Professional Documents
Culture Documents
Level 3 - Standard: SD-NOC-COR-350
Level 3 - Standard: SD-NOC-COR-350
Corrosion
SD-NOC-COR-350
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Contents
1. Scope ................................................................................................................... 4
3. Surfaces to be Painted........................................................................................ 5
3.1 Items not to be Painted ............................................................................................... 5
3.2 Case of Stainless Steels ............................................................................................. 6
3.3 Painting of Fastenings................................................................................................. 6
3.4 Painting under Personal Protection (Perforated Guards/Sheets) ................................. 6
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Bibliography............................................................................................................. 15
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
1. Scope
This NOC Standard defines the technical requirements for the execution of painting works of new
built offshore or coastal structures and equipment. This standard is based on the use of high
durability painting systems (as defined in ISO 12944-1) for facilities whose design life is
anticipated to be more than 15 years.
This standard does not cover painting systems for temporary equipment or equipment with design
life less than 15 years, and for which alternative painting systems shall be submitted to Company
for approval.
2. Reference Documents
The reference documents listed below form an integral part of this document.
External Documents
Unless otherwise indicated, the applicable version of these documents, including relevant
appendices and supplements, is the latest revision published.
Reference Title
ASTM A380 Standard Practice for Cleaning, Descaling, and Passivation of
Stainless Steel-Parts, Equipment, and Systems
ASTM D4285 Standard Test Method for Indicating Oil or Water in Compressed
Air
ASTM D4752 Standard Practice for Measuring MEK Resistance of Ethyl
Silicate (Inorganic) Zinc-Rich Primers by Solvent Rub
ASTM D4940 Standard Test Method for Conductimetric Analysis of Water
Soluble Ionic Contamination of Blast Cleaning Abrasives
ASTM D5162 Standard Practice for Discontinuity (Holiday) Testing of
Nonconductive Protective Coating on Metallic Substrates
ISO 12944 (Parts 1; 3; 4; Paints and Varnishes - Corrosion Protection of Steel Structures
7; 8) by Protective Paint Systems - Parts 1; 3; 4; 7; 8
ISO 16276 (Parts 1; 2) Corrosion Protection of Steel Structures by Protective Paints
Systems - Assessment of, and Acceptance Criteria for, the
Adhesion/Cohesion (Fracture Strength) of a coating - Parts 1; 2
ISO 19840 Paints and Varnishes - Corrosion Protection of Steel Structures
by Protective Paint Systems - Measurement of, and Acceptance
Criteria for, the Dry-Film Thickness of Coating on Rough
Surfaces
ISO 4628 (Parts 1; 2; 3; 4; Paints and Varnishes - Evaluation of Degradation of Coatings -
5) Designation of Quantity and Size of Defects, and of Intensity of
Uniform Changes in Appearance - Parts 1; 2; 3; 4; 5
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Reference Title
ISO 8501 (Parts 1; 3) Preparation of Steel Substrates before Application of Paints and
Related Products. Visual Assessment of Surface Cleanliness -
Parts 1; 3
ISO 8502 (Parts 3; 6; 9) Preparation of Steel Substrates before Application of Paints and
Related Products. Tests for the Assessment of Surface
Cleanliness - Parts 3; 6; 9
ISO 8503 (Parts 1; 2) Preparation of Steel Substrates before Application of Paints and
Related Products - Surface Roughness Characteristics of Blast-
Cleaned Steel Substrates - Parts 1; 2
RAL 840 HR Colors Standard
SSPC SP1 Solvent Cleaning
UKCAA CAP 437 Standards for Offshore Helicopter Landing Areas
Reference Title
SD-NOC-COR-001 Corrosion Control on Production Facilities: Design and
Construction
SD-NOC-COR-355 External Protection of Piping and Equipment by Thermal Spray
Coating
SD-NOC-COR-356 Corrosion Protection of Fasteners for Subsea and Topside
Applications
3. Surfaces to be Painted
All surfaces shall be painted using the relevant specified system, except when otherwise
stipulated hereafter.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Nonferrous materials such as 90-10 and 70-30 copper nickel alloys, monel, aluminum
bronze, and nickel alloys when not thermally insulated
Machined surfaces
Stainless steel tubing.
4. Painting Systems
The list and application areas of all painting systems are given in Appendix 2.
Corrosivity categories are given in accordance with SD-NOC-COR-001. Painting system selected
for corrosivity category IM-2/IM-3 shall be also compatible with a cathodic protection.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
5. Certification of Personnel
5.1 Operators
Operators shall be individually certified by an approved organization (ACQPA, FROSIO, etc.).
5.2 Inspectors
Inspectors shall be individually certified in accordance with NS 476 (Inspector certified level III) or
NACE certified coating inspector level III. Certification shall be delivered by the following approved
organizations:
ACQPA
FROSIO
NACE.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
9. Surface Preparation
9.1 Design and Preparation before Blasting of Surfaces to be painted
All structures and equipment shall be designed according to ISO 12944-3 international standard
for high durability painting systems.
All sharp edges shall be rounded (minimum radius > 2 mm).
Preparation grades of welds and other areas with surface imperfections shall be grade P3
according ISO 8501-3.
The design of the item to be painted shall be such that it creates no interstice and inaccessible
area.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Any oil or grease shall be removed by washing the item to be treated with appropriate solvents or
any other suitable means before beginning of the cleaning operations according to the ISO 12944-
4 standard or specification SSPC SP1. This includes bolt holes in piping assemblies.
Weld spatter and remains of temporary welds, deposits or surface defects shall be eliminated by
appropriate means; removal by deep grinding is subject to Company approval.
All mating surfaces of equipment subject to outdoor exposure shall be coated with the full coating
system prior to assembly (saddles, skirts, base plates, olted components, flanges, etc.).
Contractor shall protect all equipment that is not to be painted or may be affected by the presence
of abrasives or paint.
Opening in vessels, piping and other appurtenances shall be properly protected against entry of
abrasive material.
Special attention shall be paid to avoid splashes of zinc paint on equipment made of austenitic
steels.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Stainless steels shall be segregated, carbon steel supports for storage shall be systematically
painted, and lifting equipment shall prevent iron contamination.
Stainless steel surfaces to be coated shall be etched or degreased and blasted.
The blast cleaning procedure shall be submitted to Company for approval.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
10.3 Application
10.3.1 General
Paint shall always be applied to surfaces that are dry, clean and degreased, for both coating on
substrate and previous coat.
Painting works shall not proceed if:
Temperature of the substrate is less than 3°C above the dew point
The relative humidity is more than 85% RH (90% RH for inorganic zinc silicates)
The weather is rainy or foggy, except under shelter, and subject to verification of the
atmospheric conditions
The minimum or maximum temperature of the ambient atmosphere and the substrate are
out with the limits given in the product data sheets (usually 10°C for epoxy based paint and
5°C for acryl-polyurethane topcoat).
Application shall be by airless spray.
Different colors shall be used for all successive coats of the paint system. The finishing coat of
the required color shall be sufficiently opaque to cover the shade of the undercoat.
Prior to apply a succeeding coat, all previous coatings shall be allowed to dry for at least the
minimum time specified by the paint supplier. The maximum over coating time allowed by the
paint supplier shall not be exceeded. The paint supplier's advice regarding the influence of the
applied coating thickness, steel temperature, relative humidity, % of thinner added, shall be taken
into account in determining the correct over coating intervals.
Contractor shall keep a daily record of the dew point, relative humidity, ambient atmosphere and
substrate temperatures (all measured before the work commences and twice per shift and when
ambient conditions are obviously changing) to ensure that conditions are acceptable. These
records shall be kept and made available to Company.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Before the subsequent coat is applied, this primer shall be subjected to a MEK test as per
ASTM D4752 to ensure that hydrolysis is complete. If complete hydrolysis is not obtained within
eight days of application, the coating shall be completely removed and re-applied.
10.4 Repairs
Any defect shall be repaired before the application of further coats. Subject to the agreement of
Company, and after determining the type and size of the defects, the following methods of repair
shall be applied:
10.4.1 Major Defects (Paint Products, Application, Non Conformity of Test Results)
The paint shall be removed completely by abrasive blast-cleaning and the entire system shall be
re-applied.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
11.5 Guarantee
The Work shall be covered by a specific guarantee given by Contractor to complete Guarantees
and warranties defined in the Engineering, Procurement, Supply, Construction and
Commissioning Contract (EPSCC 1113 - Article 20 “GUARANTEES AND WARRANTIES”).
Contractor guarantees that the Work shall be covered by performance warranties in accordance
with the following requirements of the Contract:
The maximum degree of rust shall be Ri2 according to ISO 4628-3
The maximum degree of cracking, blistering, or flaking shall be 3S3 according to ISO 4628-
1, ISO 4628-2, ISO 4628-4 and ISO 4628-5.
Guarantee shall be provided for the duration defined for each paint system in Appendix 3.
Beginning of Warranty Period as defined for each paint system in Appendix 3 starts from the
effective date of the Provisional Acceptance Certificate for painting works.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Bibliography
Reference Title of the Publication
ACQPA "Association pour la Certification et la Qualification en
Peinture Anticorrosion"
ISO 9223 Corrosion of metals and alloys. Atmospheres’ corrosivity.
Classification
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Paint application
Before start and
twice per shift and
Climatic conditions - when the ambient See section 10.3.1 of this standard
conditions are
obviously changing
Wet film thickness - Each coat As per paint manufacturer data sheet for the
Comb gauge
(WFT) - Spot check specified DFT
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Operating
temperature Corrosivity
(°C) categories as per System N°. Remarks
SD-NOC-COR-001
Mini Maxi
ATMOSPHERIC ZONE: PIPING AND PRESSURE VESSELS
Carbon steel, Un-insulated
- 40 +80 C5-M / CX P01
ATMOSPHERIC ZONE: STRUCTURES, VALVES, EQUIPMENT, EXTERIOR OF STORAGE TANKS
Carbon steel, Un-insulated
For floating roof tanks extend by 1.5 m down on
- 40 +80 C5-M / CX P01/P01²nd
the inside
ATMOSPHERIC ZONE: STRUCTURES, PIPING, VALVES, PRESSURE VESSELS, EQUIPMENT,
EXTERIOR OF STORAGE TANKS
Carbon steel, Un-insulated:
+81 +200 C5-M / CX P13 Including adjacent surfaces
+201 +400 C5-M / CX P11 Including adjacent surfaces
Carbon steel, Insulated:
-40 +200 C5-M / CX P13
+201 +400 C5-M / CX P11²nd
Stainless steel, Un-insulated, type AISI 304, 304L, 321 and types AISI 316 and 316L:
- 40 +80 C5-M / CX P05
+81 +200 C5-M / CX P13
+201 +400 C5-M / CX P11²nd
Stainless steel, Un-insulated, type AISI 904, duplex and super duplex:
Except under stickers, see Appendix 4, and
-40 100 C5-M / CX Not painted
except under support (P05² nd)
+101 +200 C5-M / CX P13
+201 +400 C5-M / CX P11²nd
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Operating
temperature Corrosivity
(°C) categories as per System N°. Remarks
SD-NOC-COR-001
Mini Maxi
Stainless steel, Insulated, all types:
-40 +200 C5-M / CX P13
+201 +400 C5-M / CX P11²nd
Galvanized surfaces:
-40 +80 C5-M / CX P05
Zn/bi Cr surfaces:
Above 80°C,system adapted to adjacent
-40 +80 C5-M / CX P06
surfaces systems
Cold services: Carbon steel and stainless steel surfaces
-180 +200 C5-M / CX P18
Fire-proofed surfaces
For Concrete type PFP (not allowed offshore).
-40 +80 C5-M / CX P04 The painting system, painting application and
over coating conditions shall be approved by
PFP supplier.
For Intumescent epoxy type PFP.
-40 +70 C5-M / CX P04²nd The painting system, painting application and
over coating conditions shall be approved by
PFP supplier.
-40 +90 C5-M / CX P13 Under blanket type PFP
JACKET:
Zone 1: carbon steel and stainless steel
(Splash zone)
- Between the crest level of the 100 years wave
superimposed on the maximum surge height
plus the normal Mean High Water Springs
P07/P07²nd (MHWS) and 3 m below the Lowest
-40 +60 (C5-M / CX)+ Im2 Astronomical Tide (LAT) or the annual swell,
(Note 1)
whichever is the greater.
- Boat-landing, Bumpers
For stainless steel, P07²nd shall be used
Zone 2: carbon steel and stainless steel
(Immersed zone)
Area from the bottom of the jacket (including
-40 +60 Im2 P08
buried part) to 2 m above the stability floor.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Operating
temperature Corrosivity
(°C) categories as per System N°. Remarks
SD-NOC-COR-001
Mini Maxi
Zone 3: carbon steel
(Emerged zone)
Area between the crest level of the 50 years
nd wave superimposed on the maximum surge
-40 +60 C5-M / CX P09/P09²
height plus the normal Mean High Water
Springs (MHWS) and the top of the structure.
ROOMS: OPEN (WORKSHOP TYPE) AND AIR CONDITIONED
Visible parts
-40 +80 C3 / C4 / C5-M P15/P15²nd Walls, ceilings
Non visible parts
-40 +80 C3 / C4 / C5-M P16 Walls, ceilings: e.g. insulated wall and ceiling
Floors
P15 for floors under concrete.
-40 +80 C5-M / CX P02/P02²nd For Escape route/ non-skid areas, non-skid
particles shall be added to the painting system.
OTHER
Buried items
Top coat acryl polyurethane can be applied to
-40 +80 Im3 P07²nd
increase eventual chemical resistance
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
Operating
temperature Corrosivity
(°C) categories as per System N°. Remarks
SD-NOC-COR-001
Mini Maxi
I tubes, J tubes, caissons: external surfaces
-40 +60 C5-M / CX and Im2 P07²nd
Disposal caisson, sea water lift caisson: internal surfaces
-40 +60 IM-2 P07²nd
+61 +90 IM-2 P05²nd
Sump caissons: internal surfaces
-40 +60 IM-2 P08
Subsea equipment (wellheads, manifolds, etc.) un-insulated. Carbon steel and stainless steel
-40 +60 IM-2 P08 Top coat shall be light color
+61 +90 IM-2 P17
Subsea equipment (wellheads, manifolds, etc.) insulated. Carbon steel and stainless steel
The painting system, painting application and
-40 +120 IM-2 P17 over coating conditions shall be approved by
insulation material supplier
Note 1: If above 80°C, the splash zone of flare structure shall be cladded with Inconel 625 or Monel
K500 or equivalent.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 01
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Avantguard 750
1 ESI Galvosil 1570 60 1 EPRZ 60
(1736G)
2 EP Hempadur 1557 30 2 EP Hempadur 1557 40
Repair
P 01 H 3 EP Hempadur 4588 150 3 EP Hempadur 4588 150
P01H
Hempathane HS Hempathane HS
4 PUR 50 4 PUR 50
5561 5561
Total NDFT: 290 Total NDFT: 300
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 01 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 02
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 02 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 03
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
1 EPGF Penguard pro GF 300 1 EPGF Penguard pro GF 300 Incorporate Dust with
Jotun antiskid
2 EPGF Penguard pro GF 300 2 EPGF Penguard pro GF 300 Medium aggregates
Repair
P03 J 3 PUR Hardtop XP 50 3 PUR Hardtop XP 50 on Penguard pro
P03 J GF while still wet (not
4 4 polymerized) for non-
slip system
Total NDFT: 650 Total NDFT: 650
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 03 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
1 - - - 1 - - --
2 - - - 2 - -
Repair
- 3 - - - 3 - - -
P03²nd I
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 -- - -
Repair
- 3 - - - 3 - - -
P03²nd J
4 - - - 4 - - -
Total NDFT: - Total NDFT:
1 - - - 1 - - -
2 - - - 2 - - -
Repair
- 3 - - - 3 - - -
P03²nd P
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 04
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Avantguard 750 60
1 ESI Galvosil 1570 60 1 EPRZ
(1736G)
2 EP Hempadur 1557 30 2 EP Hempadur 1557 40
Repair
P04 H
3 EP Hempadur 4588 150 P04 H 3 EP Hempadur 4588 150
4 4
Total NDFT: 240 Total NDFT: 250
Remarks
Specific guarantee requirements: 10 years for overall paint + PFP system
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 04 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Sigmazinc 68
1 EPRZ 60 1 EPRZ Sigmazinc 68 SP 60
SP
2 EP SigmaCover 522 30 2 EP SigmaCover 522 30
Repair
P04²nd P
3 PFP layer P04²nd P 3 PFP layer
4 PUR Sigmadur 550 50 4 PUR Sigmadur 550 50
Total NDFT: - Total NDFT: -
Remarks
Painting system under intumescent epoxy PFP shall be approved by passive fire protection supplier.
Specific guarantee requirements: 10 years for overall paint + PFP system
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 05
Surface preparation: Surface preparation for repair:
Sweep blasting with fine abrasives Sweep blasting with fine abrasives
Roughness: Grit-fine (G) (ISO 8503-2) Roughness: Grit-fine (G) (ISO 8503-2)
Carboguard
1 EP 30 1 EP Carboguard 893SG 30
893SG
2 EP Carboguard 893 150 2 EP Carboguard 893 150
Repair
P05 C Carbothane 134 Carbothane 134
3 PUR 50 P05C 3 PUR 50
series series
4 4
Total NDFT: 230 Total NDFT: 230
Remarks
Specific guarantee requirements: 5 years - Only cracking blistering, and flaking requirements
Qualification / acceptance requirements: Minimum required pull-off test value:
- 2 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 4 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 05 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit - coarse(C) (ISO 8503-2) Roughness: Grit - coarse(C) (ISO 8503-2)
Chemflake
1 VY 500 1 VY Chemflake special 500
special
Chemflake
2 VY 500 2 VY Chemflake special 500
nd
special Repair
P05² J
P05²nd J
3 3
4 4
Total NDFT: 1000 Total NDFT: 1000
Sigmashield
1 VY 500 1 VY Sigmashield 4801 500
4801
Sigmashield
2 VY 500 2 VY Sigmashield 4801 500
nd
4801 Repair
P05² P
P05²nd P
3 3
4 4
Total NDFT: 1000 Total NDFT: 1000
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 06
Surface preparation: Surface preparation for repair:
Degreasing Degreasing
Carboguard
1 EP 30 1 EP Carboguard 893SG 30
893SG
2 EP Carboguard 893 150 2 EP Carboguard 893 150
Repair
P06 C Carbothane 134 Carbothane 134
3 PUR 50 P06C 3 PUR 50
series series
4 4
Total NDFT: 230 Total NDFT: 230
Remarks
Specific guarantee requirements: 5 years - Only cracking blistering, and flaking requirements
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 07
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Avantguard 750
1 ESI Galvosil 1570 60 1 EPRZ 60
(1736G)
Hempadur
2 EP Hempadur 1557 30 2 EP 450
multistrength 4554
Repair
P 07 H
Hempadur P07H
3 EP 380 3
multistrength 4554
4 4
Total NDFT: 470 Total NDFT: 510
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 07 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 6 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 8 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 08
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 3 years, cracking, blistering & flaking requirements only
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 09
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Avantguard 750
1 ESI Galvosil 1570 60 1 EPRZ 60
(1736G)
2 EP Hempadur 1557 30 2 EP Hempadur 4588 250
Repair Hempathane HS
P 09 H 3 EP Hempadur 4588 200 3 PUR 50
P09H 5561
Hempathane HS
4 PUR 50 4
5561
Total NDFT: 340 Total NDFT: 360
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 09 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 5 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - 1 - - -
2 - - 2 - - -
- 3 - - Repair 3 - - -
4 - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 11
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Hempel's silicone
1 ESI Galvosil 1570 60 1 SI 40
1690
2 SI Silicone ALU 5691 25 2 SI Silicone ALU 5691 25
Repair
P11 H
3 SI Silicone ALU 5691 25 P11H 3 SI Silicone ALU 5691 25
4 4
Total NDFT: 110 Total NDFT: 90
Remarks
Specific guarantee requirements: 1 year
Qualification / acceptance requirements: Adhesion as per ISO 16276-2 on primer only:
Cross cut test: Class 0
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 11 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
1 SI Solvalitt 25 1 SI Solvalitt 25
2 SI Solvalitt 25 2 SI Solvalitt 25
nd Repair
P11² J 3 3
P11²nd J
4 4
Total NDFT: 50 Total NDFT: 50
Remarks
Specific guarantee requirements: 1 year
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - 1 - - -
2 - - 2 - - -
- 3 - - Repair 3 - - -
4 - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
1 - - - 1 - - -
2 - - - 2 - - -
- 3 - - - Repair 3 - - -
4 - - - 4 - - -
Total NDFT: - Total NDFT: -
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 13
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 3 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 14
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 3 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 15
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 3 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 15 second
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Specific guarantee requirements: 3 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 4 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 6 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 16
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
1 ESI Carbozinc 11 60 1 - - -
2 2 - - -
Repair
P 16 C 3 3 - - -
P16C
4 4 - - -
Total NDFT: 60 Total NDFT: -
1 ESI Resist 86 60 1 - - -
2 2 - - -
Repair
P 16 J 3 3 - - -
P16J
4 4 - - -
Total NDFT: 60 Total NDFT:
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 17
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
1 EPPH PhenGuard 930 100 1 EPPH PhenGuard 930 100 When used on non-
insulated surfaces,
2 EPPH PhenGuard 935 100 2 EPPH PhenGuard 935 100 and when specific
3 EPPH PhenGuard 940 100 Repair 3 EPPH PhenGuard 940 100 topcoat color is
P 17 P
P17P required, Phenguard
4 4 940 topcoat can be
changed by
Total NDFT: 300 Total NDFT: 300 Sigmaline 780.
Remarks
Specific guarantee requirements: 3 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
P 18
Surface preparation: Surface preparation for repair:
Grade of cleanliness: Sa 3 (ISO 8501-1) Grade of cleanliness: Sa 2 ½ (ISO 8501-1)
Roughness: Grit-medium (G) (ISO 8503-2) Roughness: Grit-medium (G) (ISO 8503-2)
Remarks
Warning: In all case, the maximum individual DFT per coat shall not exceed 150 µm.
Specific guarantee requirements: 3 years
Qualification / acceptance requirements: Minimum required pull-off test value:
- 3 MPa for checks made with mechanical tester (type Ersad, Satec, or equivalent), or
- 5 MPa for checks made with hydraulic tester (Type PAT or equivalent).
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
2.1 Subject
This part of appendix defines the high durability characteristics of the identification stickers on
vessels and piping of offshore platforms.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
2.5 Checks
Stickers are applied without bubbles with full surface adhesion.
Peeling test conforms to DIN 500014. Minimum adhesion value is 5 MPa.
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
2.6 Examples
2.6.1 Principle
IDENTIFICATION
FLUID NAME
AND PRESSURE
BASE REGIME
HP NATURAL GAS
Y/2
X X
HP NATURAL GAS
HP NATURAL GAS
HP NATURAL GAS
Y/2
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
FIRE WATER
METHANOL
COOLING WATER
CLOSED DRAIN
INSTRUMENT AIR
HP FLARE
HP CRUDE OIL
MP CONDENSATE
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.
LEVEL 3 – STANDARD SD-NOC-COR-350
VL- 904
4-DS-101 101320
This document is proprietary to North Oil Company and contains confidential information which may not be reproduced, stored, disclosed or transmitted to any
third party, without the prior written consent of North Oil Company.
The information contained in this document does not substitute for the laws and regulations applicable in Qatar.
Printed versions of this document are uncontrolled, check CMS for latest version.