You are on page 1of 1

Annexure – 2 of Addendum - 1

APPENDIX-II
Form-2/R
Financial Proposal

Table –I, Lump sum quote


S.N. Particular Qty Unit Rate Per Total Quote (Excl. of taxes)
Unit
In figure In Word
(A) (B) (A*B)
*1 Preparation of Alternative Analysis 4 Cities Lump
Report as per Stage A (KD 1 to 3) of sum
Annexure-6/R (total for all 4 cities)

#2 Completion of all activities as per 100 KMs


Stage B (KD 1 to 5) of Annexure-6/R
for preparation of DPR for 100 KMs (4 Cities
(25KM * 4 cities) of Rail Based Mass * 25
Transit with Metro-Neo / Metro-Lite KMs)
System for Vadodara, Rajkot,
Bhavnagar and Jamnagar
Total

* The bidder’s quote of preparation of SN1 (i.e. Alternate Analysis Report) shall be maximum limit up to 15% of
SN2 (i.e. total cost of preparation of DPR for 100 KMs).

#Payment Per KM or proportionately in case of part thereof as per actual length for the preparation of DPR for 4
nos. of Cities.

Table –II, Apportion of Lump sum payment & duration

Refer Annexure-6/R, Deliverables & Payment Schedule

Note:
1. The quote will be exclusive of all taxes. The taxes, as applicable will be reimbursed to consultant on
submission of documentary evidence.

2. The Reports / Deliverables will be reviewed by GMRC on each stage and on acceptance of same only the
payment of that particular stage will be processed.

3. The total cost will be inclusive of remuneration of key & support personnel, cost for Reports & documents
printing, Travel & Accommodation, office equipment & stationary and any other expenses in completion of
the work etc.

4. The Price bid to be filled online only on N procurement Portal (i.e. https://gmrc.nprocure.com)

Tender/RFP No. GMRC/DPR/01/2021 Page 1 of 1