You are on page 1of 65

Tel. No.

+63 2 8285 1824


Fax No. +63 2 8929 5963
Email: gss.corp0527@gmail.com
(632) 8285-1824
(632) 8929-5963
gss.corp0527@gmail.com/info@gsswater.com
gsswater.com
BOARD OF DIRECTORS

Chief Executive Officer

VANESSA V. UNLAYAO
Corporate Secretary WATERMATIC
PHILIPPINES
ALLAN V. UNLAYAO RON MALKIN
Chief Operations Officer Project Manager

LARRY RODRIGUEZ
Project Supervisor

ANALYN G. TAMAGOS MARILOU M. MADANGLOG


Finance Division Administrative Assistant

JULIETO G. TAMAGOS JR. RONALD F. CRESCINI


Liaison Officer Liaison Officer

ENGR. ERVIE J. CAUNCA REYNATO A. ELORTA


Chief Marketing Officer Chief Sales Officer

MA. CHRISTINE CHUA DELBERT J. ERNI JUAN CARLO A. SANTIAGO


Marketing Officer Head – RBU Construction Head – RBU Sales

AUBREY N. CERILO
Project Controller

C-JAY A. LUCIO CARL E. RAGAS JAYSON R. HANGAD


RYAN T. MONTECILLO ROMERSON M. NANAO
Project Engineer Project Engineer Project Engineer
Project Engineer Project Engineer

SUPPLIER SUB-CONTRACTOR
PROJECT REFERENCES
IN THE PHILIPPINES

WATER TREATMENT
PLANT PROJECT
Project Name: DESIGN, SUPPLY, BUILDING
AND INSTALLATION OF
THE WATER CLARIFIER
SYSTEM
Location: Pamucutan, Zamboanga City
Capacity: 50,000 m³/day

Front View

Treated Water
Tank
Clarifier Tank

Media Filters
Sludge Lagoon

Chemical Farmhouse
Chemical Room

Chlorine Room
Project Name: DESIGN & BUILDING OF CEBU
BULK WATER SUPPLY SYSTEM
Location: Carmen, Cebu City
Capacity: 35,000 m³/day

Media Filters
Clarifier
Sludge Lagoon

Chemical Room
Filter Manifold

Generator Set
Project Name: DESIGN, SUPPLY AND INSTALLATION OF
CLARIFIER SYSTEM
Location: Ouano Ceniza Reservoir Complex,
Surigao City
Capacity: 4,000 m³/day

Pulsator Clarifier

Media Filters
Chemical Farm
Project Name: PASSI WATER TREATMENT PLANT
Location: Passi City, Iloilo
Capacity: 10,000 m³/day
Project Name: SWRO – DESALINATION PLANT
Location: Lapu-Lapu City, Cebu
Capacity: 1000 m³/day
PROJECT REFERENCES
IN THE PHILIPPINES

WASTEWATER
TREATMENT PROJECT
Project Name: SEPTAGE TREAMENT PLANT
Location: Sapang Maragul, Tarlac City
Capacity: 60 m³/day

COMPLETED PROJECT
Project Name: SEWAGE TREAMENT PLANT
Location: Judge Juan Luna St., Quezon City
Capacity: 5 m³/day

COMPLETED PROJECT
Project Name: SEWAGE TREAMENT PLANT
Location: Davao City
Capacity: 100 m³/day

COMPLETED PROJECT
PROJECT REFERENCES
IN THE PHILIPPINES

COMPLETED ELECTRO-
MECHANICAL
PROJECTS
Project Name: Cabatuan PS Rehab Project
Location: Calbayog, Samar
Capacity: 8MLD per Pumpset w/ Controls,
750KVA Generator Set
Completed: 2021
Project Name: Norzagaray In-line Booster Station
Location: Norzagaray, Bulacan
Capacity: 40HP Horizontal In-line Booster Pump
w/ Shroud & VFD/SS Controls
Completed: 2021
Project Name: MNWD Cararayan IV Electro-mech Location:
Naga, Camsur
Capacity: 60HP Submersible Pumpset w/
Controls and Yard Piping
Completed: 2020
Project Name: TWD San Carlos PS Location:
Tabaco, Albay
Capacity: 10HP Submersible Pumpset w/
Controls and Yard Piping
Completed: 2020
Project Name: Caprari Triplex Booster Pump and Fire Protection
Location: Taal, Batangas Fire
Pump Capacity: 300GPM
Booster Pump: 6unit-20GPM
Year Completed: 2019
PROJECT REFERENCES
IN THE PHILIPPINES

COMPLETED BOLTED
TANK PROJECTS
Project Name: Steel Bolted Tank for Buenavista
Water District
Location: Buenavista, Agusan del Norte
Tank Capacity: 2,000 Cu.M.
Year Completed: 2021
Project Name: Bolted Tank with Booster Pump
Location: Nuvali Setting Southfields,
Calamba, Laguna
Tank Capacity: 189 Cu.M.
Year Completed: 2021
Project Name: 500cu.m Steel Bolted Tank with
Triplex Booster Pumps
Location: Pili, Camarines Sur
Tank Capacity: 500 Cu.M Year
Completed: 2019
Project Name: St Joseph Homes Glass Fused to
Steel Bolted Tank
Location: Norzagaray, Bulacan
Tank Capacity: 1000m3
Year Completed: 2021
Project Name: Anaerobic Digester Tank for
Waste to Energy Plant
Location: Batangas
Tank Capacity: 4000m3
Year Completed: 2021
Project Name: Liner Tank w/ Booster Pump for
Bacolor WD
Location: Bacolor Pampanga
Tank Capacity: 200m3
Year Completed: 2019
Project Name: Liner Tank for Woodgrove Park
Location: San Fernando Pampanga
Tank Capacity: 250m3
Year Completed: 2020
PROJECT REFERENCES
IN THE PHILIPPINES

OTHER COMPLETED
PROJECTS
Project Name: SEWAGE TREATMENT PLANT
Location: Lubi Plantation, Kopiat Island, Davao
Capacity: 125CMD STP Expansion
(HiClear System)
Project Name: CARMEN UPGRADE OF EXISTING WTP
Location: Carmen, Cebu
Capacity: 35,000 m³/day
(from 100NTU to 3,500NTU)
Project Name: PACKAGED LIFT STATIONS
Location: Cavite & Laguna
JWCE GRINDER/MACERATORS
HICLEAR
Wastewater Treatment Systems

You might also like