PTFE/
PRESET COLD HOT INSTALLED UPPER GRAPHITE INSULATION
INSTALLED TO OPR. VAR. LOWER ASSEMBLY LINE SIZE TEMP
(SPRING LOAD LOAD LOAD HT ASSEMBLY PAD ON THICKNESS IN REMARK
A B C (NB) (DEG C)
SR NODE SUPPORT TAG RATE) H LOAD MM
No. NO. No. QTY SPRING TYPE UP DOWN HOR. TYPE EL-II TYPE EL-I EQUIPMENT NAME
FLANGE
(Kg/mm) (mm) (mm) (mm) (Kg) (Kg) (Kg) (%) (mm) (mm) (mm) (mm) (m) (m)
BOTTOM
1 815 VSH-01 2 8.4 ±5 Ssas ± 15 305 S SA 0.25 Asa NOTE-1 GRAPHITE 150 NB SAAs 255 65 aasa
MOUNTED
Sas
SSA
NOTES:-
Project:- XXX
SAA 1) ASK TO SPRING VENDOR.