URAIAN PEKERJAAN
13.35 PJ 1
-
-
-
-
-
-
-
-
-
-
4.73 PJ2
-
-
-
-
-
-
-
-
7.45 PJ3
-
-
-
-
-
-
-
-
5.85 PJ4
-
-
-
-
-
-
-
-
-
4.28 P1
-
-
-
-
-
-
-
-
-
-
3.83 P1'
-
-
-
-
-
-
-
-
-
-
2.03 P2
-
-
-
-
-
-
-
-
-
4.28 P3
-
-
-
-
-
-
-
-
-
1.80 P4 / PB
-
-
-
-
-
-
-
-
-
2.70 P5
-
-
-
-
-
-
-
-
-
-
2.25 P6
-
1.80 P7
-
1.80 P8
-
2.03 PG
-
-
-
-
-
-
-
-
-
10.78 P9
-
-
-
-
-
-
-
-
-
-
-
-
-
4.59 P10
-
-
-
-
-
-
-
-
-
-
Ps
-
-
-
-
-
-
0.45 BV1
-
-
-
-
-
-
0.78 BV2
-
-
-
-
-
-
1.15 BV3
-
-
-
-
-
-
2.07 BV4
-
-
-
0.87 BV5
-
-
-
8.80 J1
-
-
-
-
-
-
6.63 J2
-
-
-
-
-
-
4.46 J3
-
-
-
-
-
-
3.15 J3'
-
-
-
-
-
-
2.28 J4
-
-
-
-
-
-
2.15 J4'
-
-
-
-
-
-
3.33 J5
-
-
-
-
-
-
4.44 J6
-
-
-
4.53 JT1
-
-
-
PT1
-
-
-
-
-
-
-
PT1'
-
-
-
-
-
-
-
PT2
-
-
-
-
-
-
-
PT3
-
-
-
-
-
-
-
PT4
-
-
-
-
-
-
-
PT5
-
-
-
-
-
-
-
PT6
-
-
-
-
-
PT7
-
-
-
-
-
R1
-
-
-
-
-
-
R2
-
-
-
-
-
-
R3
-
-
-
-
-
-
R4
-
-
-
-
-
-
-
-
-
-
-
-
Tangga service
-
-
-
URAIAN PEKERJAAN
item
Kaca frameless tempred laminaed 12 mm daun pintu jendela
m2 11.57
12 mm
Beton balok latai dan kolom gantung m3 0.20
beton peninggian dudukan jendela m3 0.10
Lapis granit tile m2 3.82
Pull handel stainless steel panjang bh 4.00
Patch fitting atas bh 2.00
Patch fitting bawah bh 2.00
Patch Lock bh 2.00
Double Cylinder bh 2.00
Floor hinge set 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 12.20
Rangka pintu alumunium Pwdr coat putih m2 0.16
Kaca bening 5mm m2 3.70
Handle pintu (lever handle) ps 1.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 3.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 22.80
Rangka pintu alumunium Pwdr coat putih m2 0.16
Kaca bening 5mm m2 5.44
Handle pintu (lever handle) ps 1.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 3.00
Box Multiplek lapis HPL :
Rangka kayu bengkirai Usuk (5/7) m3 0.09
Multiplek 9mm m2 3.63
Lapis HPL m2 3.63
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 13.00
Rangka pintu alumunium Pwdr coat putih m2 0.43
Kaca bening 5mm m2 4.41
Handle pintu (lever handle) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Flush bolt bh 2.00
Hinge pintu bh 6.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 6.30
Engineering Door (panil multiplek + honeycomb) m2 3.96
Kaca bening 5mm m2 0.32
Lapis HPL m2 15.28
Handle pintu (lever handle) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 6.00
Flush Bolt bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 6.10
Engineering Door (panil multiplek + honeycomb) m2 3.52
Kaca bening 5mm m2 0.32
Lapis HPL m2 13.52
Handle pintu (lever handle) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 6.00
Flush Bolt bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 5.30
Rangka pintu alumunium Pwdr coat putih m2 0.60
Multiplek 12mm m2 1.23
Lapis HPL m2 2.47
Handle pintu (lever handle) ps 1.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 3.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 6.30
Rangka pintu alumunium Pwdr coat putih m2 1.00
Kaca bening 5mm m2 2.63
Handle pintu (lever handle) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 6.00
Flush Bolt bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 5.20
Rangka pintu alumunium Pwdr coat putih m2 0.56
Multiplek 12mm m2 1.05
Lapis HPL m2 2.09
Handle pintu (lever handle) ps 1.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 3.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 5.60
Engineering Door (panil multiplek + honeycomb) m2 2.64
Kaca bening 5mm m2 0.16
Lapis HPL m2 5.00
Handle pintu (lever handle) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 6.00
Flush Bolt bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Pintu UPVC lebar 90cm lengkap dengan kusen dan asesoris Unit 1.00
item
Pintu UPVC lebar 70cm lengkap dengan kusen dan asesoris Unit 1.00
item
Pintu UPVC lebar 70cm lengkap dengan kusen dan asesoris Unit 1.00
item
Kusen Aluminium powder coating 4" putih m 5.30
Engineering Door m2 1.98
Lapis HPL m2 3.96
Handle pintu (Pull plat) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Rel pintu sliding m 2.00
Cover aluminium m 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 12.20
Beton balok latai dan kolom m3 0.21
beton peninggian dudukan jendela m3 0.05
Lapis granit tile m2 10.68
Pintu Panil kayu Jati finish melamin m2 4.40
Jendela Krawangan ukiran kayu jati m2 3.12
Pull handel stainless steel panjang bh 4.00
Handle pintu Panjang artisitk ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 8.00
Flush Bolt bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 9.02
Rangka pintu alumunium Pwdr coat putih m2 1.10
Kaca bening 5mm m2 3.22
Sticker sandblast m2 2.42
Handle pintu (lever handle) ps 2.00
Lockcase ps 1.00
Silinder + escutcheon set 1.00
Hinge pintu bh 6.00
Flush Bolt bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" putih m 4.50
Daun pintu rangka kayu lapis multipleks m2 0.83
Lapis HPL m2 1.65
Handle pintu turbular ps 1.00
Hinge pintu bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 2.60
Rangka jendela alumunium Pwdr coat putih m2 0.13
Kaca rayban 40% 5 mm m2 0.21
Friction stay set 1.00
Rambuncis bh 1.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 4.30
Rangka jendela alumunium Pwdr coat putih m2 0.24
Kaca rayban 40% 5 mm m2 0.36
Friction stay set 2.00
Rambuncis bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 6.20
Rangka jendela alumunium Pwdr coat putih m2 0.24
Kaca rayban 40% 5 mm m2 0.66
Friction stay set 2.00
Rambuncis bh 2.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 9.40
Aluminium perforated m2 1.71
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 4.40
Aluminium perforated m2 0.70
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 28.75
Rangka jendela alumunium Pwdr coat putih m2 0.62
Kaca rayban 40% 5 mm m2 7.10
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 22.20
Rangka jendela alumunium Pwdr coat putih m2 0.62
Kaca rayban 40% 5 mm m2 5.17
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 15.65
Rangka jendela alumunium Pwdr coat putih m2 0.62
Kaca rayban 40% 5 mm m2 2.22
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 11.80
Rangka jendela alumunium Pwdr coat putih m2 0.60
Kaca rayban 40% 5 mm m2 2.07
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 10.30
Rangka jendela alumunium Pwdr coat putih m2 0.50
Kaca rayban 40% 5 mm m2 1.35
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 9.75
Rangka jendela alumunium Pwdr coat putih m2 0.48
Kaca rayban 40% 5 mm m2 1.26
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 12.10
Rangka jendela alumunium Pwdr coat putih m2 0.62
Kaca rayban 40% 5 mm m2 2.22
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 26.70
Kaca rayban 40% 5 mm m2 3.72
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 14.15
Kaca rayban 40% 5 mm m2 4.48
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 37.70
Rangka jendela alumunium Pwdr coat putih m2 0.82
Kaca rayban 40% 5 mm m2 12.72
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 28.95
Rangka jendela alumunium Pwdr coat putih m2 0.84
Kaca rayban 40% 5 mm m2 9.91
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 47.80
Rangka jendela alumunium Pwdr coat putih m2 0.84
Kaca rayban 40% 5 mm m2 16.45
Friction stay set 4.00
Rambuncis bh 4.00
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Mulion vertikal m' 42.35
Mulion horisontal m' 28.00
Kaca tempered laminated 8mm m2 33.88
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Mulion vertikal m' 48.40
Mulion horisontal m' 38.00
Kaca tempered laminated 8mm m2 45.98
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
PARTISI
item
Kusen Aluminium powder coating 4" m' 9.60
Kaca Bening 5 mm m2 2.63
Sticker sandblast m2 1.40
Rangka metal stud m2 3.72
Gybsum board m2 7.88
Finishing cat acrylic Emultion m2 7.88
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 8.50
Kaca Bening 5 mm m2 2.13
Sticker sandblast m2 1.13
Rangka metal stud m2 3.06
Gybsum board m2 6.56
Finishing cat acrylic Emultion m2 6.56
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 5.40
Kaca Bening 5 mm m2 1.14
Sticker sandblast m2 0.60
Rangka metal stud m2 2.62
Gybsum board m2 5.24
Finishing cat acrylic Emultion m2 5.24
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 6.28
Kaca Bening 5 mm m2 1.55
Sticker sandblast m2 0.82
Rangka metal stud m2 3.04
Gybsum board m2 6.08
Finishing cat acrylic Emultion m2 6.08
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 6.04
Kaca Bening 5 mm m2 1.44
Sticker sandblast m2 0.76
Rangka metal stud m2 2.67
Gybsum board m2 5.34
Finishing cat acrylic Emultion m2 5.34
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Kusen Aluminium powder coating 4" m' 11.50
Kaca Bening 5 mm m2 3.06
Sticker sandblast m2 1.67
Rangka metal stud m2 4.64
Gybsum board m2 9.28
Finishing cat acrylic Emultion m2 9.28
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Rangka metal stud m2 21.30
Gybsum board m2 42.60
Pasangan duk bata finish plester aci m1 7.10
Finishing cat acrylic Emultion m2 42.60
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
item
Rangka metal stud m2 7.58
Gybsum board m2 15.16
Pasangan duk bata finish plester aci m1 2.30
Finishing cat acrylic Emultion m2 15.16
Acesories Lainnya ( sponengan, Sealant, Karet dll) ls 1.00
RAILING
item
Pipa Stainles steel □5x5 t 2mm m' 4.83
Pipa Stainles steel □4x4 t 2mm m2 5.25
Pipa Stainles steel □2x3 t 2mm m2 9.30
Kaca bening 6mm m2 3.72
Sticker sandblast m2 2.20
Acesories dan jasa ( Ring, Sealant, Karet, jasa instalasi dll) ls 1.00
item
Pipa Stainles steel □5x5 t 2mm m' 5.65
Pipa Stainles steel □4x4 t 2mm m2 6.30
Pipa Stainles steel □2x3 t 2mm m2 10.86
Kaca bening 6mm m2 4.34
Sticker sandblast m2 2.57
Acesories dan jasa ( Ring, Sealant, Karet, jasa instalasi dll) ls 1.00
item
Pipa Stainles steel □5x5 t 2mm m' 3.95
Pipa Stainles steel □4x4 t 2mm m2 5.25
Pipa Stainles steel □2x3 t 2mm m2 7.64
Kaca bening 6mm m2 2.97
Sticker sandblast m2 1.76
Acesories dan jasa ( Ring, Sealant, Karet, jasa instalasi dll) ls 1.00
item
Pipa Stainles steel □5x5 t 2mm m' 1.95
Pipa Stainles steel □4x4 t 2mm m2 3.15
Pipa Stainles steel □2x3 t 2mm m2 3.66
Kaca bening 6mm m2 1.28
Sticker sandblast m2 0.75
Acesories dan jasa ( Ring, Sealant, Karet, jasa instalasi dll) ls 1.00
Tangga service
Rail SS 2" m1 12
Rail SS 1,5" m1 5
asesoris, Ongkos pasang, overhead,profit ls 1.00
SATUAN HARGA SATUAN
(Rp.)
BH 23,538,227.86
1,303,000.00 15,078,967.50
5,000,000.00 997,500.00
5,000,000.00 517,500.00
359,998.00 1,373,392.37
400,000.00 1,600,000.00
150,000.00 300,000.00
150,000.00 300,000.00
175,000.00 350,000.00
50,000.00 100,000.00
900,000.00 1,800,000.00
1,120,867.99 1,120,867.99
BH 3,226,517.01
146,060.00 1,781,932.00
698,274.00 111,723.84
137,500.00 509,217.50
200,000.00 200,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 120,000.00
153,643.67 153,643.67
BH 6,675,939.23
146,060.00 3,330,168.00
698,274.00 111,723.84
137,500.00 747,450.00
200,000.00 200,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 120,000.00
11,402,000.00 1,013,637.80
43,809.03 158,807.73
90,000.00 326,250.00
317,901.87 317,901.87
BH 4,071,111.84
146,060.00 1,898,780.00
698,274.00 301,654.37
137,500.00 606,815.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 80,000.00
40,000.00 240,000.00
193,862.47 193,862.47
BH 6,933,585.29
146,060.00 920,178.00
806,686.00 3,194,476.56
137,500.00 43,560.00
90,000.00 1,375,200.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 240,000.00
40,000.00 80,000.00
330,170.73 330,170.73
BH 6,363,903.76
146,060.00 890,966.00
806,686.00 2,839,534.72
137,500.00 43,560.00
90,000.00 1,216,800.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 240,000.00
40,000.00 80,000.00
303,043.04 303,043.04
BH 2,275,807.51
146,060.00 774,118.00
698,274.00 420,081.64
65,694.44 81,080.08
90,000.00 222,156.00
200,000.00 200,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 120,000.00
108,371.79 108,371.79
BH 3,200,945.75
146,060.00 920,178.00
698,274.00 697,156.76
137,500.00 361,185.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 240,000.00
40,000.00 80,000.00
152,425.99 152,425.99
BH 2,183,634.78
146,060.00 759,512.00
698,274.00 392,848.95
65,694.44 68,795.22
90,000.00 188,496.00
200,000.00 200,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 120,000.00
103,982.61 103,982.61
BH 4,713,835.39
146,060.00 817,936.00
806,686.00 2,129,651.04
137,500.00 21,780.00
90,000.00 450,000.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 240,000.00
40,000.00 80,000.00
224,468.35 224,468.35
BH 2,700,000.00
2,700,000.00 2,700,000.00
BH 2,400,000.00
2,400,000.00 2,400,000.00
BH 2,550,000.00
2,550,000.00 2,550,000.00
BH 4,806,644.09
146,060.00 774,118.00
806,686.00 1,597,238.28
90,000.00 356,400.00
100,000.00 200,000.00
200,000.00 200,000.00
150,000.00 150,000.00
400,000.00 800,000.00
250,000.00 500,000.00
228,887.81 228,887.81
BH 25,986,580.87
146,060.00 1,781,932.00
5,000,000.00 1,068,000.00
5,000,000.00 255,000.00
359,998.00 3,844,778.64
1,576,685.00 6,937,414.00
2,600,000.00 8,112,000.00
400,000.00 1,600,000.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 320,000.00
40,000.00 80,000.00
1,237,456.23 1,237,456.23
BH 4,020,072.23
146,060.00 1,317,461.20
698,274.00 768,660.02
137,500.00 442,695.00
95,000.00 229,824.00
200,000.00 400,000.00
200,000.00 200,000.00
150,000.00 150,000.00
40,000.00 240,000.00
40,000.00 80,000.00
191,432.01 191,432.01
BH 1,752,225.25
146,060.00 657,270.00
706,686.00 583,015.95
90,000.00 148,500.00
200,000.00 200,000.00
40,000.00 80,000.00
83,439.30 83,439.30
BH 731,415.63
146,060.00 379,756.00
698,274.00 90,496.31
125,400.00 26,334.00
150,000.00 150,000.00
50,000.00 50,000.00
34,829.32 34,829.32
BH 1,299,307.85
146,060.00 628,058.00
698,274.00 164,234.04
125,400.00 45,144.00
150,000.00 300,000.00
50,000.00 100,000.00
61,871.80 61,871.80
BH 1,630,514.56
146,060.00 905,572.00
698,274.00 164,234.04
125,400.00 83,064.96
150,000.00 300,000.00
50,000.00 100,000.00
77,643.55 77,643.55
BH 1,646,817.20
146,060.00 1,372,964.00
114,583.33 195,433.33
78,419.87 78,419.87
BH 758,630.95
146,060.00 642,664.00
114,583.33 79,841.67
36,125.28 36,125.28
BH 6,639,251.64
146,060.00 4,199,225.00
698,274.00 432,929.88
125,400.00 890,941.92
150,000.00 600,000.00
50,000.00 200,000.00
316,154.84 316,154.84
BH 5,379,916.21
146,060.00 3,242,532.00
698,274.00 432,929.88
125,400.00 648,267.84
150,000.00 600,000.00
50,000.00 200,000.00
256,186.49 256,186.49
BH 3,986,698.72
146,060.00 2,285,839.00
698,274.00 432,929.88
125,400.00 278,087.04
150,000.00 600,000.00
50,000.00 200,000.00
189,842.80 189,842.80
BH 3,362,626.93
146,060.00 1,723,508.00
698,274.00 418,964.40
125,400.00 260,029.44
150,000.00 600,000.00
50,000.00 200,000.00
160,125.09 160,125.09
BH 2,964,461.26
146,060.00 1,504,418.00
698,274.00 349,137.00
125,400.00 169,741.44
150,000.00 600,000.00
50,000.00 200,000.00
141,164.82 141,164.82
BH 2,853,070.88
146,060.00 1,424,085.00
698,274.00 335,171.52
125,400.00 157,953.84
150,000.00 600,000.00
50,000.00 200,000.00
135,860.52 135,860.52
BH 3,442,260.07
146,060.00 1,767,326.00
698,274.00 432,929.88
125,400.00 278,087.04
150,000.00 600,000.00
50,000.00 200,000.00
163,917.15 163,917.15
BH 4,585,236.52
146,060.00 3,899,802.00
125,400.00 467,089.92
218,344.60 218,344.60
BH 2,760,152.39
146,060.00 2,066,749.00
125,400.00 561,967.56
131,435.83 131,435.83
BH 8,897,512.24
146,060.00 5,506,462.00
698,274.00 572,584.68
125,400.00 1,594,774.50
150,000.00 600,000.00
50,000.00 200,000.00
423,691.06 423,691.06
BH 7,200,322.88
146,060.00 4,228,437.00
698,274.00 586,550.16
125,400.00 1,242,463.20
150,000.00 600,000.00
50,000.00 200,000.00
342,872.52 342,872.52
BH 10,952,495.23
146,060.00 6,981,668.00
698,274.00 586,550.16
125,400.00 2,062,729.68
150,000.00 600,000.00
50,000.00 200,000.00
521,547.39 521,547.39
BH 49,529,173.05
146,060.00 6,185,641.00
146,060.00 4,089,680.00
1,089,000.00 36,895,320.00
2,358,532.05 2,358,532.05
perm2 1,461,900.03
BH 65,826,394.20
146,060.00 7,069,304.00
146,060.00 5,550,280.00
1,089,000.00 50,072,220.00
3,134,590.20 3,134,590.20
perm2 1,431,631.02
BH 3,136,356.44
146,060.00 1,402,176.00
137,500.00 361,790.00
95,000.00 133,000.00
173,998.00 647,272.56
27,777.78 218,888.89
28,411.00 223,878.68
149,350.31 149,350.31
BH 2,668,713.88
146,060.00 1,241,510.00
137,500.00 292,215.00
95,000.00 106,875.00
173,998.00 532,433.88
27,777.78 182,222.22
28,411.00 186,376.16
127,081.61 127,081.61
BH 1,840,532.35
146,060.00 788,724.00
137,500.00 156,860.00
95,000.00 57,000.00
173,998.00 455,874.76
27,777.78 145,555.56
28,411.00 148,873.64
87,644.40 87,644.40
BH 2,182,171.41
146,060.00 917,256.80
137,500.00 212,520.00
95,000.00 77,900.00
173,998.00 528,953.92
27,777.78 168,888.89
28,411.00 172,738.88
103,912.92 103,912.92
BH 2,012,183.39
146,060.00 882,202.40
137,500.00 197,340.00
95,000.00 72,200.00
173,998.00 464,574.66
27,777.78 148,333.33
28,411.00 151,714.74
95,818.26 95,818.26
BH 3,767,287.21
146,060.00 1,679,690.00
137,500.00 421,245.00
95,000.00 158,175.00
173,998.00 807,350.72
27,777.78 257,777.78
28,411.00 263,654.08
179,394.63 179,394.63
BH 7,084,451.96
173,998.00 3,706,157.40
27,777.78 1,183,333.33
91,168.70 647,297.77
28,411.00 1,210,308.60
337,354.86 337,354.86
BH 2,499,435.46
173,998.00 1,318,904.84
27,777.78 421,111.11
91,168.70 209,688.01
28,411.00 430,710.76
119,020.74 119,020.74
BH 3,518,849.68
147,105.00 710,517.15
117,180.00 615,195.00
72,450.00 673,785.00
163,130.00 606,582.59
95,000.00 209,000.00
703,769.94 703,769.94
BH 4,271,253.46
147,105.00 831,143.25
117,180.00 738,234.00
72,450.00 786,807.00
163,130.00 708,131.02
137,500.00 352,687.50
854,250.69 854,250.69
BH 3,175,923.39
147,105.00 581,064.75
117,180.00 615,195.00
72,450.00 553,518.00
163,130.00 484,724.48
173,998.00 306,236.48
635,184.68 635,184.68
BH 1,575,187.52
147,105.00 286,854.75
117,180.00 369,117.00
72,450.00 265,167.00
163,130.00 208,512.77
173,998.00 130,498.50
315,037.50 315,037.50
BH 2,761,528.45
147,105.00 588,420.00
117,180.00 527,310.00
72,450.00 572,355.00
163,130.00 326,260.00
173,998.00 194,877.76
552,305.69 552,305.69
per m1 699,121.13
BH 703,565.10
21,466.67 328,654.67
15,493.33 192,504.67
182,405.77 182,405.77
2,084,375.00
106,250.00 1,275,000.00
78,500.00 392,500.00
416,875.00 416,875.00
ANALISA PEKERJAAN PERSIAPAN
Pembersihan lapangan
pembersihan lapangan Ls 1.0000 12,950,000.00 12,950,000.00
Sub total -
STANDAR HARGA SATUAN
UPAH, BAHAN DAN ALAT
2017
HARGA SATUAN
URAIAN SATUAN KODE
(Rp.)
1 2 3 4 5
I. TENAGA
1. Pekerja OH L.01 85,000.00
2. Tukang Batu OH L.02 110,000.00
3. Tukang Kayu OH L.03 110,000.00
4. Tukang Besi OH L.04 110,000.00
5. Tukang Besi Konstruksi OH L.05 110,000.00
6. Tukang Pipa OH L.06 110,000.00
7. Tukang Las Biasa OH L.07 110,000.00
8. Tukang Cat OH L.08 110,000.00
9. Tukang Vibrator OH L.09 110,000.00
10. Tukang erection OH L.10 110,000.00
11. Tukang Las Konstruksi OH L.11 110,000.00
12. Tukang Khusus Alumunium OH L.12 110,000.00
13. Tukang gali OH L.13 110,000.00
14. Tukang aspal OH L.14 110,000.00
15. Tukang listrik OH L.15 110,000.00
16. Kepala Tukang OH L.16 120,000.00
17. Mandor OH L.17 110,000.00
18. Juru ukur OH L.18 161,280.00
19. Operator alat berat OH L.19 120,000.00
20. Operator pompa OH L.20 85,000.00
21. Mekanik alat berat OH L.21 75,000.00
22. Pembantu operator alat berat OH L.22 70,000.00
23. Pembantu mekanik alat berat OH L.23 70,000.00
24. Koordinator driller OH L.24 159,000.00
25. Driller OH L.25 161,500.00
26. Pembantu driller OH L.26 70,000.00
27. Crew driller OH L.27 70,000.00
28. Ahli geologist OH L.28 161,500.00
29. Administrasi bor OH L.29 70,000.00
30. Sopir OH L.30 85,000.00
31. Supir kendaraan < 2 ton (termasuk sedan) OH L.31 85,000.00
32. Kenek OH L.32 70,000.00
1 2 3 4 5
MATERIAL KAYU
1. Kayu jati (balok) m³ M.60 24,240,000.00
2. Kayu jati (papan) m³ M.61 24,240,000.00
3. Kayu kamper (balok) m³ M.62 10,100,000.00
4. Kayu kamper (papan) m³ M.63 10,100,000.00
5. Kayu bengkirai (balok) m³ M.64 11,402,000.00
6. Kayu bengkirai (papan) m³ M.65 11,402,000.00
7. Kayu kruing (balok) m³ M.66 7,575,000.00
8. Kayu kruing (papan) m³ M.67 7,575,000.00
10. Kayu bekisting m³ M.69 2,808,200.00
11. Kayu perancah m³ M.70 2,808,200.00
12. Dolken kayu jati Ø 10 cm batang M.74 72,600.00
15. Bambu Ø 10 cm panjang 600 cm batang M.77 30,300.00
16. Bambu cerucuk Ø 10 cm panjang 600 cm batang M.77 30,300.00
20. Kayu bengkirai (balok kaso 5x7) m3 M.81 10,605,000.00
30. Kayu terentang (bekisting) m3 M.91 2,808,200.00
33. Teakwood 4 mm (120x240) lembar M.94 62,700.00
35. Plywood 9 mm (120x240) lembar M.96 151,200.00
38. Multiplek tebal 18 mm lembar M.99 247,400.00
39. Multiplek tebal 12 mm lembar M.99 176,000.00
39. Multiplek tebal 0,9 cm lembar M.100 151,200.00
40. Multiplek tebal 0,6 cm lembar M.101 80,800.00
42. Tripleks t=4mm, 120x240 cm lembar M.103 62,700.00
MATERIAL BESI DAN BAJA
1. Baja tulangan polos U-24 kg M.157 10,600.00
2. Baja tulangan ulir U-32 kg M.158 10,600.00
3. Baja (ulir) U-39 kg M.159 10,600.00
4. Baja (ulir) U-48 kg M.160 11,100.00
5. Besi profil kg M.161 14,030.00
6. Besi siku kg M.162 7,250.00
7. Besi strip kg M.163 17,670.00
8. Besi plat kg M.164 17,620.00
9. Besi angkur/mur/baut kg M.165 16,250.00
10. Besi hollow 50.50.3 kg M.166 12,000.00
11. Jaring Kawat Baja dilas kg M.167 14,500.00
12. Baja Tahan Karat ( Stainless Steel ) kg M.168 78,000.00
13. Kawat galvanis Ø 3 mm kg M.169 13,000.00
14. Kawat galvanis Ø 4 mm kg M.170 13,500.00
15. Kawat galvanis Ø 5 mm kg M.171 20,110.00
16. Kawat beton kg M.172 16,210.00
17. Paku kg M.173 14,740.00
18. Paku sekrup kg M.174 35,350.00
19. Paku payung kg M.175 22,500.00
20. Paku pancing 6x23 kg M.176 24,500.00
21. Paku hak panj 15cm kg M.177 23,500.00
22. Kawat las listrik kg M.178 72,500.00
23. Kawat nyamuk m3 M.179 20,200.00
24. Saringan pasir m' M.180 16,000.00
25. Sekrup kait buah M.181 650.00
26. Kawat duri m' M.182 7,570.00
27. Kawat bronjong kg M.183 13,750.00
28. Kawat nyamuk nylon m2 M.184 15,500.00
29. Besi lis kaca (1 x 1) cm m' M.185 25,000.00
30. Dinabolt dia 12mm (10-15cm) buah M.186 10,000.00
31. Lapisan hot deep galvanis kg M.187 8,000.00
HARGA SATUAN
URAIAN SATUAN KODE
(Rp.)
1 2 3 4 5
MATERIAL PAVING
1. Paving block 6 cm abu-abu K-200 m² M.188 70,000.00
2. Paving block 6 cm warna K-200 m² M.189 77,000.00
3. Paving block 6 cm abu-abu K-300 m² M.190 84,200.00
4. Paving block 6 cm warna K-300 m² M.191 119,200.00
5. Paving block 8 cm abu-abu K-300 m² M.192 115,200.00
6. Paving block 8 cm warna K-300 m² M.193 150,200.00
7. Paving block 8 cm abu-abu K-400 m² M.194 123,200.00
8. Paving block 8 cm warna K-400 m² M.195 158,200.00
9. Paving block 10 cm abu-abu K-400 m² M.196 163,500.00
10. Paving block 10 cm warna K-400 m² M.197 198,500.00
11. Kanstin K-200, 10x20x50 cm buah M.198 17,500.00
12. Kerb (13/16x30x50) K-200 tipe A buah M.199 43,500.00
13. Kerb (18/21x30x50) K-200 tipe B buah M.200 52,500.00
MATERIAL DRAINASE
1. Buis beton Ø 20 cm buah M.201 45,400.00
2. Buis beton Ø 30 cm buah M.202 60,600.00
3. Buis beton Ø 40 cm buah M.203 65,600.00
4. Buis beton Ø 50 cm buah M.204 106,000.00
5. Buis beton Ø 60 cm buah M.205 136,600.00
6. Buis beton Ø 70 cm buah M.206 195,666.00
7. Buis beton Ø 80 cm buah M.207 171,700.00
8. Buis beton Ø 100 cm buah M.208 193,900.00
1 2 3 4 5
40. Fibre glass (jabes) 180x105 cm lembar M.386 69,666.00
41. Bubungan beton press buah M.387 5,033.00
42. Bubungan asbes kecil buah M.388 37,500.00
43. Bubungan asbes besar buah M.389 8,633.00
44. Alumunium gelombang tebal 0,55 buah M.390 179,000.00
45. Nok standar 40x18 buah M.391 66,750.00
46. Genteng aspal lembar M.392 137,500.00
47. Bitumen tekstur genting lembar M.393 56,375.00
48. Listplang tekstur kayu buah M.394 47,500.00
49. Listplang papan kalsiboard buah M.395 53,333.00
MATERIAL PLAFOND
1. Akustik ukuran 30 x 30 cm lembar M.396 5,500.00
2. Akustik ukuran 30 x 60 cm lembar M.397 9,000.00
3. Kalsiboard 4.5mm (120x240x4.5mm) lembar M.398 73,300.00
4. Gypsum Board (120 cm x 240 cm x 9 mm) lembar M.399 60,333.00
5. Gypsum Board (120 cm x 240 cm x 12 mm) lembar M.400 80,000.00
6. Pelat asbes tebal 3,5 mm lembar M.401 54,500.00
7. Pelat asbes tebal 4 mm lembar M.402 29,333.00
8. GRCboard (120 cm x 240 cm x 6 mm) m2 M.403 135,000.00
9. GRCboard (120 cm x 240 cm x 5 mm) m2 M.404 105,000.00
10. Listplank GRC (20 cm x 244 cm x 9 mm ) m2 M.405 62,500.00
11. List gypsum profil m' M.406 13,250.00
MATERIAL CAT
1. Cat dasar (cat kayu) kg M.457 42,500.00
2. Cat penutup (cat kayu) kg M.458 41,500.00
3. Cat dasar (cat besi) kg M.459 50,000.00
4. Cat antara (cat besi) kg M.460 41,333.00
5. Cat penutup (cat besi) kg M.461 41,333.00
6. Cat besi kg M.462 46,655.00
7. Cat anti karat kg M.463 36,500.00
8. Cat dasar (cat tembok interior) kg M.464 24,926.00
9. Cat penutup (cat tembok interior) Catylac kg M.465 37,000.00
10. Cat dasar (cat tembok exterior) kg M.464-a 40,000.00
11. Cat penutup (cat tembok exterior) Catylac kg M.465-a 60,000.00
12. Cat penutup (cat tembok easyclean) Dulux kg 53,350.00
13. Cat penutup (cat tembok Weathershield) Dulux kg 64,000.00
12. Cat tembok kg M.466 14,333.00
13. Cat coating liter M.467 55,000.00
HARGA SATUAN
URAIAN SATUAN KODE
(Rp.)
1 2 3 4 5
14. Cat genteng kg M.468 32,500.00
15. Cat kedap air ( water base) kg M.468-a 55,000.00
16. Meni kayu kg M.469 20,166.00
17. Meni besi kg M.470 21,333.00
18. Dempul kg M.471 14,750.00
19. Dempul jadi kg M.472 26,250.00
20. Ampelas lembar M.473 3,500.00
21. Kuas 4" buah M.474 11,000.00
22. Kuas 3" buah M.475 7,500.00
23. Kuas 2" buah M.476 6,000.00
24. Kuas 1" buah M.477 4,000.00
25. Plamir kayu kg M.478 30,000.00
26. Plamir tembok kg M.479 40,000.00
27. Politur liter M.480 38,500.00
28. Politur jadi liter M.481 33,333.00
29. Vernis liter M.482 23,500.00
30. Pengencer cat kayu/besi kg M.483 27,000.00
MATERIAL KACA
1. Jendela nako m2 M.509 300,000.00
2. Jendela nako (rangka + kaca 5 mm) m2 M.510 225,000.00
3. Kaca polos 3mm m2 M.511 75,000.00
4. Kaca polos 5mm m2 M.512 80,800.00
5. Kaca polos 8mm m2 M.513 151,500.00
6. Kaca buram 12 mm m2 M.514 300,000.00
7. Kaca cermin 5mm m2 M.515 151,500.00
8. Kaca cermin 6mm m2 M.516 250,000.00
9. Profil kaca m¹ M.517 12,500.00
10. Kaca patri 5mm m2 M.518 2,000,000.00
11. Kaca cermin 8mm m2 M.519 750,000.00
12. Kaca wireglass 5mm m2 M.520 135,000.00
13. Ray Band 3mm m2 M.521 80,000.00
14. Ray Band 5mm m2 M.522 103,100.00
15. Kaca gravire 5mm m2 M.523 750,000.00
16. Kaca gravire putih 5mm m2 M.524 700,000.00
17. Kaca lukis alur 5mm m2 M.525 650,000.00
18. Kaca triple 5mm m2 M.526 3,000,000.00
19. Kaca triple platinum 5mm m2 M.527 3,500,000.00
20. Kaca tanpa tripel 5mm m2 M.528 3,250,000.00
1 2 3 4 5
MATERIAL LAIN-LAIN
1. Air m³ M.760 15,833.00
2. Air, liter M.761 40.00
3. Gebalan Rumput Jenis Lamuran m² M.762 10,000.00
4. Ijuk m3 M.763 67,500.00
5. Karung plastik buah M.764 2,500.00
6. Sesek bambu (2x1,5m) m² M.765 11,000.00
7. Tali ijuk kg M.766 8,000.00
8. Formica lembar M.767 48,000.00
9. Ramset/dina bolt buah M.768 3,000.00
10. Rel pintu dorong buah M.769 222,500.00
11. Roster/terawang buah M.770 5,750.00
12. Sabun Kg M.771 19,500.00
13. Seal tape buah M.772 2,500.00
14. Aluminium foil m2 M.773 7,500.00
15. Soda api kg M.774 17,500.00
16. Wallpaper m2 M.775 28,500.00
17. Sealant tube M.776 33,000.00
18. Sealant kaca kg M.777 36,300.00
19. Batu apung kg M.778 5,500.00
20. Nako per daun buah M.779 8,200.00
21. Kapur m3 M.780 250,000.00
22. Screen low carbon m¹ M.781 522,500.00
23. Screen stainless steel ø 4" m¹ M.782 1,083,500.00
24. Pipa screen pvc Ø 4" m¹ M.783 90,000.00
25. Sesek bambu lembar M.784 17,500.00
26. Recorder paper set M.785 165,000.00
27. Alat tulis buah M.786 65,000.00
28. Bollard stainless steel (tinggi 1m ; Ø 4") buah M.787 525,000.00
29. Bollard cast iron (tinggi 1,2m ; Ø bawah 5" ; Ø atas 4") buah M.788 2,500,000.00
30. Batako (ukuran 40x20x10) buah M.789 4,000.00
31. Batako (ukuran 40x20x12) buah M.790 4,800.00
32. Batako (ukuran 40x20x15) buah M.791 6,000.00
33. Batako (ukuran 40x20x20) buah M.792 8,000.00
34. Hebel Block (ukuran 60x20x10 cm) buah M.793 16,607.00
35. Hebel Block (ukuran 60x20x15 cm) buah M.794 25,714.00
36. Hebel Block (ukuran 60x20x20 cm) buah M.795 46,904.00
37. Joint Sealent kg M.796 42,000.00
38. Pintu lipat (folding door) bahan plastik/PVC m2 M.797 200,000.00
39. Skrup fixer buah M.798 500.00
40. Sealant tube M.799 27,500.00
41. Plastic aerator buah M.800 15,000.00
42. Venetions blinds dan vertical blinds (tirai) m2 M.801 7,000.00
43. Lem kayu kg M.802 14,500.00
44. Lem vinyl kg M.803 24,333.00
45. Lem Aibon kg M.804 35,000.00
46. Perekat untuk wallpaper kg M.805 43,600.00
1 2 3 4 5
MU-470 White Tile Addesive kg 17,710.00
MU-480 Perekat Keramik diatas Keramik kg 17,365.00
MU-L500 Perekat Mortar & Beton kg 118,162.50
MU-600 Pelapis Kedap Air kg 44,083.33
MU-600 Pelapis Kedap Air kg 41,419.17
MU-700 Floor Hardener kg 6,463.00
MU-800 Non-Shrink Grout kg 4,513.75
MU-830 Perbaikan Permukaan Beton kg 7,561.25
MU-840 Finish Coat Repair kg 14,950.00
PRODUK LEMKRA
CB 109 | CEMENT BLITZ perekat keramik kolam renang tanpa kuras air) kg 64,955.00
PM 113 Plester warna kg 8,356.67
TG 302 Coating Anti jamur, lumut, pelapis batu alam, pelapis dinding anti UV Dof ltr 35,775.00
Wetlook ltr 44,775.00
FK 103 ( Perekat kedap air; perekat keramik granit pada besi kayu kaca kg 14,500.00
DS 105 ( Water Proofing dag beton, kolam renang, groundtank) kg 11,966.67
FK 111 ( Perekat Keramik Dinding, batu alam, nat alur minimalis) kg 6,733.33
FS NAT ( Pengisi Rongga Nat keramik, granit, marmer, batu alam ) standart kg 12,818.00
exclusive kg 17,227.00
FK 101 ( Perekat Keramik Lantai, keramik diatas keramik, Glass block) kg 5,356.67
Just Do It (perekat keramik) kg 3,466.67
CR 107 ( Concreate Repair, penghalus permukaan beton) kg 34,470.00
HF 007 (Perekat flexibel; dilatasi, sambungan GRC, sealent beton UPVC aluminium) kg 82,000.00
TG 301 lapisan primer waterproofing, pengikat debu, Ltr 22,600.00
Floor Hardener kg 5,336.67
LBM 116 Perekat bata ringan kg 3,650.00
PL 115 Plesteran Premium kg 2,875.00
Skim coat SC 114 Acian abu kg 4,606.67
putih kg 5,000.00
Just Do It Gunung Ceremai PGC (Perekat Bata ringan) kg 2,535.23
Just Do It Gunung Ceremai PLGC (Plesteran, screeding ) kg 1,778.40
Just Do It Acian kg 2,724.23
HARGA SATUAN PEKERJAAN
TAHUN 2017
(Belum termasuk PPN)
HARGA
NO URAIAN PEKERJAAN SATUAN KETERANGAN
SATUAN (Rp.)
I Pekerjaan persiapan
1 Pengukuran dan pemasangan 1 m' Bouwplank m2 125,040.00
2 Pembuatan 1 m2 kantor sementara lantai plesteran m2 1,152,119.00
3 Pembersihan 1 m2 lapangan dan perataan m2 15,400.00
4 Pembuatan 1 m2 jalan sementara m2 159,347.00
5 Pembongkaran 1 m3 beton bertulang m3 1,327,315.00
6 Pembongkaran 1 m3 dinding tembok bata m3 663,657.00
II Pekerjaan tanah
1 Penggalian 1 m3 tanah biasa sedalam 1 m m3 73,150.00
2 Penggalian 1 m3 tanah biasa sedalam 2 m m3 89,595.00
4 Menggali 1 m3 tanah keras sedalam 1 m m3 97,372.00
5 Menggali 1 m3 tanah cadas sedalam 1 m m3 147,510.00
6 Menggali 1 m3 tanah lumpur sedalam 1 m m3 117,645.00
9 Pengurugan kembali 1 m3 hasil galian tanah m3 1/3 galian tanah
10 Pemadatan tanah 1 m3 tanah ( per 20 cm) m3 52,800.00
11 Pengurugan 1 m3 dengan Pasir urug m3 187,660.00
13 Pengurugan 1 m3 Sirtu padat m3 266,376.00
III Pekerjaan pondasi
4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 861,797.00
6 Pemasangan 1 m3 batu kosong (anstamping) m3 484,011.00
IV Pekerjaan beton
4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa (K 100) slump (3-6) cm w/c = 0,87 m3 873,424.00
5 Membuat 1 m3 beton mutu f'c = 14,5 MPa (K 175) slump (12± 2) cm w/c = 0,66 m3 1,053,773.00
6 Membuat 1 m3 beton mutu f'c = 16,9 MPa (K 200) slump (12±2) cm w/c = 0,61 m3 1,089,123.00
7 Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225) slump (12±2) cm w/c = 0,58 m3 1,115,556.00
8 Membuat 1 m3 beton mutu f'c = 21,7 MPa (K 250) slump (12±2) cm w/c = 0,56 m3 1,133,079.00
13 Pembesian dengan besi tulangan polos kg 14,152.00
14 Pembesian dengan besi tulangan ulir kg 14,152.00
16 Pemasangan 1 m2 bekisting untuk pondasi (4 xpakai) m2 105,890.00
17 Pemasangan 1 m2 bekisting untuk sloof (4xpakai) m2 107,467.00
18 Pemasangan 1 m2 bekisting untuk kolom (2 x pakai) m2 203,811.00
19 Pemasangan 1 m2 bekisting untuk balok (2x pakai) m2 209,710.00
20 Pemasangan 1 m2 bekisting untuk lantai (2xpakai) m2 203,811.00
21 Pemasangan 1 m2 bekisting untuk dinding (2 x pakai) m2 236,598.00
22 Pemasangan 1 m2 bekisting untuk tangga (2x pakai) m2 196,627.00
24 Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm m' 77,906.00
25 Membuat 1 m' ring balok beton bertulang (10 x 15) cm m' 105,004.00
V Pekerjaan Besi & Alumunium
1 Pemasangan 1 kg besi profil kg 31,772.00
2 Pengerjaan pekerjaan perakitan besi profil kg 612.30
3 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 1,004,719.00
4 Pengerjaan 1 cm pengelasan dengan las listrik cm 4,864.00
7 Pemasangan 1 m kusen pintu aluminium m' 146,060.00
9 Pemasangan 1 m2 pintu kaca rangka alluminium m2 698,274.00
10 Pemasangan 1 m2 terali besi strip (2 x 3) mm m2 642,081.00
12 Pemasangan 1 m2 jendela nako & tralis m2 842,820.00
13 Pemasangan 1 m' talang datar/ jurai seng bjls 28 lebar 90 cm m' 334,379.00
14 Pemasangan 1 m talang ½ lingkaran D-15 cm seng plat bjls 30 lebar 45 cm m' 7,060.00
halaman 39
HARGA
NO URAIAN PEKERJAAN SATUAN KETERANGAN
SATUAN (Rp.)
15 Pemasangan 1 m2 rangka besi hollow 40.40.1,2 mm, modul 60 x 120 cm, dinding partisi m2 173,998.00
16 Pemasangan 1 m2 rangka besi hollow galvanis 40.40.0,7 mm, modul 60 x 60 cm, plafon m2 152,273.00
VI Pekerjaan Dinding Pasangan
9 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 5PP m2 107,495.00
10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP m2 106,337.00
11 Pemasangan 1m2 dinding bata ringan 10cm tebal ½ batu campuran mortar instan m2 150,790.00
IX Pekerjaan Plafond
1 Pemasangan 1 m2 langit-langit kalsiboard 4.5mm m2 40,841.00
5 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm tebal 9 mm m2 45,099.00
7 Pemasangan 1 m' list langit langit gypsum profil m' 32,057.00
8 Pemasangan 1 m' list langit langit kayu profil m' 25,886.00
halaman 40
HARGA
NO URAIAN PEKERJAAN SATUAN KETERANGAN
SATUAN (Rp.)
halaman 41
STANDAR ANALISA SATUAN PEKERJAAN
Pengurugan hasil galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
CATATAN
Bobot isi pasir = 1.400 kg/m3
Bobot isi kerikil = 1.350 kg/m3
Buckling factor pasir = 20 %
4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa (K 100) slump (3-6) cm w/c = 0,87
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.200 85,000.00 102,000.00
2 Tukang Batu L.02 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.16 OH 0.020 120,000.00 2,400.00
4 Mandor L.17 OH 0.060 110,000.00 6,600.00
JUMLAH HARGA TENAGA KERJA 133,000.00
B BAHAN
1 Portland cement M.434 kg 230.0 1,410.00 324,300.00
2 Pasir beton M.11 kg 893.0 168.00 150,024.00
3 Batu pecah M.29 kg 1027.0 174.00 178,698.00
4 Air, M.761 liter 200.0 40.00 8,000.00
JUMLAH HARGA BAHAN 661,022.00
C PERALATAN
5. Membuat 1 m3 beton mutu f'c = 14,5 MPa (K 175) slump (12± 2) cm w/c = 0,66
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 85,000.00 140,250.00
2 Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
3 Kepala Tukang L.16 OH 0.028 120,000.00 3,360.00
4 Mandor L.17 OH 0.083 110,000.00 9,130.00
JUMLAH HARGA TENAGA KERJA 182,990.00
B BAHAN
1 Portland cement M.434 kg 326.0 1,410.00 459,660.00
2 Pasir beton M.11 kg 760.0 168.00 127,680.00
3 Batu pecah M.29 kg 1029.0 174.00 179,046.00
4 Air, M.761 liter 215.0 40.00 8,600.00
JUMLAH HARGA BAHAN 774,986.00
C PERALATAN
6. Membuat 1 m3 beton mutu f'c = 16,9 MPa (K 200) slump (12±2) cm w/c = 0,61
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 85,000.00 140,250.00
2 Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
3 Kepala Tukang L.16 OH 0.028 120,000.00 3,360.00
4 Mandor L.17 OH 0.083 110,000.00 9,130.00
JUMLAH HARGA TENAGA KERJA 182,990.00
B BAHAN
1 Portland cement M.434 kg 352.0 1,410.00 496,320.00
2 Pasir beton M.11 kg 731.0 168.00 122,808.00
3 Batu pecah M.29 kg 1031.0 174.00 179,394.00
4 Air, M.761 liter 215.0 40.00 8,600.00
JUMLAH HARGA BAHAN 807,122.00
7. Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225) slump (12±2) cm w/c = 0,58
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 85,000.00 140,250.00
2 Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
3 Kepala Tukang L.16 OH 0.028 120,000.00 3,360.00
4 Mandor L.17 OH 0.083 110,000.00 9,130.00
JUMLAH HARGA TENAGA KERJA 182,990.00
B BAHAN
1 Portland cement M.434 kg 371.0 1,410.00 523,110.00
2 Pasir beton M.11 kg 698.0 168.00 117,264.00
3 Batu pecah M.29 kg 1047.0 174.00 182,178.00
4 Air, M.761 liter 215.0 40.00 8,600.00
JUMLAH HARGA BAHAN 831,152.00
C PERALATAN
8. Membuat 1 m3 beton mutu f'c = 21,7 MPa (K 250) slump (12±2) cm w/c = 0,56
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 85,000.00 140,250.00
2 Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
3 Kepala Tukang L.16 OH 0.028 120,000.00 3,360.00
4 Mandor L.17 OH 0.083 110,000.00 9,130.00
JUMLAH HARGA TENAGA KERJA 182,990.00
B BAHAN
1 Portland cement M.434 kg 384.0 1,410.00 541,440.00
2 Pasir beton M.11 kg 692.0 168.00 116,256.00
3 Batu pecah M.29 kg 1039.0 174.00 180,786.00
4 Air, M.761 liter 215.0 40.00 8,600.00
JUMLAH HARGA BAHAN 847,082.00
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.060 85,000.00 5,100.00
2 Tukang Las Konstruksi L.11 OH 0.060 110,000.00 6,600.00
3 Kepala Tukang L.16 OH 0.006 120,000.00 720.00
4 Mandor L.17 OH 0.003 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 12,750.00
B BAHAN
1 Besi profil M.161 kg 1.15 14,030.00 16,134.50
JUMLAH HARGA BAHAN 16,134.50
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.100 85,000.00 8,500.00
2 Tukang Besi Konstruksi L.05 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.16 OH 0.001 120,000.00 120.00
4 Mandor L.17 OH 0.005 110,000.00 550.00
JUMLAH HARGA TENAGA KERJA 20,170.00
B BAHAN
1 Solar (industri) M.545 liter 1.000 12,894.00 12,894.00
2 Minyak Pelumas M.552 liter 0.100 26,000.00 2,600.00
JUMLAH HARGA BAHAN 15,494.00
C PERALATAN
1 Sewa alat las E.61 jam 0.800 25,000.00 20,000.00
JUMLAH HARGA ALAT 20,000.00
3. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.050 85,000.00 89,250.00
2 Tukang Las Biasa L.07 OH 1.050 110,000.00 115,500.00
3 Kepala Tukang L.16 OH 0.105 120,000.00 12,600.00
4 Mandor L.17 OH 0.052 110,000.00 5,720.00
JUMLAH HARGA TENAGA KERJA 223,070.00
B BAHAN
1 Besi siku M.162 kg 15.000 7,250.00 108,750.00
2 Besi plat M.164 kg 32.800 17,620.00 577,936.00
3 Kawat las listrik M.178 kg 0.050 72,500.00 3,625.00
JUMLAH HARGA BAHAN 690,311.00
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.040 85,000.00 3,400.00
2 Tukang Besi Konstruksi L.05 OH 0.020 110,000.00 2,200.00
3 Kepala Tukang L.16 OH 0.002 120,000.00 240.00
4 Mandor L.17 OH 0.002 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 6,060.00
B BAHAN
1 Kawat las listrik M.178 kg 0.400 72,500.00 29,000.00
2 Solar (industri) M.545 liter 0.300 12,894.00 3,868.20
3 Minyak Pelumas M.552 liter 0.040 26,000.00 1,040.00
JUMLAH HARGA BAHAN 33,908.20
C PERALATAN
1 Sewa alat las E.61 jam 0.170 25,000.00 4,250.00
JUMLAH HARGA ALAT 4,250.00
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.200 85,000.00 17,000.00
2 Tukang batu L.02 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.16 OH 0.020 120,000.00 2,400.00
4 Mandor L.17 OH 0.001 110,000.00 110.00
JUMLAH HARGA TENAGA KERJA 41,510.00
B BAHAN
1 Seng plat bjls 30 M.367 m¹ 1.050 67,000.00 70,350.00
2 Paku M.173 kg 0.015 14,740.00 221.10
3 Kayu kamper (papan) M.63 m³ 0.019 10,100,000.00 191,900.00
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.150 85,000.00 12,750.00
2 Tukang batu L.02 OH 0.300 110,000.00 33,000.00
3 Kepala Tukang L.16 OH 0.030 120,000.00 3,600.00
4 Mandor L.17 OH 0.008 110,000.00 880.00
JUMLAH HARGA TENAGA KERJA 50,230.00
B BAHAN
1 Seng plat bjls 30 M.367 m¹ 1.050 67,000.00 70,350.00
2 Paku M.173 kg 0.010 14,740.00 147.40
3 Besi strip M.163 kg 0.500 17,670.00 8,835.00
JUMLAH HARGA BAHAN 79,332.40
C PERALATAN
16. Pemasangan 1 m2 rangka besi hollow galvanis 40.40.0,7 mm, modul 60 x 60 cm, plafon
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.3500 85,000.00 29,750.00
2 Tukang Besi L.04 OH 0.3500 110,000.00 38,500.00
3 Kepala Tukang L.16 OH 0.0350 120,000.00 4,200.00
4 Mandor L.17 OH 0.0180 110,000.00 1,980.00
JUMLAH HARGA TENAGA KERJA 74,430.00
B BAHAN
1 Hollow galvanis 40x40x0,7 mm M1 4.000 8,000.00 32,000.00
2 Assesoris (perkuatan las dll) Ls 100%xrangka 32,000.00
9. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 5PP
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.300 85,000.00 25,500.00
2 Tukang Batu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.16 OH 0.010 120,000.00 1,200.00
4 Mandor L.17 OH 0.015 110,000.00 1,650.00
JUMLAH HARGA TENAGA KERJA 39,350.00
B BAHAN
1 Bata merah 5 x 11 x 22 cm M.27 buah 70.000 500.00 35,000.00
2 Portland cement M.434 kg 9.680 1,410.00 13,648.80
3 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.045 216,100.00 9,724.50
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.300 85,000.00 25,500.00
2 Tukang Batu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.16 OH 0.010 120,000.00 1,200.00
4 Mandor L.17 OH 0.015 110,000.00 1,650.00
JUMLAH HARGA TENAGA KERJA 39,350.00
B BAHAN
1 Bata merah 5 x 11 x 22 cm M.27 buah 70.00 500.00 35,000.00
2 Portland cement M.434 kg 8.320 1,410.00 11,731.20
3 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.049 216,100.00 10,588.90
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.300 85,000.00 25,500.00
2 Tukang Batu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.16 OH 0.015 120,000.00 1,800.00
4 Mandor L.17 OH 0.015 110,000.00 1,650.00
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.300 85,000.00 25,500.00
2 Tukang Batu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.16 OH 0.015 120,000.00 1,800.00
4 Mandor L.17 OH 0.015 110,000.00 1,650.00
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.080 85,000.00 6,800.00
2 Tukang Batu L.02 OH 0.400 110,000.00 44,000.00
3 Kepala Tukang L.16 OH 0.040 120,000.00 4,800.00
4 Mandor L.17 OH 0.004 110,000.00 440.00
JUMLAH HARGA TENAGA KERJA 56,040.00
B BAHAN
1 Portland cement M.434 kg 0.500 1,410.00 705.00
2 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.013 216,100.00 2,809.30
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.400 85,000.00 34,000.00
2 Tukang Kayu L.03 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.16 OH 0.020 120,000.00 2,400.00
4 Mandor L.17 OH 0.002 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 58,620.00
B BAHAN
1 Bubung genteng palentong M.355 buah 5.000 10,000.00 50,000.00
2 Portland cement M.434 kg 8.000 1,410.00 11,280.00
3 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.032 216,100.00 6,915.20
JUMLAH HARGA BAHAN 68,195.20
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.400 85,000.00 34,000.00
2 Tukang Kayu L.03 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.16 OH 0.020 120,000.00 2,400.00
4 Mandor L.17 OH 0.002 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 58,620.00
B BAHAN
1 Bubung genteng kodok M.354 buah 5.000 6,100.00 30,500.00
2 Portland cement M.434 kg 8.000 1,410.00 11,280.00
3 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.032 216,100.00 6,915.20
JUMLAH HARGA BAHAN 48,695.20
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.400 85,000.00 34,000.00
2 Tukang Kayu L.03 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.16 OH 0.020 120,000.00 2,400.00
4 Mandor L.17 OH 0.002 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 58,620.00
B BAHAN
1 Bubung genteng palentong M.355 buah 4.00 10,000.00 40,000.00
2 Portland cement M.434 kg 8.00 1,410.00 11,280.00
3 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.032 216,100.00 6,915.20
JUMLAH HARGA BAHAN 58,195.20
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.400 85,000.00 34,000.00
2 Tukang Kayu L.03 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.16 OH 0.020 120,000.00 2,400.00
4 Mandor L.17 OH 0.020 110,000.00 2,200.00
JUMLAH HARGA TENAGA KERJA 60,600.00
B BAHAN
1 Nok genteng beton M.356 buah 3.500 7,500.00 26,250.00
2 Paku M.173 kg 0.050 14,740.00 737.00
3 Portland cement M.434 kg 10.800 1,410.00 15,228.00
4 Pasir pasang muntilan (quarry-lokasi pekerjaan) M.26 m³ 0.032 216,100.00 6,915.20
5 Semen warna M.433 kg 1.000 12,120.00 12,120.00
JUMLAH HARGA BAHAN 61,250.20
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.125 85,000.00 10,625.00
2 Tukang Kayu L.03 OH 0.250 110,000.00 27,500.00
3 Kepala Tukang L.16 OH 0.025 120,000.00 3,000.00
4 Mandor L.17 OH 0.006 110,000.00 660.00
JUMLAH HARGA TENAGA KERJA 41,785.00
B BAHAN
1 Nok genteng aspal M.359 lembar 2.00 85,000.00 170,000.00
2 Paku M.173 kg 0.05 14,740.00 737.00
3 Kayu kamper (balok) M.62 m³ 0.0035 10,100,000.00 35,350.00
JUMLAH HARGA BAHAN 206,087.00
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.250 85,000.00 21,250.00
2 Tukang Kayu L.03 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.16 OH 0.015 120,000.00 1,800.00
4 Mandor L.17 OH 0.013 110,000.00 1,430.00
JUMLAH HARGA TENAGA KERJA 40,980.00
B BAHAN
1 Nok genteng metal M.358 lembar 1.10 50,000.00 55,000.00
2 Paku M.173 kg 0.05 14,740.00 737.00
JUMLAH HARGA BAHAN 55,737.00
C PERALATAN
10. Pengecatan 1 m2 tembok baru (1 lps plamuur, 1 lps cat dasar, 2 lps cat penutup) - interior
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.020 85,000.00 1,700.00
2 Tukang Cat L.08 OH 0.063 110,000.00 6,930.00
3 Kepala Tukang L.16 OH 0.0063 120,000.00 756.00
4 Mandor L.17 OH 0.003 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 9,716.00
B BAHAN
1 Plamir tembok M.479 kg 0.10 40,000.00 4,000.00
2 Cat dasar (cat tembok interior) M.464 kg 0.10 24,926.00 2,492.60
3 Cat penutup (cat tembok interior) M.465 kg 0.26 37,000.00 9,620.00
JUMLAH HARGA BAHAN 16,112.60
C PERALATAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.005 85,000.00 425.00
2 Tukang Batu L.02 OH 0.001 110,000.00 110.00
3 Mandor L.17 OH 0.00025 110,000.00 27.50
JUMLAH HARGA TENAGA KERJA 562.50
B BAHAN
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pemasangan 1m2 Keramik tile ukuran 30cm x60cm dengan mortar instan
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja - OH 0.250 85,000.00 21,250.00
2 Tukang Batu L.02a OH 0.125 110,000.00 13,750.00
3 Kepala Tukang - OH 0.013 120,000.00 1,560.00
4 Mandor - OH 0.013 110,000.00 1,430.00
JUMLAH HARGA TENAGA KERJA 37,990.00
B BAHAN
1 Keramik Tile 30 x 60 cm M.458 bh 5.500 21,666.67 119,166.67
2 Semen Instant MU 450 M.485c kg 5.000 7,705.00 38,525.00
3 Semen warna M.481 kg 1.300 12,120.00 15,756.00
JUMLAH HARGA BAHAN 173,447.67
C PERALATAN
Pemasangan 1m2 Keramik tile ukuran 30cm x30cm dengan mortar instan
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja - OH 0.250 85,000.00 21,250.00
2 Tukang Batu L.02a OH 0.125 110,000.00 13,750.00
3 Kepala Tukang - OH 0.013 120,000.00 1,560.00
4 Mandor - OH 0.013 110,000.00 1,430.00
JUMLAH HARGA TENAGA KERJA 37,990.00
B BAHAN
1 Keramik Tile 30 x 30 cm M.458 bh 11.000 9,545.45 105,000.00
2 Semen Instant MU 450 M.485c kg 5.000 7,705.00 38,525.00
3 Semen warna M.481 kg 1.300 12,120.00 15,756.00
JUMLAH HARGA BAHAN 159,281.00
C PERALATAN
Pemasangan 1m2 dinding bata ringan 10cm tebal ½ batu campuran mortar instan
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja - OH 0.200 85,000.00 17,000.00
2 Tukang Batu L.02a OH 0.100 110,000.00 11,000.00
3 Kepala Tukang - OH 0.010 120,000.00 1,200.00
4 Mandor - OH 0.010 110,000.00 1,100.00
JUMLAH HARGA TENAGA KERJA 30,300.00
B BAHAN
1 Bata Ringan (ukuran 60x20x10 cm) M.847 m³ 0.100 750,000.00 75,000.00
2 Semen Instant MU 380 M.484 kg 4.000 4,830.00 19,320.00
JUMLAH HARGA BAHAN 94,320.00
C PERALATAN
1 Alat bantu ls 1.00 12,462.00 12,462.00
JUMLAH HARGA ALAT 12,462.00
13.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup easy clean)
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.020 85,000.00 1,700.00
2 Tukang Cat L.02f OH 0.063 110,000.00 6,930.00
3 Kepala Tukang L.03 OH 0.0063 120,000.00 756.00
4 Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 9,716.00
13.10.a Pengecatan 1 m2 tembok baru dinding luar ws ( 1 lapis alkali primer, 1 lapis cat dasar, 2 lapis cat penutup)
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.020 85,000.00 1,700.00
2 Tukang Cat L.02f OH 0.063 110,000.00 6,930.00
3 Kepala Tukang L.03 OH 0.0063 120,000.00 756.00
4 Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 9,716.00
B BAHAN
1 Alkali primer M.526 kg 0.10 40,000.00 4,000.00
2 Cat dasar (cat tembok) M.507 kg 0.10 40,000.00 4,000.00
3 Cat penutup (cat tembok) M.511 kg 0.26 64,000.00 16,640.00
JUMLAH HARGA BAHAN 24,640.00
C PERALATAN
PEKERJAAN PONDASI
galian P1 190x190
P2 180x180
P3 160x160
P4 150x150
P5 130x130
P6 120x120
P7 100x100
P8 150x150
P9 120x120
P9 120x120
P2 180x180 Diameter
Tul atas atas arah x D13-150 13
arah y D13-150 13
Tul bawah bawah arah x D16-150 16
bawah y D16-150 16
Kaki ayam D12 12
P3 160x160 Diameter
Tul atas atas arah x D13-200 13
arah y D13-200 13
Tul bawah bawah arah x D16-200 16
bawah y D16-200 16
Kaki ayam D12 12
P4 150x150 Diameter
Tul atas atas arah x D13-200 13
arah y D13-200 13
Tul bawah bawah arah x D16-200 16
bawah y D16-200 16
Kaki ayam D12 12
P5 130x130 Diameter
Tul atas atas arah x D13-200 13
arah y D13-200 13
Tul bawah bawah arah x D16-200 16
bawah y D16-200 16
Kaki ayam D12 12
P6 120x120 Diameter
Tul atas atas arah x D13-200 13
arah y D13-200 13
Tul bawah bawah arah x D16-200 16
bawah y D16-200 16
Kaki ayam D12 12
P7 100x100 Diameter
Tul atas atas arah x D13-200 13
arah y D13-200 13
Tul bawah bawah arah x D16-200 16
bawah y D16-200 16
Kaki ayam D12 12
P8 150x150 Diameter
Tul atas atas arah x D13-100 13
arah y D13-200 13
Tul bawah bawah arah x D16-100 16
bawah y D16-200 16
Kaki ayam D12 12
P9 120x120 Diameter
Tul atas atas arah x D13-150 13
arah y D13-200 13
Tul bawah bawah arah x D16-150 16
bawah y D16-200 16
Kaki ayam D12 12
Dinding PITLFT
Beton
No Lokasi / as
Kolom L-L
Kolom -Kolom L
Panjang
Pembesian PITLIFT
No Lokasi / as Diameter
arah y
pengurang kolom K1
K2
K3
K4
K10
K11
Bekesting
Pembesian sloof S1
No Lokasi / as Diameter
arah y
pengurang kolom K10
Bekesting
Pembesian sloof S2
No Lokasi / as Diameter
arah y
pengurang kolom K2
K3
K4
K12
K12
Bekesting
Pembesian sloof S3
No Lokasi / as Diameter
Panjang sloof
Pembesian sloof SP
No Lokasi / as Diameter
Vol beton/m1
Bekesting K1 55x55
K2 55x55
K3 55x55
K4 35x55
K10 35x35
K11 25x25
K12 20x30
KL 20/40 x 20/40
Pembesian K1 55x55
No Lokasi / as Diameter
Pembesian K2 55x55
No Lokasi / as Diameter
Pembesian K3 55x55
No Lokasi / as Diameter
Pembesian K4 35x55
No Lokasi / as Diameter
KL 20x40
No Lokasi / as Diameter
LANTAI 1
Beton kolom
K1 55x55
K2 55x55
K3 55x55
K4 35x55
K10 35x35
K11 25x25
K12 20x30
KL 20/40 x 20/40
Bekesting K1 55x55
K2 55x55
K3 55x55
K4 35x55
K10 35x35
K11 25x25
K12 20x30
KL 20/40 x 20/40
Pembesian K1 55x55
No Lokasi / as Diameter
Pembesian K2 55x55
No Lokasi / as Diameter
Pembesian K3 55x55
No Lokasi / as Diameter
Pembesian K4 35x55
No Lokasi / as Diameter
KL 20x40
No Lokasi / as Diameter
Beton Balok uk
B11 20x30
B12 20x30
R3 25x50
Separator lift 15X25
Bekesting
B11 20x30
B12 20x30
R3 25x50
Separator lift 15X25
Pembesian B1 20x30
No Lokasi / as Diameter
Pembesian B2 20x30
No Lokasi / as Diameter
Pembesian R3 25x50
No Lokasi / as Diameter
Tul atas Tumpuan 5D16 16
Lapangan 3D16 16
Tul bawah Tumpuan 3D16 16
Lapangan 5D16 16
Beugel Tumpuan D10-150 10
Lapangan D10-200 10
Tul samping 2D13 13
Vol beton/m2
Trap Tangga
trap D8-150 8
pengunci 1D10 10
Vol beton/m1
Vol beton/m1
Vol beton/m2
Trap Tangga
trap D8-150 8
pengunci 1D10 10
Vol beton/m1
Vol beton/m1
Bekesting
LANTAI 2
BALOK
LANTAI 2
Beton Balok uk
B1 30x70 arah x
arah y
B2 30x70 arah x
arah y
B3 30x70 arah x
arah y
B4 25x70 arah x
arah y
B5 25x70 arah x
arah y
B6 25X60 arah x
arah y
B7 25X40 arah x
arah y
B8 25X40 arah x
arah y
B9 20X40 arah x
arah y
Bekesting
B1 30x70 arah x
B2 30x70 arah x
B3 30x70 arah x
B4 25x70 arah x
B5 25x70 arah x
B6 25X60 arah x
B7 25X40 arah x
B8 25X40 arah x
B9 20X40 arah x
B10 15X25 arah x
B11 20X30 arah x
B12 20X30 arah x
Separator lift 15X25 arah x
Pembesian B1 30x70
No Lokasi / as Diameter
Pembesian B2 30x70
No Lokasi / as Diameter
Pembesian B3 30x70
No Lokasi / as Diameter
Pembesian B4 25x70
No Lokasi / as Diameter
Pembesian B5 25x70
No Lokasi / as Diameter
Pembesian B6 25X60
No Lokasi / as Diameter
Pembesian B7 25X40
No Lokasi / as Diameter
Tul atas Tumpuan 2D25 25
Lapangan 2D25 25
Tul bawah Tumpuan 2D25 25
Lapangan 2D25 25
Beugel Tumpuan D10-150 10
Lapangan D10-200 10
Tul samping 13
Pembesian B8 25X40
No Lokasi / as Diameter
Pembesian B9 20X40
No Lokasi / as Diameter
Pembesian
Pembesian plat 12cm
No Lokasi / as Diameter
Bekesting K5 40x40
K6 40x40
K7 35x40
K10 35x35
K11 25x25
KL 20/40 x 20/40
Pembesian K5 40x40
No Lokasi / as Diameter
Pembesian K6 40x40
No Lokasi / as Diameter
Pembesian K7 35x40
No Lokasi / as Diameter
KL 20x40
No Lokasi / as Diameter
Vol beton/m2
Trap Tangga
trap D8-150 8
pengunci 1D10 10
Vol beton/m1
Vol beton/m1
Vol beton/m2
Trap Tangga
trap D8-150 8
pengunci 1D10 10
Vol beton/m1
Vol beton/m1
Bekesting
LANTAI 3
BALOK
LANTAI 3
Beton Balok uk
B1 30x70 arah x
arah y
B2 30x70 arah x
arah y
B3 30x70 arah x
arah y
B4 25x70 arah x
arah y
B5 25x70 arah x
arah y
B6 25X60 arah x
arah y
B7 25X40 arah x
arah y
B8 25X40 arah x
arah y
B9 20X40 arah x
arah y
Bekesting
B1 30x70 arah x
B2 30x70 arah x
B3 30x70 arah x
B4 25x70 arah x
B5 25x70 arah x
B6 25X60 arah x
B7 25X40 arah x
B8 25X40 arah x
B9 20X40 arah x
B10 15X25 arah x
Separator lift 15X25 arah x
Bekesting K8 40x40
K9 35x40
K10 35x35
KL 20/40 x 20/40
Pembesian K8 40x40
No Lokasi / as Diameter
Pembesian K9 35x40
No Lokasi / as Diameter
KL 20x40
No Lokasi / as Diameter
Bekesting
BALOK
LANTAI Ring / Atap
Beton Balok uk
R1 30x70 arah x
arah Y
R2 30x70 arah x
arah Y
BA 25x70 arah x
arah Y
BB 25X35 arah x
arah Y
BC 20x30 arah x
arah Y
Bekesting
R1 30x70
R2 30x70
BA 25x70
BB 25X35
BC 20x30
Pembesian R1 30x70
No Lokasi / as Diameter
Pembesian R2 30x70
No Lokasi / as Diameter
Pembesian BA 25x70
No Lokasi / as Diameter
Pembesian BB 25x35
No Lokasi / as Diameter
Pembesian BC 20x30
No Lokasi / as Diameter
Tul atas Tumpuan 3D16 16
Lapangan 3D16 16
Tul bawah Tumpuan 3D16 16
Lapangan 3D16 16
Beugel Tumpuan D10-150 10
Lapangan D10-200 10
Tul samping 13
Beton Talang
Bekesting
Bekesting Dag KM
Dag Portal
Dag tangga
Pembesian plat
No Lokasi / as Diameter
Beton kolom
K8 40x40
KL 20/40 x 20/40
Bekesting K8 40x40
KL 20/40 x 20/40
ATAP BANGUNAN UTAMA
No Lokasi / as
Profil IWF 250.125.6.9
250.125.6.9 tepi
tengah
Plat kopel t = 10 mm
sepatu IWF t 10
Gording C150.65.20.2,3
Sepatu gording L50.50.5
Trekstang ø10
Ikatan angin ø16
Water moor ø19
Gording C150.65.20.2,3
Sepatu gording L50.50.5
Trekstang ø10
Ikatan angin ø16
Water moor ø19
Penutup atap
Atap genteng keramik glasur
Nok genteng keramik glasur
Tutup keong kalsiboard pertemuan kanopy depan
Mahkota atap (Murda)
Asesoris jurai atap (Ciledu)
Canopy depan
Rangka baja termasuk zinchromate
KUDA KUDA BAJA KB3
Profil 2L.50.50.5
2L.40.40.4
Pipa Dia. 6 class A
Plat buhul t = 10 mm
Plat Landas tebal 10mm
Baut ø12
Angkur ø19
Angkur 19mm - 60
KUDA KUDA BAJA KS
Profil 2L.60.60.6
2L.50.50.5
Pipa Dia. 6 class A
Plat buhul t = 10 mm
Plat Landas tebal 10mm
Baut ø16
ø12
Angkur ø19
Gording C150.65.20.2,3
Sepatu gording L50.50.5
Trekstang ø10
Ikatan angin ø16
Water moor ø19
Penutup atap
Atap genteng keramik glasur 35'
25'
Canopy Belakang
Rangka baja termasuk zinchromate
Profil IWF 200.100.5.5,8
Gording C125.50.20.2,3
Trekstang ø10
Ikatan angin ø16
Water moor ø19
Pipa Ikat dia. 2" medium
Plat Tumpu 491x200x12 mm
Angkur 19mm - 60
Pelapisan dengan Aluminium Composit Panel (ACP)
PVDF warna , t 0.4mm termasuk rangka siku / hollow
Panjang lebar rata tinggi quantity faktor Jumlah
2.300 2.300 2.100 3.000 1.000 33.327 m3 P1
2.200 2.200 2.100 6.000 1.000 60.984 P2
2.000 2.000 2.100 7.000 1.000 58.800 P3
1.900 1.900 2.100 23.000 1.000 174.363 P4
1.700 1.700 2.100 1.000 1.000 6.069 P5
1.600 1.600 2.100 6.000 1.000 32.256 P6
1.400 1.400 2.100 6.000 1.000 24.696 P7
1.900 1.900 2.100 1.000 1.000 7.581 P8
1.600 1.600 2.100 3.000 1.000 16.128 P9
204
239
443
443 1 1.1 1 1 487.3 m3
443 1 0.1 1 1 44.3 m3
443 1 0.2 1 1 88.6 m3
443 0.55 0.8 1 1 194.92 m3
24
8 0.3 0.7 1 1 1.68 m3
24 0.3 0.1 1 1 0.72 m3
24 0.3 0.6 1 1 4.32 m3
8 0.88 0.3 1 2 4.224
8 1.88 0.3 1 1 4.512
tot 8.736 m3
2.2 1 4 12 1 105.6 m2
2.2 1 4 28 1 246.4 m2
2.2 1 4 8 1 70.4 m2
1.8 1 4 2 1 14.4 m2
1.4 1 4 6 1 33.6 m2
1 1 4 2 1 8 m2
1 1 4 16 1 64 m2
1.6 1 4 3 1 19.2 m2
3 1 0.2 1 2 1.2
3 0.2 1 1 1 0.6
total 1.8 m3
Beton/m1 0.120
0.000
17.150
20.500
20.500
58.150
6.978 m3
Panjang lebar rata tinggi quantity faktor Jumlah
58.150 1.55 1 1 1 90.1325 m2
Panjang lebar rata tinggi quantity faktor Jumlah
48 0.3 0.58 1 1 8.352
88 0.3 0.58 1 1 15.312
136 23.664 m3
128 0.3 0.58 1 1 22.272
38 0.3 0.58 1 1 6.612
166 28.884 m3
124 0.3 0.58 1 1 21.576
130.8 0.3 0.58 1 1 22.7592
254.8 44.3352 m3
209 0.25 0.58 1 1 30.305
121.7 0.25 0.58 1 1 17.6465
330.7 47.9515 m3
16 0.25 0.58 1 1 2.32
8 0.25 0.58 1 1 1.16
24 3.48 m3
8 0.25 0.48 1 1 0.96
12 0.25 0.48 1 1 1.44
20 2.4 m3
0 0.25 0.28 1 1 0
6.3 0.25 0.28 1 1 0.441
6.3 0.441 m3
3.2 0.25 0.28 1 1 0.224
3.15 0.25 0.28 1 1 0.2205
6.35 0.4445 m3
73.95 0.2 0.28 1 1 4.1412
16.9 0.2 0.28 1 1 0.9464
90.85 5.0876 m3
0 0.15 0.13 1 1 0
4 0.15 0.13 1 1 0.078
4 0.078 m3
37.4 0.2 0.18 1 1 1.3464
13.6 0.2 0.18 1 1 0.4896
51 1.836 m3
11 0.2 0.18 1 1 0.396
25.35 0.2 0.18 1 1 0.9126
36.35 1.3086 m3
3 1 0.2 1 2 1.2
3 0.2 1 1 1 0.6
total 1.8 m3
Beton/m1 0.120
23.900
14.350
20.500
26.650
85.400
10.248 m3
Panjang lebar rata tinggi quantity faktor Jumlah
85.400 1.55 1 1 1 132.37 m2
Beton/m1 0.120
49.850
25.150
24.000
35.050
134.050
16.086 m3
Panjang lebar rata tinggi quantity faktor Jumlah
134.050 1.55 1 1 1 207.7775 m2
1.6 1 1.5 5 1 12
1.6 1 2.2 1 1 3.52
15.52 m2
1.6 1 2.2 3 1 10.56 m2
Panjang jml btg berat /m' quantity faktor Jumlah
7.76 2.00 29.600 7 1 3217.402 kg
1.00 1.00 29.600 7 1 207.200
1.00 1.00 29.600 7 1 207.200
3631.802
1 1 1 1 1 1
1 1 1 4 1 4
5.440
94.2
2.225565
520
640
520
640
0.825
640
Palta beton lantai 2 1850
69.1713 0.100
11897.792163675
tunggal
0.120
60.000
7.200
PEKERJAAN : PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS
UNIVERSITAS UDAYANA BALI
LOKASI : KABUPATEN BADUNG BALI
TAHUN ANGGARAN : 2017
PEKERJAAN PERSIAPAN
DAFTAR NO. 1 : PEKERJAAN PERSIAPAN Rp. 174,151,056.00
Terbilang : Rupiah
Semarang , 2017
Di Buat Oleh :
KONSULTAN PERENCANA
CV. ARETAS
Jumlah 174,151,056.00
2. PEKERJAAN TANAH
A PEKERJAAN TANAH
JUMLAH
212,512,410.00
36,178,602.24
213,804,756.00
724,387,200.00
76,694,000.00
698,301,344.00
1,961,878,312.24
1,961,878,312.24
===============
SATUAN VOLUME HARGA SATUAN
NO. URAIAN PEKERJAAN
(Rp.)
Sub Jumlah A
B SLOOF
2 SLOOF S2 ( 25x40cm )
a. beton mutu K-250 m3 2.33 1,133,079.00
b. berat tulangan kg 667.56 14,152.00
c. bekesting m2 18.64 107,467.00
3 SLOOF S3 ( 15x25cm )
a. beton mutu K-250 m3 2.36 1,133,079.00
b. berat tulangan kg 374.82 14,152.00
c. bekesting m2 31.50 107,467.00
Sub Jumlah B
SATUAN VOLUME HARGA SATUAN
NO. URAIAN PEKERJAAN
(Rp.)
Sub Jumlah C
D PIT LIFT
Sub Jumlah D
PENJUMLAHAN
Rp.
2,985,932.57
297,816.42
693,061.94
6,135,622.79
7,234,056.74
1,207,146.00
5,463,861.48
544,964.64
1,268,211.65
11,013,527.88
13,889,665.34
2,287,224.00
5,268,186.00
525,448.00
1,222,793.60
10,152,387.84
10,317,714.05
2,371,936.00
15,622,052.99
1,558,140.98
3,626,019.74
23,454,735.30
28,809,544.20
5,845,128.00
543,752.06
54,233.74
126,209.77
765,961.40
994,138.60
220,251.20
2,889,976.32
288,245.76
670,789.63
3,915,921.02
5,653,359.51
1,219,852.80
2,212,638.12
220,688.16
513,573.31
2,719,389.60
4,936,942.33
1,016,544.00
679,219.70
67,745.26
157,653.03
2,294,484.98
1,888,661.97
333,553.50
1,444,988.16
144,122.88
335,394.82
3,426,430.90
3,301,512.39
724,287.60
TOTAL
(Rp.)
10,370,621.25
215,926,321.88
98,764,831.04
268,702,118.45
62,449,073.70
2,640,074.07
9,447,379.05
2,003,184.88
2,677,253.22
5,304,448.06
3,385,658.28
10,208,588.56
20,547,013.32
16,137,244.72
502,266,867.36
TOTAL
(Rp.)
35,645,995.00
8,313,338.00
42,883,374.60
167,981,471.24
25,869,497.50
6,033,269.00
31,121,907.30
121,909,803.62
3,385,967.20
789,673.28
4,073,436.58
16,318,987.99
2,253,020.00
525,448.00
2,710,461.60
10,858,642.20
122,892.00
135,115.20
3,722,963.04
703,422.72
7,308,855.40
492,667,541.47
2,150,280.00
300,256.00
698,739.20
2,936,940.77
5,959,938.77
304,963.20
3,489,883.32
5,260,566.18
7,287,218.40
28,388,785.84
215,926,321.88
502,266,867.36
492,667,541.47
28,388,785.84
---------------------------
1,239,249,516.55
1,239,249,516.55
===============
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
A LANTAI SATU
14 TANGGA BELAKANG #2
a. beton mutu K-250 m3 4.97 1,133,079.00 5,628,320.66
b. berat tulangan kg 808.36 14,152.00 11,439,928.92
c. bekesting m2 36.36 196,627.00 7,148,413.91
B LANTAI DUA
21 TANGGA BELAKANG #2
a. beton mutu K-250 m3 5.08 1,133,079.00 5,755,231.17
b. berat tulangan kg 836.18 14,152.00 11,833,659.30
c. bekesting m2 37.64 196,627.00 7,401,669.49
C LANTAI TIGA
7 TALANG BETON
a. beton mutu K-250 m3 3.40 1,133,079.00 3,852,468.60
b. berat tulangan Kg 601.80 14,152.00 8,516,673.60
c. bekesting m2 38.25 203,811.00 7,795,770.75
PENJUMLAHAN
5. PEKERJAAN ATAP
7 Penutup atap
a. Rangka atap baja ringan (Usuk reng) m2 -
b. Atap genteng keramik glasur m2 3,384.72 143,192.00 484,664,113.99
c. Nok genteng keramik glasur m1 217.75 103,372.00 22,509,253.00
d. Flushing atap dinding lift m1 269.75 44,071.93 11,888,404.02
e. Talang Galvalum pertemuan dengan dinding lift m1 18.20 120,000.00 2,184,000.00
1 Canopy depan
Rangka baja termasuk zinchromate
a. KS1 IWF 250.125.6.9 kg 1139.6 31,772.00 32,108,230.00
b. KS2 2L50.50.5 kg 613.18 31,772.00 17,276,445.11
c. Gording 2C150.65.20.2,3 kg 2,002.00 31,772.00 56,406,350.00
Trekstang ø10 kg 71.21 13,732.00 977,797.36
Ikatan angin ø16 kg 122.00 13,732.00 1,675,275.88
Water moor ø19 bh 10.00 23,000.00 230,000.00
d. Plat Tumpu 491x200x12 mm kg 184.63 28,175.00 5,202,006.60
Stifner plat tumpu t 10mm kg 58.88 28,175.00 1,658,803.13
e. Plat Tumpu 100x110x12 mm kg 25.91 28,175.00 729,873.38
Angkur 12mm bh 60 23,000.00 1,380,000.00
g. Pelapisan dengan Aluminium Composit Panel (ACP) m2 453.50 800,000.00 362,800,000.00
PVDF warna , t 0.4mm termasuk rangka siku / hollow
2 Canopy samping
Rangka baja termasuk zinchromate
a. KS3 IWF 150.75.5.7 kg 777.00 31,772.00 21,891,975.00
b. Gording C150.65.20.2,3 kg 742.50 31,772.00 20,919,937.50
Trekstang ø10 kg 24.66 13,732.00 338,631.12
Ikatan angin ø16 kg 70.55 13,732.00 968,755.91
Water moor ø19 bh 10 23,000.00 230,000.00
c. Plat Tumpu 491x200x12 mm kg 8.64 31,772.00 243,291.13
Stifner plat tumpu t 10mm kg 2.51 13,732.00 34,494.78
e. Angkur 19mm - 60 bh 60.00 23,000.00 1,380,000.00
g. Pelapisan dengan Aluminium Composit Panel (ACP) m2 243.00 800,000.00 194,400,000.00
PVDF warna , t 0.4mm termasuk rangka siku / hollow
PENJUMLAHAN
5. PEKERJAAN ATAP
A RANGKA DAN PENUTUP ATAP BANGUNAN UTAMA Rp. 2,612,911,537.76
B RANGKA DAN PENUTUP ATAP KANOPY Rp. 722,691,866.89
----------------------------
3,335,603,404.65
A PEKERJAAN DINDING
A.1 LANTAI 01
11 Penebalan kolom dengan dinding bata ringan (cover talang) m2 105.60 150,790.00 15,923,424.00
A.2 LANTAI 02
9 Penebalan kolom dengan dinding bata ringan (cover talang) m2 105.60 150,790.00 15,923,424.00
A.3 LANTAI 03
9 Penebalan kolom dengan dinding bata ringan (cover talang) m2 105.60 150,790.00 15,923,424.00
B.1 LANTAI 01
1 Pelapis Homogeneous Tile 60x60 spesi mortar instan m2 137.20 359,998.00 49,391,725.60
(dinding luar)
2 Pelapis keramik 30 x 60 Kamar mandi m2 632.64 232,581.00 147,140,043.84
B.2 LANTAI 02
B.3 LANTAI 03
PENJUMLAHAN
---------------------------
3,471,832,963.17
PARTISI LANTAI 3
PENJUMLAHAN
A PELAPIS LANTAI 01
1 Urugan pasir bawah rabat beton lantai t 5cm m3 103.75 187,660.00 19,469,725.00
2 Pekerjaan Lantai Beton Mutu K100 / rabat beton , t = 5 cm m3 103.75 873,424.00 90,617,740.00
pada Bawah Pasangan lantai )
3 Homogeneus granite tile 60x60 (Type A) perekat mortar instan m2 1,727.91 359,998.00 622,044,144.18
Plint HT m1 2,246.28 71,999.60 161,731,477.49
4 Homogeneus granite tile 60x60 unpolished (Type B) perekat mortar instan m2 195.29 413,997.70 80,849,610.83
Plint HT un polished m1 89.50 82,799.54 7,410,558.83
6 Homogeneus granite tile 60x60 unpolished (Type D) perekat mortar instan m2 8.07 216,998.00 1,751,173.86
di beri alur bevel
7 Lantai Keramik tile 30x30 polos (Type E) perekat mortar instan m2 60.73 216,998.00 13,178,288.54
8 Lantai Keramik tile 30x30 texture (Type F) perekat mortar instan m2 83.00 216,998.00 18,010,834.00
9 Pasangan dinding tepi penahan rabat keliling + Plester aci m2 150.00 276,619.00 41,492,850.00
B PELAPIS LANTAI 02
1 Pekerjaan screeding bawah lantai pada pasangan lantai, t=4 cm m3 74.04 873,424.00 64,668,312.96
2 Homogeneus granite tile 60x60 (Type A) perekat mortar instan m2 1,667.55 359,998.00 600,314,664.90
Plint HT m1 2,167.82 82,799.54 179,494,084.81
4 Lantai Keramik tile 30x30 polos (Type E) perekat mortar instan m2 77.75 216,998.00 16,871,594.50
5 Lantai Keramik tile 30x30 texture (Type F) perekat mortar instan m2 74.10 216,998.00 16,079,551.80
C PELAPIS LANTAI 03
1 Pekerjaan screeding bawah lantai pada pasangan lantai, t=4 cm m3 74.04 873,424.00 64,668,312.96
2 Homogeneus granite tile 60x60 (Type A) perekat mortar instan m2 1,699.15 359,998.00 611,690,601.70
Plint HT m1 2,208.90 82,799.54 182,895,489.91
3 Lantai Keramik tile 30x30 polos (Type E) perekat mortar instan m2 77.75 216,998.00 16,871,594.50
4 Lantai Keramik tile 30x30 texture (Type F) perekat mortar instan m2 74.10 216,998.00 16,079,551.80
1 Pekerjaan screeding bawah lantai pada pasangan lantai, t=4 cm m3 0.52 873,424.00 454,180.48
2 Lantai Keramik tile 30x30 (Type E) perekat mortar instan m2 13.00 216,998.00 2,820,974.00
D PEKERJAAN WATERPROOFING
PENJUMLAHAN
9. PEKERJAAN PLAFOND
A PLAFOND LANTAI 01
1 Plafond Gybsum board 9mm rangka holow rangka utama 4/4 m2 1,977.00 197,372.00 390,204,444.00
& pembagi 2/4, t=0,7 mm pada ruangan (GP)
List Shadow line m1 998.64 18,000.00 17,975,520.00
2 Plafond Kalsiboard 4,5mm rangka holow rangka utama 4/4 m2 143.73 193,114.00 27,756,275.22
& pembagi 2/4, t=0,7 mm pada ruangan (KSB)
List Shadow line m1 337.24 18,000.00 6,070,320.00
B PLAFOND LANTAI 02
1 Plafond Gybsum board 9mm rangka holow rangka utama 4/4 m2 1,817.84 197,372.00 358,790,716.48
& pembagi 2/4, t=0,7 mm pada ruangan (GB)
List Shadow line m1 934.32 18,000.00 16,817,760.00
2 Plafond Kalsiboard 4,5mm rangka holow rangka utama 4/4 m2 147.00 193,114.00 28,387,758.00
& pembagi 2/4, t=0,7 mm pada ruangan (Kls)
List Shadow line m1 246.32 18,000.00 4,433,760.00
C PLAFOND LANTAI 03
1 Plafond Gybsum board 9mm rangka holow rangka utama 4/4 m2 1,817.84 197,372.00 358,790,716.48
& pembagi 2/4, t=0,7 mm pada ruangan (GB)
List Shadow line m1 934.32 18,000.00 16,817,760.00
2 Plafond Kalsiboard 4,5mm rangka holow rangka utama 4/4 m2 147.00 193,114.00 28,387,758.00
& pembagi 2/4, t=0,7 mm pada ruangan (Kls)
List Shadow line m1 246.32 18,000.00 4,433,760.00
3 Plafond Kalsiboard 4,5mm rangka holow rangka utama 4/4 m2 440.68 193,114.00 85,101,477.52
& pembagi 2/4, t=0,7 mm pada tritisan
List Shadow line m1 893.08 18,000.00 16,075,440.00
9. PEKERJAAN PLAFOND
A PLAFOND LANTAI 01 Rp. 442,006,559.22
B PLAFOND LANTAI 02 Rp. 408,429,994.48
C PLAFOND LANTAI 03 Rp. 509,606,912.00
D PLAFOND LANTAI R MESIN LIFT Rp. 552,612.50
---------------------------
Rp. 1,360,596,078.20
A LANTAI 01
B LANTAI 02
C LANTAI 03
2 Toilet difable
- Closet duduk Toto CW660NPJ / SW660J ( Lengkap dengan Acesories set 1.00 3,350,000.00 3,350,000.00
- dan stop kran)
Jet washer dg stop kran stainless steel LW 830J set 1.00 520,000.00 520,000.00
- Floor drain stainless steel TX1BN set 1.00 457,000.00 457,000.00
- Wastafel TOTO ( Lgkp dgn Acesories ) L521V1A setara set 1.00 1,250,000.00 1,250,000.00
- Cermin 5mm dibevel 90x110cm bh 1.00 300,000.00 300,000.00
- Handgrip stainless steel bh 1.00 550,000.00 550,000.00
3 Janitor
- Floor drain stainless steel TX1BN set 2.00 457,000.00 914,000.00
- Kran air stainless steel T23BQ13N set 2.00 420,000.00 840,000.00
6 Kantin
- Kitchen zink stainlesssteel set 2.00 650,000.00 1,300,000.00
- Meja beton kitchen zink top table keramik set 2.00 3,500,000.00 7,000,000.00
- Kran Dapur TX609K set 2.00 470,000.00 940,000.00
- Wastafel TOTO ( Lengkap dengan Acesories ) LW230J set 2.00 1,250,000.00 2,500,000.00
- Meja beton finishing Homogeneous tile uk 245x40 cm unit 1.00 4,000,000.00 4,000,000.00
B SANITARY LANTAI 02
2 Toilet difable
- Closet duduk Toto CW660NPJ / SW660J ( Lengkap dengan Acesories set 1.00 3,350,000.00 3,350,000.00
dan stop kran)
- Jet washer dg stop kran stainless steel LW 830J set 1.00 520,000.00 520,000.00
- Floor drain stainless steel TX1BN set 1.00 457,000.00 457,000.00
- Wastafel TOTO ( Lgkp dgn Acesories ) L521V1A setara set 1.00 1,250,000.00 1,250,000.00
- Cermin 5mm dibevel 90x110cm bh 1.00 300,000.00 300,000.00
- Handgrip stainless steel bh 1.00 550,000.00 550,000.00
3 Janitor
- Floor drain stainless steel TX1BN set 2.00 457,000.00 914,000.00
- Kran air stainless steel T23BQ13N set 2.00 420,000.00 840,000.00
C SANITARY LANTAI 03
2 Toilet difable
- Closet duduk Toto CW660NPJ / SW660J ( Lengkap dengan Acesories set 1.00 3,350,000.00 3,350,000.00
- dan stop kran)
Jet washer dg stop kran stainless steel LW 830J set 1.00 520,000.00 520,000.00
- Floor drain stainless steel TX1BN set 1.00 457,000.00 457,000.00
- Wastafel TOTO ( Lgkp dgn Acesories ) L521V1A setara set 1.00 1,250,000.00 1,250,000.00
- Cermin 5mm dibevel 90x110cm bh 1.00 300,000.00 300,000.00
- Handgrip stainless steel bh 1.00 550,000.00 550,000.00
3 Janitor
- Floor drain stainless steel TX1BN set 2.00 457,000.00 914,000.00
- Kran air stainless steel T23BQ13N set 2.00 420,000.00 840,000.00
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
4 R Persiapan dan Pantry
- Kitchen zink stainlesssteel set 2.00 650,000.00 1,300,000.00
- Meja beton wastafel top table keramik set 2.00 3,500,000.00 7,000,000.00
- Kran Dapur TX609K set 2.00 470,000.00 940,000.00
PENJUMLAHAN
11. PEKERJAAN SANITARY
A SANITARY LANTAI 01 Rp. 115,801,000.00
B SANITARY LANTAI 02 Rp. 93,764,000.00
C SANITARY LANTAI 03 Rp. 93,764,000.00
------------------------
Rp. 303,329,000.00
A RAILLING
Material :
- Pipa Stainles steel □5x5 t 2mm
- Pipa Stainles steel □4x4 t 2mm
- Pipa Stainles steel □2x3 t 2mm
- Kaca bening 6mm
- Sticker sandblast
1 Railing tangga kiri #1 (2 sisi) termasuk void lt1 s/d lt 3 m1 46.50 699,121.13 32,509,132.39
2 Railing tangga belakang #2 (2 sisi) termasuk void lt 1 s/d lt 3 m1 48.50 699,121.13 33,907,374.64
3 Railing tangga kanan #3 (2 sisi) termasuk void lt 1 s/d lt 3 m1 48.40 699,121.13 33,837,462.53
4 Railing Void R1 lt 2 Unit 2.00 3,518,849.68 7,037,699.36
5 Railing Void R2 lt 2 Unit 1.00 4,271,253.46 4,271,253.46
6 Railing Void R3 lt 2, lt 3 Unit 2.00 3,175,923.39 6,351,846.78
7 Railing Void R4 lt 2, lt 3 Unit 2.00 1,575,187.52 3,150,375.04
9 Tangga servis dari R panel lantai 3 ke R Mesin Lift unit 1.00 2,084,375.00 2,084,375.00
Material Pipa stainless steel 2' dan pipa SS 1.5'
D PEKERJAAN EXTERNAL
PENJUMLAHAN
12. PEKERJAAN LAIN - LAIN
A RAILLING Rp. 130,259,964.47
B MEJA COUNTER DAN BACKDROP Rp. 20,867,500.00
C PEKERJAAN LETTER / SIGNAGE Rp. 32,780,000.00
D PEKERJAAN EXTERNAL Rp. 132,345,137.00
-----------------------------
316,252,601.47
1 Lantai 1
a dia 1'' m 247.00 57,450.00 14,190,150.00
b dia 1/2'' m 551.00 22,450.00 12,369,950.00
c fitting ls 4.00 1,500,000.00 6,000,000.00
d ball valve 1.5'' bh 4.00 720,000.00 2,880,000.00
2 Lantai 2
a dia 1'' m 126.00 57,450.00 7,238,700.00
b dia 1/2'' m 262.50 22,450.00 5,893,125.00
c fitting ls 1.00 1,500,000.00 1,500,000.00
d ball valve 1.5'' bh 4.00 720,000.00 2,880,000.00
3 Lantai 3
a dia 1'' m 126.00 57,450.00 7,238,700.00
b dia 1/2'' m 262.50 22,450.00 5,893,125.00
c fitting ls 1.00 1,500,000.00 1,500,000.00
d ball valve 1.5'' bh 4.00 720,000.00 2,880,000.00
f Pompa transfer kap 120 lpm,head 30m, daya 0.75 kW, CR 5.5 bh 2 17,500,000.00 35,000,000.00
JUMLAH A 130,792,250.00
2 Lantai 2
a dia 6'' m 133.00 205,000.00 27,265,000.00
b dia 4'' m 87.50 98,495.00 8,618,312.50
c dia 3'' m 133.00 67,600.00 8,990,800.00
d dia 2'' m 87.50 36,725.00 3,213,437.50
e fitting ls 1.00 2,750,000.00 2,750,000.00
f CO 4'' bh 3.00 142,500.00 427,500.00
g FD 2'' bh 4.00 135,000.00 540,000.00
2 Lantai 2
a dia 6'' m 133.00 205,000.00 27,265,000.00
b dia 4'' m 87.50 98,495.00 8,618,312.50
c dia 3'' m 133.00 67,600.00 8,990,800.00
d dia 2'' m 87.50 36,725.00 3,213,437.50
e fitting ls 1.00 2,750,000.00 2,750,000.00
f CO 4'' bh 3.00 142,500.00 427,500.00
g FD 2'' bh 4.00 135,000.00 540,000.00
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
3 Penyambungan Instalasi Air Kotor/Bekas Ke IPAL Existing
a Pipa PVC AW dia 6" ke IPAL m 135.00 205,000.00 27,675,000.00
b IPAL Biofil kapasitas 4m3 unit 2.00 35,000,000.00 70,000,000.00
JUMLAH B 327,311,110.00
PENJUMLAHAN
2 Lantai 2
a Titik lampu dan stop kontak+ konduit titik 1,645.00 275,000.00 452,375,000.00
b RM LED TL 2 x 10 W Alml Savy bh 240.00 1,545,900.00 371,016,000.00
c Down Light RD 150 LED 12 W bh 65.00 389,500.00 25,317,500.00
d Rosset LED 8 W bh 40.00 226,900.00 9,076,000.00
e Baret BCS 22W bh 10.00 375,000.00 3,750,000.00
f Exhaust Fan Ceilling 240 cfm bh 20.00 435,000.00 8,700,000.00
g Stop kontak, 1p bh 1,270.00 62,000.00 78,740,000.00
h Saklar ganda bh 45.00 37,000.00 1,665,000.00
i Saklar tunggal bh 60.00 25,000.00 1,500,000.00
j Saklar Tukar / Silang bh 10.00 27,500.00 275,000.00
k Kabel Tray 300x100,termasuk penggantung m 200.00 350,000.00 70,000,000.00
l Kabel Tray 200x100,termasuk penggantung m 200.00 278,000.00 55,600,000.00
3 Lantai 3
a Titik lampu dan stop kontak+ konduit titik 1,645.00 275,000.00 452,375,000.00
b RM LED TL 2 x 10 W Alml Savy bh 240.00 1,545,900.00 371,016,000.00
c Down Light RD 150 LED 12 W bh 65.00 389,500.00 25,317,500.00
d Rosset LED 8 W bh 40.00 226,900.00 9,076,000.00
e Baret BCS 22W bh 10.00 375,000.00 3,750,000.00
f Exhaust Fan Ceilling 240 cfm bh 20.00 435,000.00 8,700,000.00
g Stop kontak, 1p bh 1,270.00 62,000.00 78,740,000.00
h Saklar ganda bh 45.00 37,000.00 1,665,000.00
i Saklar tunggal bh 60.00 25,000.00 1,500,000.00
j Saklar Tukar / Silang bh 10.00 27,500.00 275,000.00
k Kabel Tray 300x100,termasuk penggantung m 200.00 350,000.00 70,000,000.00
l Kabel Tray 200x100,termasuk penggantung m 200.00 278,000.00 55,600,000.00
JUMLAH A 3,172,248,000.00
B Pekerjaan Panel-Panel
1 PP1. Lantai 1, 80x60x25 unit 3.00 1,920,000.00 5,760,000.00
a MCB 25A/10kA/3p bh 5.00 617,000.00 3,085,000.00
b MCB 6A/5kA/1p bh 40.00 67,000.00 2,680,000.00
c MCB 20A/5kA/1p bh 15.00 98,600.00 1,479,000.00
d Voltmeter 0-500V bh 5.00 365,000.00 1,825,000.00
e Amperemeter +CT 100A/5 bh 15.00 345,000.00 5,175,000.00
f Pilot lamp bh 15.00 37,500.00 562,500.00
g arde BCC 10 mm2, 2 Ohm set 5.00 250,000.00 1,250,000.00
h kabel NYY4x4mm2 ke LVMDP m 60.00 55,000.00 3,300,000.00
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
2 PP2. Lantai 2, 80x60x25 unit 3.00 1,920,000.00 5,760,000.00
a MCB 25A/10kA/3p bh 5.00 617,000.00 3,085,000.00
b MCB 6A/5kA/1p bh 30.00 67,000.00 2,010,000.00
c MCB 20A/5kA/1p bh 10.00 98,600.00 986,000.00
d Voltmeter 0-500V bh 5.00 365,000.00 1,825,000.00
e Amperemeter +CT 100A/5 bh 15.00 345,000.00 5,175,000.00
f Pilot lamp bh 15.00 37,500.00 562,500.00
g arde BCC 10 mm2, 2 Ohm set 5.00 250,000.00 1,250,000.00
h kabel NYY4x4mm2 ke LVMDP m 80.00 55,000.00 4,400,000.00
JUMLAH B 471,138,750.00
JUMLAH C 115,695,528.00
PENJUMLAHAN
13.2 PEKERJAAN ELEKTRIKAL
A Pekerjaan Penerangan Rp. 3,172,248,000.00
B Pekerjaan Panel-Panel Rp. 471,138,750.00
C Pekerjaan Penangkal Petir Rp. 115,695,528.00
----------------------------
3,759,082,278.00
JUMLAH A 1,083,754,800.00
B Lantai Lt.2
1 Wall type 1/2 pk unit 12.00 4,250,000.00 51,000,000.00
2 Wall type 1 pk unit 6.00 5,950,000.00 35,700,000.00
3 Wall type 1,5 pk unit 18.00 7,250,000.00 130,500,000.00
4 Ceilling Cassette 3 pk unit 36.00 25,385,000.00 913,860,000.00
5 Stop Kontak AC bh 72.00 68,900.00 4,960,800.00
6 Instalasi kabel Nym 3x2.5 mm2+conduilt dan pipadrain pvc aw ttk 72.00 327,000.00 23,544,000.00
JUMLAH B 1,159,564,800.00
C Lantai Lt.3
1 Wall type 1/2 pk unit 12.00 4,250,000.00 51,000,000.00
2 Wall type 1 pk unit 6.00 5,950,000.00 35,700,000.00
3 Wall type 1,5 pk unit 18.00 7,250,000.00 130,500,000.00
4 Ceilling Cassette 3 pk unit 36.00 25,385,000.00 913,860,000.00
5 Stop Kontak AC bh 72.00 68,900.00 4,960,800.00
6 Instalasi kabel Nym 3x2.5 mm2+conduilt dan pipadrain pvc aw ttk 72.00 327,000.00 23,544,000.00
JUMLAH C 1,159,564,800.00
PENJUMLAHAN
13.3 PEKERJAAN TATA UDARA
A Lantai Lt.1 Rp. 1,083,754,800.00
B Lantai Lt.2 Rp. 1,159,564,800.00
C Lantai Lt.3 Rp. 1,159,564,800.00
----------------------------
2,243,319,600.00
A Lantai 1
1 instalasi kabel telphone itc + konduit ttk 24.00 185,000.00 4,440,000.00
2 socket,telpon RJ11 bh 24.00 95,000.00 2,280,000.00
3 pesawat telp. Analog bh 24.00 265,000.00 6,360,000.00
4 instalasi kabel data utp cat6 +konduit ttk 13.00 210,000.00 2,730,000.00
5 Hub 16 port bh 3.00 750,000.00 2,250,000.00
6 socket LAN, RJ 45 bh 13.00 75,000.00 975,000.00
7 Terminal Box bh 5.00 776,000.00 3,880,000.00
8 PABX-8 PTT 16 Extension, unit - 7,750,000.00 by owner
JUMLAH A 22,915,000.00
B Lantai 2
1 Terminal Box bh 3.00 776,000.00 2,328,000.00
2 instalasi kabel telphone itc +konduit ttk 22.00 185,000.00 4,070,000.00
3 socket,telpon RJ11 bh 22.00 95,000.00 2,090,000.00
4 pesawat telp. Analog bh 22.00 265,000.00 5,830,000.00
5 instalasi kabel data utp cat6 +konduit ttk 32.00 210,000.00 6,720,000.00
6 socket LAN, RJ 45 bh 32.00 75,000.00 2,400,000.00
7 Hub 16 port bh 6.00 750,000.00 4,500,000.00
JUMLAH B 27,938,000.00
C Lantai 3
1 Terminal Box bh 3.00 776,000.00 2,328,000.00
2 instalasi kabel telphone itc +konduit ttk 16.00 185,000.00 2,960,000.00
3 socket,telpon RJ11 bh 16.00 95,000.00 1,520,000.00
4 pesawat telp. Analog bh 16.00 265,000.00 4,240,000.00
5 instalasi kabel data utp cat6 +konduit ttk 8.00 210,000.00 1,680,000.00
6 socket LAN, RJ 45 bh 8.00 75,000.00 600,000.00
7 Hub 16 port bh 3.00 750,000.00 2,250,000.00
JUMLAH C 15,578,000.00
D Testing commisioning
Testing Comisioning ls 1.00 2,500,000.00 2,500,000.00
JUMLAH D 2,500,000.00
PENJUMLAHAN
13.4 PEKERJAAN TELEPON
A Lantai 1 Rp. 22,915,000.00
B Lantai 2 Rp. 2,500,000.00
C Lantai 3 Rp. 15,578,000.00
D Testing commisioning Rp. 2,500,000.00
----------------------------
25,415,000.00
JUMLAH A 68,124,000.00
JUMLAH A 205,681,000.00
B Lantai 2
1 Instalasi kabel + konduit ttk 45.00 165,000.00 7,425,000.00
2 Terminal box bh 3.00 85,000.00 255,000.00
3 Alarm bell bh 6.00 345,000.00 2,070,000.00
4 Heat detector bh 30.00 525,000.00 15,750,000.00
5 Smoke detector bh 30.00 725,000.00 21,750,000.00
6 Indicator lamp bh 6.00 150,000.00 900,000.00
7 ROR, 3W bh 33.00 475,000.00 15,675,000.00
JUMLAH B 63,825,000.00
C Lantai 3
1 Instalasi kabel + konduit ttk 45.00 165,000.00 7,425,000.00
2 Terminal box bh 3.00 85,000.00 255,000.00
3 Alarm bell bh 6.00 345,000.00 2,070,000.00
4 Heat detector bh 30.00 525,000.00 15,750,000.00
5 Smoke detector bh 30.00 725,000.00 21,750,000.00
6 Indicator lamp bh 6.00 150,000.00 900,000.00
7 ROR, 3W bh 33.00 475,000.00 15,675,000.00
JUMLAH C 63,825,000.00
D Fire Extinguisher
Fire Extinguisher dry powder klas ABC portable kapasitas 6 kg bh 30.00 2,100,000.00 63,000,000.00
JUMLAH D 63,000,000.00
2 Hydrant Box Indoor (HBI) , lengkap dengan unit 9.00 6,508,100.00 58,572,900.00
valve 1.5'', valve 2.5''MC,fire hose1.5x30m class 10K
nozel1.5'', indikator lamp, breake glass, hose rack
JUMLAH E 237,267,560.00
F Testing commisioning
Testing Komisioning ls 1.00 3,000,000.00 3,000,000.00
JUMLAH F 3,000,000.00
PENJUMLAHAN
13.6 PEKERJAAN FIRE ALARM DAN APAR
A Fire Alarm Lantai 1 Rp. 205,681,000.00
B Fire Alarm Lantai 2 Rp. 63,825,000.00
C Fire Alarm Lantai 3 Rp. 63,825,000.00
D Fire Extinguisher Rp. 63,000,000.00
E HIDRAN LANTAI 1, 2 DAN 3 Rp. 237,267,560.00
F Testing commisioning Rp. 3,000,000.00
----------------------------
636,598,560.00
JUMLAH A 35,507,000.00
B Lantai 2
1 Terminal box bh 4.00 185,000.00 740,000.00
2 instalasi kabel + konduit ttk 44.00 235,000.00 10,340,000.00
3 ceilling speaker, 6 W bh 24.00 225,000.00 5,400,000.00
4 microphone conector bh 8.00 95,000.00 760,000.00
5 voleme kontrol bh 12.00 185,000.00 2,220,000.00
JUMLAH B 19,460,000.00
C Lantai 3
1 Terminal box bh 4.00 185,000.00 740,000.00
2 instalasi kabel + konduit ttk 44.00 235,000.00 10,340,000.00
3 ceilling speaker, 6 W bh 24.00 225,000.00 5,400,000.00
4 microphone conector bh 8.00 95,000.00 760,000.00
5 voleme kontrol bh 12.00 185,000.00 2,220,000.00
JUMLAH C 19,460,000.00
D Testing commisioning
1 Testing Comisioning ls 1.00 2,500,000.00 2,500,000.00
JUMLAH D 2,500,000.00
PENJUMLAHAN
13.7 PEKERJAAN TATA SUARA
A Lantai 1 Rp. 35,507,000.00
B Lantai 2 Rp. 19,460,000.00
C Lantai 3 Rp. 19,460,000.00
D Testing commisioning Rp. 2,500,000.00
----------------------------
76,927,000.00
A PERALATAN UTAMA
1 Antena UHF unit 1.00 850,000.00 850,000.00
2 Antena VHF unit 1.00 650,000.00 650,000.00
3 Booster Amplifier unit 1.00 2,700,000.00 2,700,000.00
JUMLAH A 4,200,000.00
B PEKERJAAN INSTALASI
1 Instalasi Lantai 1
2 Outlet TV bh 10.00 150,000.00 1,500,000.00
3 Coupler bh 10.00 750,000.00 7,500,000.00
4 Splitter bh 9.00 850,000.00 7,650,000.00
5 Instalasi MATV dgn kabel RJ6 ttk 10.00 250,000.00 2,500,000.00
6 Penggantung dan Bracket TV bh 10.00 450,000.00 4,500,000.00
Instalasi Lantai 2
7 Outlet TV bh 10.00 150,000.00 1,500,000.00
8 Coupler bh 10.00 750,000.00 7,500,000.00
9 Splitter bh 9.00 850,000.00 7,650,000.00
10 Instalasi MATV dgn kabel RJ6 ttk 10.00 250,000.00 2,500,000.00
11 Penggantung dan Bracket TV bh 10.00 650,000.00 6,500,000.00
Instalasi Lantai 3
12 Outlet TV bh 10.00 150,000.00 1,500,000.00
13 Coupler bh 10.00 750,000.00 7,500,000.00
14 Splitter bh 9.00 850,000.00 7,650,000.00
15 Instalasi MATV dgn kabel RJ6 ttk 10.00 250,000.00 2,500,000.00
16 Penggantung dan Bracket TV bh 10.00 650,000.00 6,500,000.00
JUMLAH B 74,950,000.00
C Testing commisioning
Testing commisioning ls 1.00 2,500,000.00 2,500,000.00
JUMLAH C 2,500,000.00
PENJUMLAHAN
13.8 PEKERJAAN MATV
A PERALATAN UTAMA Rp. 4,200,000.00
B PEKERJAAN INSTALASI Rp. 74,950,000.00
C Testing commisioning Rp. 2,500,000.00
----------------------------
81,650,000.00
Jumlah 681,500,000.00
17 A B C D E F G
16 -4 -4 -3.5 -3 -0.92 -0.92
15 -3.75 -3.5 -3 -2.75 -0.92 -0.92
14 -3.5 -3.5 -3 -2.75 -2.5 -2.25
13 -3 -3 -2.75 -2.5 -2.25 -2
12 -3 -2.75 -2.5 -2.5 -2.25 -2
11 -2.75 -2.75 -2.5 -2.25 -2 -1.75
10 -2.5 -2.5 -2.25 -2.25 -2 -1.75
9 -2.5 -2.5 -2.25 -2.25 -2 -1.75
8 -2.5 -2.25 -2.25 -2.25 -1.75 -1.5
7 -2.5 -2.25 -2.25 -2 -1.5 -1
6 -1 -1 -1 -2 -1.5 -1
5 -1 -1 -1 -2 -1.5 -1
4 -2.5 -2.5 -2.25 -2 -1.75 -1.5
3 -2.75 -2.5 -2.25 -2.25 -2 -2
2 -3.25 -3.25 -3.25 -3 -3 -3.25
1 -3.75 -3.75 -3.5 -3.5 -3.5 -3.5
A B C D E F G
17 A B C D E F G
16 85 72.5 60 8 8
15 72.5 60 53.75 8 8
14 72.5 60 53.75 47.5 41.25
13 60 53.75 47.5 41.25 35
12 53.75 47.5 47.5 41.25 35
11 53.75 47.5 41.25 35
10 47.5 41.25 41.25 35
9 47.5 47.5 41.25 41.25 35
8 47.5 41.25 41.25 41.25 28.75 22.5
7 47.5 41.25 41.25 35 22.5
6 10 10 10 35 22.5
5 10 10 35 22.5
4 47.5 41.25 35 28.75 -37.5
3 47.5 41.25 41.25 35 -50
2 66.25 60 60 -81.25
1 72.5 72.5 72.5 -87.5
Urug 2639.25
H I J K L M N O P/17
-0.92 -2.5 -2.25 -2 -1.75 -1 -1 -0.75 16
-0.92 -2.25 -2 -1.5 -1 -0.75 -0.75 -0.75 15
-2.25 -2 -1.75 -1.25 -0.75 0 0 -0.5 14
-2 -1.75 -1.5 -1 -1 0 0 -0.5 13
-1.75 -1.5 -1.5 -1 -1 0 0 -0.5 12
-1.75 -1.5 1.25 -1 -0.5 0 0 -0.5 11
-1.5 -1.25 1.25 -1 -0.5 0 0 -0.25 10
-1.5 -1.25 1.25 -1 -0.5 0 0 0 9
-1.25 -1 -1 -0.75 -0.5 0 0 0 8
-1 -1 -0.75 -0.5 -0.5 0 0 0 7
0 0 0 0 0 0 -0.25 0 6
0 0 0 0 0 0 -0.5 0 5
-1 -1 -1 -1 -1 -1 -0.75 -0.5 4
-1.75 -1.75 -1.5 -1.5 -1.5 -1.5 -1.5 -1.25 3
-3.25 -3 -3 -2.5 -2.5 -2.5 -2 -1.75 2
-3.5 -3.5 -3.5 -3.25 -3 -2.75 -2.75 -2.5 1
H I J K L M N O P
H I J K L M N O P/17
8 47.5 41.25 35 28.75 16
8 41.25 35 22.5 10 15
41.25 35 28.75 16.25 3.75 14
35 28.75 22.5 10 10 13
28.75 22.5 22.5 10 10 12
11
10
9
8
7
6
5
-25 -25 -25 4
-43.75 -43.75 -37.5 -37.5 3
-81.25 -75 -75 2
-87.5 -87.5 -87.5 1