Professional Documents
Culture Documents
1 Masonry Works (Brick wall : Hebbel 100x200x600, Mortal 2 Ceramic Wall (Ceramic Tile 200x300)
Trowel, Paint)
1.1 The wall surface shall be tidied up (Picture 1.1) 2.1A The ceramic grout will be repaired
2.1B The ceramic grout will be repaired 2.1C The ceramic grout will be repaired
DESCRIPTION :
Site Inspection by DGST, PatimOne Consult and PTRPW
Result: Site Inspection
Location: Reclamation Area - ADMI BUILDING B
Date/Period : Tuesday, 23 March : 02 : 00 PM - 05 : 00 PM Page : 1 of 5
ADMI BUILDING B
The connection between the wall and the floor shall The connection between the wall and the floor
3.1B be tidied up 3.1C shall be tidied up
The connection between the wall and the floor shall The connection between the wall and the floor
3.1D be tidied up 3.1E shall be tidied up
The connection between the wall and the floor shall The connection between the wall and the floor
3.1F 3.1G
be tidied up shall be tidied up
DESCRIPTION :
Site Inspection by DGST, PatimOne Consult and PTRPW
Result: Site Inspection
Location: Reclamation Area - ADMI BUILDING B
Date/Period : Tuesday, 23 March : 02 : 00 PM - 05 : 00 PM Page : 2 of 5
ADMI BUILDING B
3.2B The flatness of the wall surface will be repaired 3.2C The flatness of the wall surface will be repaired
3.3 Spelling on the wall surface will be repaired 3.4A The walls in the window area will be repaired
DESCRIPTION :
Site Inspection by DGST, PatimOne Consult and PTRPW
Result: Site Inspection
Location: Reclamation Area - ADMI BUILDING B
Date/Period : Tuesday, 23 March : 02 : 00 PM - 05 : 00 PM Page : 3 of 5
ADMI BUILDING B
3.4B The walls in the window area will be repaired 3.4C The walls in the window area will be repaired
3.5 Spalling on the wall surface will be ripaired 3.6A The walls in the window area will be repaired
3.6B The walls in the window area will be repaired 3.6C The walls in the window area will be repaired
DESCRIPTION :
Site Inspection by DGST, PatimOne Consult and PTRPW
Result: Site Inspection
Location: Reclamation Area - ADMI BUILDING B
Date/Period : Tuesday, 23 March : 02 : 00 PM - 05 : 00 PM Page : 4 of 5
ADMI BUILDING B
4 Exterior Wall Finish (Fiber Reinforced Cement FRC t=18
Siding Panel)
4.1A The joint between exterior wall shall be repaired 4.1B The joint between exterior wall shall be repaired
4.1C The structural steel shall be covered with GRC 4.1D The jonit between exterior wall shall be repaired
DESCRIPTION :
Site Inspection by DGST, PatimOne Consult and PTRPW
Result: Site Inspection
Location: Reclamation Area - ADMI BUILDING B
Date/Period : Tuesday, 23 March : 02 : 00 PM - 05 : 00 PM Page : 5 of 5