LABORATORY EQUIPMENTS

High Pressure Oven Bitumen/Thin


Cement Finest Furnace Muffle Autoclave Film Oven
1) Put manometer oil up 1) Prepare 1g of cement 1) Set the thermostat to 1) Weigh the sample first.
to the first blue line. to the platinum cruci- maximum and Pan
2) Heat for 5 hours upon
2) Filter the weighted ble. This is to burn for 3 to 5 minutes.
reaching 163ºC
cement. the sulfur sulfate of
2) Preheat for 30 to 40
cement)
minutes.

Water Bath
3) Put it on the glass
tube. 2) Set furnace muffle to
3) Then Off/close, wait
950 ºC & 25ºC
4) Then press the rubber. and start for 3 hours
3) Heat for 15minutes
5) Record the time from 2 Mpa (30-40mins) 1) Set to 60ºC temperature.
then put the sample
line to line then find inside. (from max to 50) 2) Soak for 1 hour before
the average. Close: breaking martial stabil-
OFF then turn to pan. Slowly
ity.
release.
Cleveland Flash (Tack oven Cap · Don’t Operate withour 1.5

Tester) Liters

· Don’t leave with water. Use


1. Provide gasoline. 5. Turn on the equipment and sponge for draining the water.
set to full 10.
2. Level the bitumen sample
to the line inside. 6. Record the flash point.
Note:
3. Set the temperature to ___________________________ 9 normal
100ºC · HS 285 rpm 60s
10-11 saturated
1. Put sample below the ring
4. Merged the 3/4 of mercury line. · LS 140 rpm 30s 12 oversaturated
onto the sample 2. Set water half the cap.

OVEN Digital Penetrometer Ductimeter


1) Cook the bitumen to 5) Dry for 30 to 45 minutes
1) Turn off for 5 seconds. bucket mold. in normal temperature.
1) Cook the sample. Let
2) Turn On and set to it cool for 30 minutes. 2) Prepare the ff: 6) Scrape the excess asphalt.
desired temperature. 2) Submerged the cooled 50mL glycerin 6) Place it to the mold plate.
sample for 30 minutes.
· Flap 30g of talc powder 7) Soak sample for 30
3) Then put the sample minutes.
for penetration. 3) Mix it thoroughly
· Ramp (10ºC/mm to
using stirring glass 8) Start the machine.
increase the tempera- 4) Set water to 25ºC
ture faster) 4) Spread one layer so Note:
5) Set to 5seconds. the bitumen won’t
· Delay off Ductility Speed: 50mm/min
6) Perform for 3 trials stick
Length: 1.5 m
and find the average.
T: 25ºC ± 2ºC