You are on page 1of 4

LAMPIRAN / ATTACHMENT

A-11 FOTO KEMAJUAN PEKERJAAN / A-11 WORK PROGRESS PHOTO


1. PAKET 1 / PACKAGE 1
Location
Buiding Work (ADMI E&F Building
Area)

Date
08 March 2021

Description

Installation of HF 32W – Recessed


Metal Louver (Lighting) on E & F
Building 1st Floor

Location
Buiding Work (ADMI Building Area)

Date
09 March 2021

Description
Checklist and Casting Concrete
Lightening Protection System
Foundation 003 (LPS-003) for ADMI
Area

Location
LAMPIRAN / ATTACHMENT

A-11 FOTO KEMAJUAN PEKERJAAN / A-11 WORK PROGRESS PHOTO


1. PAKET 1 / PACKAGE 1
Buiding Work (ADMI E&F Building
Area)

Date
10 March 2021

Description
Checklist and Casting Concrete
Casting of Lightening Protection
System 002 (LPS-002) on ADMI Area
LAMPIRAN / ATTACHMENT

A-11 FOTO KEMAJUAN PEKERJAAN / A-11 WORK PROGRESS PHOTO


2. PAKET 2 / PACKAGE 2
Location
Buiding Work (ADMI A1 & A2
Building Area)

Date
11 March 2021

Description
Test and Commisioning Fire Alarm
System on ADMI Building A1 & A2
Area

Location
Building Work (ADMI A1 & A2
Building Area)

Date
12 March2021

Description
Test and Commisioning Wiring
Device and Receptacle on ADMI
Building A1& A2 Area
LAMPIRAN / ATTACHMENT

A-11 FOTO KEMAJUAN PEKERJAAN / A-11 WORK PROGRESS PHOTO


2. PAKET 2 / PACKAGE 2
Location
Truck Waiting Area

Date
13 March 2021

Description
Check all Heat and Smoke Sensor for
Fire Alarm System on OM & FE
Building