Annex-1

GENERAL INFORMATION
1. General Information :
Name of Project: Basauti Loharpur WSP Survey Date:
VDC/Municipality: Basauti,Udashipur & Hasuliya Surveyed By:
District: Kailali

2. Accessibility
Distance from district headquarter Dhangadhi to project area : 51
Name of the nearest market for construction materials : Dhangadhi
Distance from project area to nearest market : 38
Name of the nearest all weather roadhead : project site

Mode of transportation from nearest market to site :


Sector
Mode of transpotation Distance km Remarks
From To
Black topped Dhangadhi 38
Vehical Gravel 12
Earthen 1
Manual Foot trail 0
Air 0

3. Existing situation of water supply and sanitation in the VDC


Ward No.
Category Total
1 2 3 4 5 6 7 8 9
Total population
Present water supply HH
coverage pop.
HH
Present sanitation coverage
pop.

4 Household and population coverage by this project


Ward No.
Category Total
1 2 3 4 5 6 7 8 9
Water supply

94 167 154 32 447


(Additional coverage) not HH
included in previous
coverage pop. 616 1143 1026 207 2992

Service reinstated HH
( already included in
previous coverage) pop.
Sanitation
HH
Households and population
in terms of household
toilets pop.
Annex-2
PROPOSED WATER SOURCES

Name of Project:- Basauti Loharpur WSP VDC: Basauti,Udashipur & Hasuliya District: Kailali
Location Measured Source area
Schem Present Safe Appear Pollution
Name of source Type Ward Taste Dispute U.S.Se
No. VDC Locality use Date yeild yield lps ance possibility Veg. Land slide Erosion
No. ttle
1 Underground Water DT Basauti 8 Near 20.00 N N N N
Football
Ground

Note: SP-spring, ST- stream, SFS- spring fed stream Clear (C)/ Tubid (T) Vegetation: Good(G)/Medium(M)/poor(P)
WS- Water supply, IR- Irrigation , WM- water mill Pleasure (P)/Unpleasure (UP) Upstream settlement : Yes(Y)/No(N)
Date in english calender Yes (Y)/No(N) Landslide possibility : Yes(Y)/No(N)
Erosion possibility: Yes(Y)/ No(N)
Annex-3
PRESENT POPUATION & HOUSEHOLDS IN THE PROJECT AREA

Name of Project:- Basauti Loharpur WSP VDC: Basauti,Udashipur & Hasuliya District: Kailali
Domestic Institutional Existing Number of Toilets
Name of Village/ Cluster / Permanent Temporary % of
S. No. Scheme Name Ward no. Remarks
Institutions HH Population HH Population Toal
Type Type Total HH

Pratappur Tole, Naba Deep


1 Udashi-9 32 207 1 100
Primary School

Mandir Tole, Rampur Bich


2 Basauti-8 154 1026
Tole, Yekata Tole

Uttar Majhara Tole, Jhodisa


3 Basauti-2 94 616 1 150
Tole, Saraswoti Primary School

Dakshin Majhara Tole,


4 Hasuliya-7 167 1143
Pachgharuwa Tole

Total 447 2992 2 250


Annex-4
EXISTING SCHOOLS AND PUBLIC INSTITUTIONS IN THE PROJECT AREA

Name of Project:- Basauti Loharpur WSP VDC: Basauti,Udashipur & Hasuliya District: Kailali
Water Supply Facilities Sanitation facilities
No. of Students / Users If existing
Sch. Name of School /Public Existing No. of Existing No. of toilet
Ward No. Location facilities not Remarks
No. Institutions Boys / Girls Tap Water Tank
Total sufficient, give Permanent Temporary
Male /Female stand (Type / Volume) reason
1 Naba Deep Primary School Udashi-9 Pratappur 100

2 Saraswoti Primary School Basauti-2 Uttarmajhara 150

Total 250
Annex-5
HOUSEHOLD & POPULATION PROJECTION

Name of Project:- Basauti Loharpur WSP Design Period : 15 Years VDC: Basauti,Udashipur & Hasuliya District: Kailali

Survey Year ( 2015 ) Base Year ( 2018 ) Design Year ( 2033 ) Institutional
Annual
Schem Scheme
Villages/ Communities Ward no. growth Design
No. Name Present
HH Pop. rate % HH Pop. HH Pop. populatio
population
n
Pratappur Tole, Naba Deep
1 Udashi-9 32 207
Primary School 1.5 33 216 42 271 100 131
Mandir Tole, Rampur Bich Tole,
2 Basauti-8 154 1026
Yekata Tole 1.5 161 1073 201 1341
Uttar Majhara Tole, Jhodisa Tole,
3 Basauti-2 94 616
Saraswoti Primary School 1.5 98 644 123 805 150 196
Dakshin Majhara Tole,
4 Hasuliya-7 167 1143
Pachgharuwa Tole 1.5 175 1195 218 1494

Total 447 2992 467 3128 584 3911 250 327


Annex-6
TOTAL WATER DEMAND & WATER FLOW CALCULATION
Name of Project:- Basauti Loharpur WSP VDC: Basauti,Udashipur & Hasuliya District: Kailali
Present Year : 2014 dsign Year : 2017 Annual growth rate : 4% adopted
School and Consumption rate
Population Design water demand Tap flow , lps
Schem Scheme Tap Ward institution (lpcpd) Tap location
HH
No. Name No. no. Live stock reference
Instituti
Present Design Present Design domestic institutional Domestic ……% of Total Average Peak Adopted
onal
D

Total Water demand & water flow calculation to be taken from pipe design

Total
Required Flow from source = Total design Demand /86400 = lps
Available Safe Yield at source = lps Peak factor:
Annex-7
WATER STORAGE TANK SIZING
Name of Project:- Basauti Loharpur WSP District: Kailali

Number of tubewells 1 No.


Designed discharge through tubewell 20.00 lps
Designed water demand to be supplied through tank 318927 lpd
Total pumping hour 4.43 hours
Say 5 hours
Pumping rate from tubewell 72000 litres/hr

Pumping hour:
Shift-1 5.00 AM- 07.30 AM
Shift-2 17.00 PM- 19.30 PM

Water Water Accumulated Excess Excess Water in


Draw off Accumulated Pumping
Time Hours demand pumped pumping demand (5- pumping (8-5) reservoir
factor demand litres hour
litres litres litres 8) litres litres litres
1 2 3 4 5 6 7 8 9 10 11
05.00-07.00 2 0.25 79732 79732 2.5 180000 180000 100268 239677
07.00-12.00 5 0.35 111624 191356 0.5 36000 216000 24644 164053
12.00-15.00 3 0.20 63785 255141 0 216000 39141 100268
15.00-21.00 6 0.20 63785 318926 2.5 180000 396000 77074 216483
21.00-05.00 8 0.00 0 318926 0 396000 77074 139409
24 1.00 318927 5.5
Maximum excess demand + Maximum excess supply = 139409 litres
Recommended to provide an overhead RCC water tank of = 200 m3 capacity
Annex-9
PUMPING MAIN AND PUMP
Name of Project:- Basauti Loharpur WSP District: Kailali

Total designed demand to be supplied through elevated water tank : 318927 liters/day
: 318.93 m3/day
Number of tubewell : 1 No.
Size of tubewell : 250/200 mm Ø
Assumed maximum discharge available from tubewell : 25.00 lps
Designed average pumping rate from each tubewell : 20.00 lps
1200 lpm
Total pumping hours required : 4.43 hours
1 Pumping Main
Approximate length of pumping main : 80 m
Assume flow rate v = 1.00 m/s. Then required diameter of the pumping main

d=

0.15954 = 159.54 mm
Recommended to use 150 mm Ø DI pipe in the pumping main.
Then, flow rate v = 1.13 m/s
2 Total Pumping Head
Assumed static water level during dry period = 30.00 m BGl
Assumed maximum drawdown due to pumpage = 20.00 m
Headloss in the pumping main (including in fittings) = 2.00 m
Reservoir head = 25.475 m
Residual head = 5.00 m
Total pumping head required Total = 82.48 m
Recommend to provide a 8" borewell submersible pump confirming to IS : 8034 for nominal 1200 lpm yield and
total pumping head of 83 m. However, actual design & selection of pump shall be done only after draw down
test of tube well
3 Shaft Horse Power of the Pump
Np = Q.H.ρ.g/ηp Where,
= 20 x 10-3 x 84 x 1000 x 9.81 / 0.68
= 23948 watt
23.95 kW
32.10 HP
4 Shaft Horse Power of Electric Motor
Nm = Np/(ηt.ηr) Where
= 23.95 / (0.9 x 0.9) ηt = efficiency of transmission ( 90% assumed)
= 29.57 Kw ηr = other efficiency coefficients related to altitude,
= 39.63 HP temperature, humidity etc. ( 90% assumed)
Say 40 HP
5 Rated Capacity of Electric Transformer
Power required for operation of the pump shall be obtained through 3-Phase Central Electric Grid.
Rated Capacity of electric transformer = Power input to the pump moter + Power for other uses
= (29.57+5)/0.8 = 43.21 kW

Recommended to provide a standard 50 KVA electric transformer.


Annex-15
PERSONS CONTACTED DURING SURVEY

Name of Project:- Basauti Loharpur WSP District: Kailali


Contact address
S.No. Name of the persons Designation
VDC/Ward No. Village Contact No.