Professional Documents
Culture Documents
CURRICULUM VITAE
PERSONAL DATA
Name : AMAN GIMIN
Place Date of Birth : Karawang 14 july 1973
Nationality : indonesia
Sex : Male
Religion : Moslem
Marital : Maried
Present Address : Kerajan remaja Rt 01/04, Karawang West Java 41373
Phone : 085693263517
Education : SMPN 1 TIRTA MULYA KARAWANG (1990)
SDN KARAJAN 1 CIKAMPEK (1987)
EXPERIENCE
1. TRUBARABIA (Saudi Arabia)Qurayyah Combine Cycle Power Plant
Period: from Jul 16,2012 up to Jul 16,2013
Detail Job: Supervisor Millwright
Install & setting Fixator, Turbine, Generator,Feed Water
Pump and Flushing Lube Oil
2. TRUBARABIA (Saudi Arabia)Riyadh Simple Cycle Power Plant 24 x 60 MW
Period: from Aug 10,2009 up to Jun 10,2012
Detail Job: Supervisor Millwright
Alignment Turbine Generator, Motor Pump, Install Cooling Water
3. TRUBARABIA (Saudi Arabia)Qurayyah Combine Cycle Power Plant
Period : from Dec 12,2007 up to Jul 26,2009
Detail Job: General Foreman Millwright
Setting Fixator Padding,Turbine,Generator,Encloser and Alignment Cooling Water
Pump
4. TRUBARABIA (Saudi Arabia)Shoiba Steam Power Plant Stage II
Period : from Jul 25,2006 up to Dec 10,2007
Detail Job: Foreman Millwright
Install and Alignment Feed Water Pump,Install Piping Small Bore
5. TRUBARABIA (Saudi Arabia)Madina Bulk Plant Project
Period : from Jan 08,2006 up to Apr 24,2006
Detail Job: Mechanical Fitter
Padding & Install Motor Pump in area Pump House,Install Piping
6. TRUBARABIA (Saudi Arabia)Al Safi Danone Milk & Laban Project
Period : from Mar 16,2004 up to Dec 21,2004
Detail Job: Mechanical Fitter
Install & Alignment Motor Pump,Install Tank and Install Piping
CURRICULUM VITAE
7. TRUBA JURONG ENGINEERING (Saudi Arabia)Al Safi Danone Milk & Laban Project
Period : from Apr 03,2003 up to Dec 21,2003
Detail Job: Mechanical Fitter
Mixer Tank,Pump,Piping and Commissioning
8. PT. KAHATEX(BANDUNG)
Period : from Jun 18,2001 up to Sep 18,2001
Detail Job: Mechanical /Millwright
Install & Alignment Motor Pump, Assembling Machine, Sewing Machine
9. PT.ITI(THAIWAN)Formosa Aroma 2 ISBL Project Taiwan
Period : from Apr 08.1999 up to Sep 03,1999
Detail Job: Mechanical /Millwright
Fin & Fan Cooler,Levelling Vessel Exchanger
10. PT.DAELIM(MALAYSIA)Peninsular Gas Utilization Project
Period : from May 22,1998 up to Nov 21,1998
Detail Job: Millwright
Fin & Fan Cooler, Alignment Compressor Pump, Commissioning
11. PT.PBI(IRIAN JAYA)Freeport Mine Expansion Project
Period : from Aug 15,1997 up to Feb 04,1998
Detail Job: Millwright
Assembling Bo Mill & Sag Mill
12. PT.AIIG(SIDOARJO)AIIG Project
Period : from May 05,1996 up to Sep 25,1996
Detail Job: Millwright
Install Recycle Compressor Pump, lox tank and Alignment
13. PT.FSW(CIKARANG)Paper Machine 3 Cikarang Project
Period : from Nov 10,1995 up to Feb 26,1996
Detail Job: Millwright
Install Conveyor & Vacuum Pump
14. PT.TRUBA JURONG ENGINEERING(PALEMBANG)Bukit Asam Power Stasion Project
Period : from Sep 18,1995 up to Oct 30,1995
Detail Job: Millwright
Insall & Alignment Feed Water Pump, Change Barring Compressor, Mechanical Seal