Item No.

Description
B-SUPER STRUCTURE
1. MASONRY WORK
1.1 500mm thick hard Trychatic or equivalent stone masonry foundation wall well placed, dressed, & pointe
Total to summary
2. HCB WORK
2.1 400mm+400mm*1500mm HCB vertical post "class B" bedded in cement sand mortar 1:3 both side left fo
Total to summary
3. CONCRETE WORK
3.1 Construction of reinforced concrete class C-20 with minimum cement content of 320kg/M3 well spread,
3.2 Apply mass concrete copping of class C-20 with min. cement content of 320kg/M3 at the top of masonar
3.3 Formwork in vertical columns & coppings
3.4 Steel reinforcement for compound enterance work according to structural drawing, price include cutting
a) 8mm diameter
b) 14mm diameter
Total to summary
4. FINISHING
4.1 Apply three coats of plastering in cement sand mortar (1:3). Price shall include pre-cleaning and prepara
a) To all surfaces of vertical HCB posts & copping
b) To columns
4.2 Pointing all surfaces of masonary wall above ground level in cement sand mortar (1:3)
Total to summary
5. PAINTING
well placed, dressed, & pointed above ground level bedded in cement mortar mix (1:4)

and mortar 1:3 both side left for plastering

tent of 320kg/M3 well spread, leveled and filled in to formwork and vibrated around steel reinforcement; price include three c
20kg/M3 at the top of masonary wall, HCB vertical posts & columns; Price shall include preparing, placing, & shapping as per wo

l drawing, price include cutting, bending, placing in position and tying wire

lude pre-cleaning and preparation of the surface.

mortar (1:3)
orcement; price include three coat of plastering & three coats of plastic emulsion paing to all surfaces of the column
g, placing, & shapping as per working drawing
faces of the column