Annex-1

GENERAL INFORMATION
1. General Information :
Name of Project: Dhanaura WSP Survey Date:
VDC/Municipality: Bhajini Municipality Surveyed B y:
District: Kailali

2. Accessibility
Distance from district headquarter Dhangadhi to project area : 67 km
Name of the nearest market for construction materials: : Dhangadhi
Distance from project area to nearest market : 67 km
Name of the nearest all weather roadhead : project site

Mode of transportation from nearest market to site :


Sector
Mode of transpotation Distance km Remarks
From To
Black topped Dhangadhi Dhanaura 66
Vehicle Gravel 1
Earthen
Manual Foot trail
Air

3. Existing situation of water supply and sanitation in the VDC


Ward No.
Category Total
1 2 3 4 5 6 7 8 9
Total population
Present water supply HH
coverage pop.
HH
Present sanitation coverage
pop.

4 Household and population coverage by this project


Ward No.
Category Total
4 and 9
Water supply
966
(Additional coverage) not HH 966
included in previous
coverage pop. 5796 5796

Service reinstated ( already HH


included in previous
coverage) pop.
Sanitation
HH
Households and population
in terms of household
toilets pop.
Annex-2
PROPOSED WATER SOURCES

Name of Project:- Dhanaura WSP Municipality: Bhajini District: Kailali


Location Measured Source area
Schem Present Safe Appeara Pollution
Name of source Type Municip Ward Taste Dispute U.S.Set
No. Locality use Date yeild yield lps nce possibility Veg. Land slide Erosion
ality No. tle
1 Underground Water DT Bhajini 4,9 N N N N
Municip
ality

Note: SP-spring, ST- stream, SFS- spring fed stream Clear (C)/ Tubid (T) Vegetation: Good(G)/Medium(M)/poor(P)
WS- Water supply, IR- Irrigation , WM- water mill Pleasure (P)/Unpleasure (UP) Upstream settlement : Yes(Y)/No(N)
Date in english calender Yes (Y)/No(N) Landslide possibility : Yes(Y)/No(N)
Erosion possibility: Yes(Y)/ No(N)
Annex-3
PRESENT POPUATION & HOUSEHOLDS IN THE PROJECT AREA

Name of Project:- Dhanaura WSP Municipality: Bhajini District: Kailali


Domestic Institutional Existing Number of Toilets
Name of Village/ Cluster /
S. No. Scheme Name Ward no. Permanent Temporary % of Remarks
Institutions HH Population HH Population Total
Type Type Total HH

1 Dhanaura WSP Dhanaura 4,9 966 5796 4 600

Total 966 5796 4 600


Annex-4
EXISTING SCHOOLS AND PUBLIC INSTITUTIONS IN THE PROJECT AREA

Name of Project:- Dhanaura WSP Municipality: Bhajini District: Kailali


Water Supply Facilities Sanitation facilities
No. of Students / Users
Sch. Name of School /Public Ward Existing No. of If existing facilities Existing No. of toilet
Location Remarks
No. Institutions No. Boys / Girls Tap Water Tank not sufficient, give
Total reason Permanent Temporary
Male /Female stand (Type / Volume)

1 School Bhajini 150

Total 150
Annex-5
HOUSEHOLD & POPULATION PROJECTION

Name of Project:- Dhanaura WSP Design Period : 15 Years Municipality: Bhajini District: Kailali

Survey Year ( 2019 ) Base Year ( 2022 ) Design Year ( 2037 ) Institutional
Annual
Schem Scheme
Villages/ Communities Ward no. growth
No. Name Present Design
HH Pop. rate % HH Pop. HH Pop.
population population

1 Dhanaura 4,9 966 5796 1.5 1010 6061 1263 7577 5796 7577

Total 966 5796 1010 6061 1263 7577 5796 7577


Annex-7
WATER STORAGE TANK SIZING
Name of Project:- Dhanaura WSP District: Kailali

Number of tubewells : 2 No.


Designed discharge through tubewell : 18.00 lps
Designed water demand to be supplied through tank : 625302.464193 lpd
Total pumping hour : 4.82 hours
Say: 6.00 hours
Pumping rate from tubewell : 129600 litres/hr

Pumping hour:
Shift-1 5.00 AM- 8:00 AM
Shift-2 15.00 PM- 18.00 PM

Excess Water in
Draw off Water demand Accumulated Pumping Water pumped Accumulated Excess demand
Time Hours pumping reservoir
factor litres demand litres hour litres pumping litres (5-8) litres
(8-5) litres litres
1 2 3 4 5 6 7 8 9 10 11
05.00-07.00 2 0.25 156326 156326 2 259200 259200 102874 317190
07.00-12.00 5 0.35 218856 375182 1 129600 388800 -13618 227934
12.00-15.00 3 0.20 125060 500242 0 0 388800 111442 102874
15.00-21.00 6 0.20 125060 625303 3 388800 777600 152297 366614
21.00-05.00 8 0.00 0 625303 777600 152297 214316
24 1.00 625302.848145 6
Maximum excess demand + Maximum excess supply = 214316 litres
Recommended to provide an overhead RCC water tank of = 214.31635530624 m3 capacity
225 cumec Tank recommended
Annex-8
PUMPING MAIN AND PUMP
Name of Project:- Dhanaura WSP District: Kailali

Total designed demand to be supplied through elevated water tank : 625302.464 liters/day
: 625.30 m3/day
Number of tubewell : 2 No.
Designed average pumping rate from each tubewell : 18.00 lps
1080 lpm
Total pumping hours : 6.00 hours
1 Pumping Main
Approximate length of pumping main : 80 m
Assume flow rate v = 2.25 m/s. Then required diameter of the pumping main

d=

0.100905 = 100.90 mm
Recommended to use 150 mm Ø DI pipe in the pumping main.
Then, flow rate v = 1.02 m/s
2 Total Pumping Head
Assumed static water level during dry period = 30.00 m BGl
Assumed maximum drawdown due to pumpage = 20.00 m
Headloss in the pumping main (including in fittings) = 2.00 m
Reservoir head = 25.475 m
Residual head = 5.00 m
Total pumping head required Total = 82.48 m
Recommend to provide a 8" borewell submersible pump confirming to IS : 8034 as per requirement
total pumping head of 83 m. However, actual design & selection of pump shall be done only after draw
down test of tube well
3 Shaft Horse Power of the Pump
Np = Q.H.ρ.g/ηp Where
= 25x 10-3 x 84 x 1000 x 9.81 / 0.68
= 21553 watt
21.55 kW
28.89 HP
4 Shaft Horse Power of Electric Motor
Nm = Np/(ηt.ηr) Where
= 35.92 / (0.9 x 0.9) ηt = efficiency of transmission ( 90% assumed)
= 26.61 Kw ηr = other efficiency coefficients related to altitude,
= 35.67 HP temperature, humidity etc. ( 90% assumed)
Say 50 HP
5 Rated Capacity of Electric Transformer
Power required for operation of the pump shall be obtained through 3-Phase Central Electric Grid.
Rated Capacity of electric transformer = Power input to the pump moter + Power for other uses
= (36.96+5)/0.8 = 39.51 KVA