyright 2021
American Institute of Steel Construction 22
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
What
forces?
Transfer Forces What
forces?
Transfer Forces
TF
89 90
What What
forces? Reporting Moment Connection Loads forces? Reporting Moment Connection Loads
91 92
© Copyright 2021
American Institute of Steel Construction 23
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
The The
Future In the Not Too Distant Future Future Warning Signs???
Computers have increased productivity and freed engineers from
much of the drudgery of tedious calculations but have also tended
The 2022 Specification will likely include requirements for to put distance between engineers and their designs.
design drawings and approvals that have historically been
addressed in the Code of Standard Practice. “Fast track” projects have become increasingly popular but
complicate communication.
Communication of design requirements, review and approval are
directly related to ensuring safety. These factors and others have changed
the role of engineers in our industry
and have subjected them to
93 tremendous pressures.
The The
Future Warning Signs??? Future Warning Signs???
In my mind the 2022 changes were put in place to require some There is some lower limit to both the amount of work and
engineers (who might do otherwise) to conform to acceptable responsibility involved with structural projects.
standards of engineering ethics and to make available to most
engineers (who want to do the right thing) a defense against Various means can be used to try to move
mounting pressures to do the wrong thing. these factors around, but one should not
assume that they can be made to disappear.
It is a Band-Aid.
They do not.
“I'm worried about you; I'm worried about me.
The curves around midnight aren't easy to see.” “There ain’t no free lunch.”
~~~ John Stewart 96
© Copyright 2021
American Institute of Steel Construction 24
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
The The
Future Warning Signs??? Future Problems Brewing???
These comments are included because they are important. To prevent problems you must:
1. Observe the potential problem.
They are not easily addressed and cannot be addressed sufficiently 2. Understand the significance.
in this Night School. 3. Act.
OH NO!!! HOMEWORK!!!
Read:
• Specification Section B1 & its Commentary
• Specification Section B3.4 & its Commentary
Thank you!
• Chapter 1 of Design Guide 29
© Copyright 2021
American Institute of Steel Construction 25
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
• All WFH individuals associated with a group registration will be issued a One certificate will be issued at the conclusion of all 8 sessions.
certificate.
• All individuals attending at your connection: you will receive an email on how
to report their attendance from: registration@aisc.org.
• Be on the lookout: Check your spam filter! Check your junk folder!
• Completely fill out online form. Don’t forget to check the boxes next
to each attendee’s name!
© Copyright 2021
American Institute of Steel Construction 26
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication
© Copyright 2021
American Institute of Steel Construction 27
AISC Night School 26 Developing an Eye for Connection Design
June 29, 2021 Session 2: Communication