You are on page 1of 3

DAILY OFFICE CLEANING CHECKLIST

Project ID : PA 2020 C 012 G - DN071 - P02

Date & Time: Location:

Inspected By: Signature:

Office/rooms YES NO N/A

A Clean and disinfect all door knobs?


B Are walking/working surfaces kept clear and any liquid spills cleaned up immediately?

C Are stairways, passageways, and gangways kept free of material, supplies, or obstructions?

D Empty wastepaper basket then replaces the plastic liner?

E Wipe , clean and dis infect all tables and chairs inside the Office?

F Sweep then mop floor with disinfection solution?

G All corners are sweep and free from dirt and unwanted materials?

H Wipe, Clean and disinfect Computers/desktops?

I Clean all windows and Mirrors?

J Inspect office Toilets/Ablution and fill Toilet cleaning checklist?

Pantry or cafeteria YES N0 N/A

A Clean and disinfect all door knobs?


B Are walking/working surfaces kept clear and any liquid spills cleaned up immediately?
C Empty wastepaper basket then replaces the plastic liner?
D Removed or empty food waste and clean food waste bin?
E Remove any obstruction in the access/Egress?

F Remove unwanted combustible and flammable items?


G Wipe all Fire Extinguishers and remove obstruction?
H Shutdown or off all switches when not in use?
I Sweep and mop floor with disinfectant?
J Clean table and remove left over foods?

Smoking area YES NO N/A

A Remove unwanted combustible and flammable items?


B Wipe and clean Fire extinguisher?
C Remove unwanted combustible and flammable items?
D Remove cigarrete butt from the Ashtray?
E Clean chairs and disinfect?

Remarks or Comments:
DAILY SITE CLEANING CHECKLIST
Project ID : PA 2020 C 012 G - DN071 - P02 Location:

Date & Time: Location:

Working Areas YES NO N/A

A Are safe accesses to the job site provided for all workers?

B Are walking/working surfaces kept clear and any liquid spills cleaned up immediately?

C Are stairways, passageways, and gangways kept free of material, supplies, or obstructions?

D Are all debris and trash picked up and placed in their proper containers?
Is the daily housekeeping was followed and obey by the inchage Foreman or Charagehend in the
E
area?
Are protruding nails, forms, scrap lumber, and other debris kept clear from work areas, passageways,
F
and stairs, and in and around buildings or other structures?

Material Storage YES NO N/A

A Are items not being used (e.g., tools, cords, or chains) properly safe keep?

B Are materials storage areas kept clean and free of unnecessary materials and debris?

C Is loose scrap or light materials that may be blown off by high winds, properly secured?

D Are proper segregation of materials followe in the area?

E Are empty cement bags and other dust-producing materials removed from the work areas?

Waste YES NO N/A

Are trash and recycling containers with self-closing covers placed throughout the job site, marked for
A
proper use, and emptied at regular intervals?

B Are chutes provided to remove waste from above grade floors?

C Are drip pans used to collect oils and fluids?

Are all scrap, waste, recyclable, and surplus materials disposed of in accordance with federal
D
regulations and local codes?

Are all oil-soaked and paint-saturated rags, clothing, waste, or combustible refuse placed in
E
noncombustible receptacles with self-closing covers?

F Is combustible waste scheduled for frequent collection and removal?

G Are used oil containers and dumpsters locked to secure them from unwanted waste?

Inspected By: Date:

Comments:
DAILY LAYDOWN CLEANING CHECKLIST
Project ID : PA 2020 C 012 G - DN071 - P02

Date & Time: Location:

Working Areas YES NO N/A

A Are safe accesses provided for all workers?

B Are walking/working surfaces kept clear and any liquid spills cleaned up immediately?

C Are stairways, passageways, and gangways kept free of material, supplies, or obstructions?

D Are all debris and trash picked up and placed in their proper containers?

E Is the daily housekeeping was followed and obey by the inchage Foreman or Charagehend in the area?

Are protruding nails, forms, scrap lumber, and other debris kept clear from work areas, passageways, and
F
stairs, and in and around buildings or other structures?

Material Storage YES NO N/A

A Are items not being used (e.g., tools, cords, or chains) properly safe keep?

B Are materials storage areas kept clean and free of unnecessary materials and debris?

C Is loose scrap or light materials that may be blown off by high winds, properly secured?

D Are proper segregation of materials followed in the area?

E Are empty cement bags and other dust-producing materials removed from the work areas?

Waste YES NO N/A

Are trash and recycling containers with self-closing covers placed throughout the job site, marked for proper
A
use, and emptied at regular intervals?

B Are chutes provided to remove waste from above grade floors?

C Are separated bins for different scrap/garbnages available and ready to use?

Are all scrap, waste, recyclable, and surplus materials disposed of in accordance with federal regulations and
D
local codes?

Are all oil-soaked and paint-saturated rags, clothing, waste, or combustible refuse placed in noncombustible
E
receptacles with self-closing covers?

F Is combustible waste scheduled for frequent collection and removal?

G Are used oil containers and dumpsters locked to secure them from unwanted waste?

Inspected By: Date:

Comments:

You might also like